Permit Information
Permit NumberBLD96-00571
StatusFinaled
Name LARRY KERR
Site Address 1683 E HAYS CT
Project Name 
Customer Number 
ePlanReviewNo
Description
TO BUILD A NEW 3042 SF ONE STORY WITH DAYLIGHT BASEMENT SINGLE FAMILY DWELLING WITH AN ATTACHED 734SF THREE CAR GARAGE AND 606SF OF CONCRETE PATIO AND WOODEN DECK AS PER APPROVED PLANS AND ATTACHED ENGINEERING AND CORRECTION LIST. A CLASS "A" ROOF IS REQUIRED FOR THIS DWELLING. (BASEMENT=1521SF)(MAIN FLOOR=1521SF) NOTE: ALL HILLSIDE REQUIREMENTS APPLAY ON THIS LOT. FINAL GRADING AND DRAINAGE INSPECTIONS MUST BE DONE BY THE DESIGNING ENGINEER AND PUBLIC WORKS DEPARTMENT OF THE CITY OF BOISE AND AN APPROVAL LETTER SUBMITTED TO THE BUILDING DEPARTMENT PRIOR TO APPROVAL FOR OCCUPANCY. 1991 EDITION OF UBC. ACHD# 95-1598. PLAN CHECK # 180. CU-43-90. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance9/3/19979/3/19979/4/1997PPASS
DetailsWes Worcester
c/c issued after mech c/n done
INSP - Grading Inspection9/4/1997 9/4/1997 PASS
DetailsRita DeYoung
Grading and revegetation are completed. Site work is approved by Public Works.
INSP - Final9/3/19979/3/19979/3/1997PPASS
DetailsWes Worcester
LATE PM NOT AT 1:30 AS YOU PLAN LATE PM
INSP - Conference8/7/19968/7/19968/7/1996PPASS
DetailsWes Worcester
met w/engineer and he is drawing up something for Kerr
INSP - Energy code compliance8/7/19968/7/19968/7/1996PPASS
DetailsWes Worcester
INSP - Framing/Rough-in8/7/19968/7/19968/7/1996PPASS
DetailsWes Worcester
still working on gable wall
INSP - Framing/Rough-in8/6/19968/6/19968/6/1996PNR
DetailsWes Worcester
REINSPECT FRAME
INSP - Conference8/2/19968/2/19968/2/1996AFAIL
DetailsWes Worcester
framing sub called reference c/n placed originally and added for second time when not done. I had went over c/n with Larry Kerr previously..Several items still not done
INSP - Framing/Rough-in7/31/19967/31/19967/31/1996PPART
DetailsWes Worcester
0k to insulate
INSP - Framing/Rough-in7/30/19967/31/19967/31/1996PFAIL
DetailsWes Worcester
truss bracing, overheighth gable wall
INSP - Framing/Rough-in7/24/19967/25/19967/25/1996AFAIL
DetailsWes Worcester
truss eng not done, plans not on site, tji in contact w/concrete, mech c/n, gable wall over 10' w/excessive deflection
INSP - Foundation6/14/19966/17/19966/16/1996APART
DetailsWes Worcester
06/14/96 342 - REBAR for z that was poured out of position and SW retain waiting on eng report for fix of z...Marcum said they might as well call eng whenever they pour rather than the Building Dept (specifically inspe
INSP - Foundation5/3/19965/3/19965/3/1996 NR
DetailsWes Worcester
/ / 342 -
INSP - Foundation5/3/19965/3/19965/3/1996 FAIL
DetailsWes Worcester
/ / 342 - poured w/o insp, was not reaady yesterday nor the day before crew yesterday to get it ready and call for insp. They did not have bar off nor clearance in several locations. no access to forms either. I cra up side forms, twis
INSP - Foundation5/7/19965/7/19965/1/1996PNR
DetailsWes Worcester
05/07/96 342 - TUES.PM. LATE ì
INSP - Foundation5/1/19965/2/19964/26/1996ACANC
DetailsWes Worcester
05/02/96 342 - LATE A.M. Referred to Bob Archibald
INSP - Foundation5/1/19965/1/19964/26/1996PNR
DetailsWes Worcester
05/01/96 342 -
INSP - Footings4/19/19964/22/19964/22/1996APASS
DetailsWes Worcester
POURED AND ENGINEER HAS BEEN CALLED
INSP - Footings4/19/19964/19/19964/19/1996PPART
DetailsWes Worcester
pm later Hillside applies and will have eng address as builts