INSP - Final | 10/29/1997 | 10/30/1997 | 10/30/1997 | A | PASS |
Jim Storey
|
|
|
10/29/97 301 - EVERYTHING ELSE IS FINALED
|
INSP-Final Inspection | 10/2/1997 | 10/3/1997 | 10/3/1997 | A | PASS |
Rick Jackson
|
|
|
CHEVRON STORE c/o signed
|
INSP - Final | 4/29/1997 | 4/30/1997 | 4/30/1997 | P | PART |
Jim Storey
|
|
|
04/30/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED tenp ok contractor has card.
|
INSP - Final | 4/28/1997 | 4/28/1997 | 4/28/1997 | P | NR |
Jim Storey
|
|
|
04/28/97 301 - SEWER EJECTION PUMB
|
INSP - Final | 4/28/1997 | 4/28/1997 | 4/28/1997 | P | PART |
|
|
|
JACK ###-#### temp occ ok, rear exit door has knob, needs lever
|
INSP - Ceiling grid | 4/14/1997 | 4/14/1997 | 4/14/1997 | | PART |
Jim Storey
|
|
|
04/14/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 3/20/1997 | 3/20/1997 | 3/20/1997 | P | PASS |
George Slane
|
|
|
|
INSP - Framing/Rough-in | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | PART |
Jim Storey
|
|
|
03/17/97 301 - FRAM-OK FRAMING OTH-OTHER AGENCIES NOT APPROVED mec
|
INSP - Framing/Rough-in | 3/6/1997 | 3/6/1997 | 3/6/1997 | P | NR |
Jim Storey
|
|
|
03/06/97 301 - WIP -WORK IN PROGRESS
|
INSP - Masonry | 2/26/1997 | 2/27/1997 | 2/27/1997 | A | PASS |
Jim Storey
|
|
|
02/27/97 301 - FRMS-OK FORMS-REBAR
|
INSP - Masonry | 2/24/1997 | 2/25/1997 | 2/25/1997 | A | FAIL |
Jim Storey
|
|
|
02/25/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OR SUPLLY ENGINEERING TO JUST
|
INSP - Masonry | 2/25/1997 | 2/25/1997 | 2/25/1997 | P | FAIL |
Jim Storey
|
|
|
02/25/97 301 - C/N POSTED
|
INSP - Masonry | 2/24/1997 | 2/24/1997 | 2/24/1997 | P | NR |
Jim Storey
|
|
|
02/24/97 301 -
|
INSP - Masonry | 2/18/1997 | 2/18/1997 | 2/18/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - MASN-REBAR OK
|
INSP - Masonry | 2/14/1997 | 2/18/1997 | 2/18/1997 | A | NR |
Jim Storey
|
|
|
02/18/97 301 - WIP -WORK IN PROGRESS
|
INSP - Footings | 1/6/1997 | 1/7/1997 | 1/7/1997 | A | PART |
Jim Storey
|
|
|
01/07/97 301 - special insp required scope of work to be submited, 3500
|
INSP - Footings | 1/6/1997 | 1/6/1997 | 1/6/1997 | P | CANC |
Jim Storey
|
|
|
01/06/97 301 - cancled by contractor via phone.
|
INSP-Conference | 11/21/1996 | 11/21/1996 | 11/21/1996 | | PART |
|
|
|
witnessed bedding of three UST and verified tank cert #'s UL898261, UL898262, UL898259. Will not cover above invert before reinspection
|