INSP - Final | 6/23/1997 | 6/23/1997 | 6/23/1997 | A | PASS |
Tom Arcoraci
|
|
|
occ ok
|
Permanent Occupancy | | 6/23/1997 | 6/23/1997 | | DONE |
|
|
|
|
INSP - Final | 6/19/1997 | 6/20/1997 | 6/20/1997 | P | NR |
Tom Arcoraci
|
|
|
automotive detail shop - "Work Groups" need to chk at off
|
INSP - Final | 11/29/1996 | 11/29/1996 | 11/29/1996 | P | PART |
George Slane
|
|
|
|
INSP - Final | 11/29/1996 | 11/29/1996 | 11/29/1996 | P | CANC |
Wes Worcester
|
|
|
George was going to do
|
INSP - Temporary occupancy | 11/29/1996 | 11/29/1996 | 11/29/1996 | P | PART |
George Slane
|
|
|
G Slane issued
|
INSP - Temporary occupancy | 11/21/1996 | 11/25/1996 | 11/27/1996 | | PASS |
|
|
|
Sched. insp. for Temp. Occ. (AY - 11:00 a.m.) Will need to bond for landscaping, curbing, approx 50% of asphalt wrk. striping and ADA Sign (Talked to Jeff Hon-have cost estimates in hand.) **Surety Bond (#5870367) for $18,500.00 posted on 11/27/96/Temp Signed
|
INSP - Final | 11/25/1996 | 11/26/1996 | 11/26/1996 | P | NR |
Wes Worcester
|
|
|
no one there, no plans, or scope of work, 2711 locked, not done!!
|
INSP - Final | 11/26/1996 | 11/26/1996 | 11/26/1996 | | PASS |
|
|
|
/ / 405 - all items complete
|
INSP - Final | 11/20/1996 | 11/20/1996 | 11/20/1996 | | FAIL |
|
|
|
/ / 405 - C/N ISSUED GAS METER PROT NEEDED, RAIN CAPS ON OIL SEP VENT, HARDWARE WRONG (THUMBTURNS)
|
INSP - Framing/Rough-in | 10/15/1996 | 10/16/1996 | 10/16/1996 | P | PASS |
Wes Worcester
|
|
|
10/16/96 342 - 1:30 PM ck on mech r/i otherwise ok
|
INSP - Masonry | 9/20/1996 | 9/23/1996 | 9/23/1996 | A | PASS |
|
|
|
09/23/96 333 - EARLY MON.A.M. - 8:30 APPT. MASN-REBAR OK
|
INSP - Masonry | 9/19/1996 | 9/20/1996 | 9/20/1996 | A | PASS |
Bob Archibald
|
|
|
8:30 A.M. North and south walls to approx. 17'.
|
INSP - Wall cover | 9/17/1996 | 9/18/1996 | 9/18/1996 | P | PART |
Wes Worcester
|
|
|
CMU- BLOCK WALLS/ INSPECTOR TO BE THERE BEFORE 2:00 PER BOB ARCHIBALD/ PLANS PER 342 CORRECTION NOTICE ON BOB'S DESK North and south walls to 13'-6" only. Engineering received from prior cn.
|
INSP - Masonry | 9/12/1996 | 9/13/1996 | 9/13/1996 | A | FAIL |
Wes Worcester
|
|
|
not ready yesterday....missing bar at corners...left with them placing dbl bar and tying in place....today they missed 4 corners. asked general to verify plan w/designer and clarify for subs. 1/A-5 repeated three times on plan w/3 different details...
|
INSP - Masonry | 9/11/1996 | 9/11/1996 | 9/11/1996 | P | FAIL |
Wes Worcester
|
|
|
SCHEDULED TO POUR AT 2:00 needed to place another upright at openings and tie off bar JEFF HON-PAGER-###-####
|
INSP - Masonry | 9/11/1996 | 9/11/1996 | 9/11/1996 | P | PASS |
Wes Worcester
|
|
|
first lift ok. c/n removed
|
INSP - Foundation | 8/5/1996 | 8/5/1996 | 8/5/1996 | P | PASS |
Wes Worcester
|
|
|
late p.m.
|
INSP - Footings | 8/1/1996 | 8/2/1996 | 8/2/1996 | A | PASS |
Wes Worcester
|
|
|
8:30 A.M.
|
INSP - Footings | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | CANC |
|
|
|
08/01/96 333 - LATE PM OR EARLY A.M. FRIDAY given to wes
|