INSP - Final | 3/10/1997 | 3/10/1997 | 3/10/1997 | P | PASS |
Jim Storey
|
|
|
03/10/97 301 - FNL -OK FINAL
|
INSP - Letter of compliance | 3/10/1997 | 3/10/1997 | 3/10/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13735#
|
INSP - Letter of compliance | 3/10/1997 | 3/10/1997 | 3/10/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13735#
|
INSP - Wall cover | 11/18/1996 | 11/18/1996 | 11/18/1996 | P | PASS |
Jim Storey
|
|
|
11/18/96 301 - 1 HR SHAFT ASSEMBLY FRAM-OK FRAMING FRWL-RATED WALL CONST. OK
|
INSP - Final | 11/7/1996 | 11/7/1996 | 11/7/1996 | | PASS |
|
|
|
SHELL AND CORE
|
INSP - Final | 11/6/1996 | 11/6/1996 | 11/6/1996 | P | PART |
Jim Storey
|
|
|
11/06/96 301 - T/O TCO -TEMP C OF O ISSUED C/N FOR RATED ACESS FRAMES TO BE ATCHED PER LIST PUBLICWORKS INSP.
|
INSP - Occupancy Sign-off | 11/14/1996 | 11/6/1996 | 11/6/1996 | | F |
|
|
|
Insp. by Scott Brown - Complies w/ Cond. of DR-120-95/MOD Signed Final Occ. 11/06/96
|
INSP - Final | 11/4/1996 | 11/4/1996 | 11/4/1996 | | NR |
Jim Storey
|
|
|
11/01/96 301 - LATE PM CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 11/1/1996 | 11/1/1996 | 11/4/1996 | P | NR |
Jim Storey
|
|
|
11/04/96 301 - LATE PM UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Framing/Rough-in | 10/9/1996 | 10/10/1996 | 10/10/1996 | P | FAIL |
Jim Storey
|
|
|
10/10/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 10/8/1996 | 10/9/1996 | 10/9/1996 | P | CANC |
Jim Storey
|
|
|
10/09/96 301 -
|
INSP - Ceiling grid | 9/13/1996 | 9/13/1996 | 9/12/1996 | P | PASS |
|
|
|
09/13/96 338 - late p.m. made ok 1st 1/2 of shafts ok
|
INSP - Framing/Rough-in | 9/6/1996 | 9/9/1996 | 9/9/1996 | P | FAIL |
Jim Storey
|
|
|
09/09/96 301 - LATE P.M. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Flatwork | 8/8/1996 | 8/8/1996 | 8/8/1996 | P | PASS |
Jim Sly
|
|
|
08/08/96 316 - SLAB FLR OK. ì
|
INSP - Foundation | 7/26/1996 | 7/26/1996 | 7/26/1996 | | PASS |
|
|
|
/ / 333 - FDN -OK FOUNDATION
|
INSP - Foundation | 7/26/1996 | 7/26/1996 | 7/26/1996 | P | PART |
Jim Storey
|
|
|
07/26/96 301 - trans to kim m.
|
INSP - Conference | 7/25/1996 | 7/25/1996 | 7/25/1996 | A | PASS |
Wes Worcester
|
|
|
getting cover and placing second mat per top and bottom notation on plans.. Shop is upset w/shop drawings and insp request for double mat as per plan
|
INSP - Footings | 7/24/1996 | 7/25/1996 | 7/25/1996 | A | PASS |
Wes Worcester
|
|
|
9 A.M. THURSDAY
|
INSP - Footings | 7/25/1996 | 7/25/1996 | 7/25/1996 | A | NR |
Wes Worcester
|
|
|
|
INSP - Foundation | 7/25/1996 | 7/25/1996 | 7/25/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Conference | 7/24/1996 | 7/24/1996 | 7/24/1996 | A | PART |
Wes Worcester
|
|
|
dbl mat requirements
|
INSP - Footings | 7/24/1996 | 7/24/1996 | 7/24/1996 | A | FAIL |
Wes Worcester
|
|
|
calls for dbl mat
|
INSP - Footings | 7/24/1996 | 7/24/1996 | 7/24/1996 | A | NR |
Wes Worcester
|
|
|
still trying to get cover
|
INSP - Footings | 7/23/1996 | 7/24/1996 | 7/24/1996 | A | NR |
Jim Storey
|
|
|
07/24/96 301 - transphered to wes w.
|
INSP - Foundation | 7/24/1996 | 7/24/1996 | 7/24/1996 | A | NR |
Wes Worcester
|
|
|
still trying to get cover requirements
|
INSP - Foundation | 7/19/1996 | 7/19/1996 | 7/19/1996 | P | PASS |
Jim Sly
|
|
|
07/19/96 316 - stem wall - spec.inspector will be there at 12:30. OK T Jim Sly.
|
INSP - Footings | 7/17/1996 | 7/18/1996 | 7/18/1996 | A | PASS |
Jim Storey
|
|
|
07/18/96 301 - J SLY PERFORMED INSP. BEFORE I ARIVED
|
INSP - Footings | 7/18/1996 | 7/18/1996 | 7/18/1996 | | PART |
Jim Sly
|
|
|
/ / 316 - Inspection of Footings ...S. and W. sides (F1-F2). OK
|