BLD-Final | 11/1/2000 | 11/2/2000 | 11/2/2000 | A | PASS |
Dave Hannah
|
|
|
dick- ###-#### fn--re-insp
|
Permanent Occupancy | | 11/2/2000 | 11/2/2000 | | DONE |
|
|
|
|
BLD-Conference | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/30/2000 w carpenter re c/n
|
BLD-Conference | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PART |
|
|
|
Scheduled by Inspector: 338 On 8/14/2000 info for 340 8/14/2000 4:36:49 PM
|
BLD-Final | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### ; c/n, guard rail, 1hr "seal " at rated lids at stairs, ADA rrm grab bar, etc. ok for t/o 8/14/2000 4:28:08 PM
|
FIRE-Final Inspection | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | PASS |
Joe Tawney
|
|
|
re-insp fn-- jack-- wenskey-- ###-#### Reinsp. ok for certificate of completion. 7/19/00 10:06:25 AM
|
FIRE-Final Inspection | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | FAIL |
Joe Tawney
|
|
|
Jack ###-#### Reinsp. fail smoke detectors & inspection opening. 7/7/00 1:22:41 PM
|
FIRE-Final Inspection | 5/23/2000 | 5/23/2000 | 5/23/2000 | P | FAIL |
Joe Tawney
|
|
|
only there till 4 pm Jack ###-#### Reinsp. fail 3 items still not connected 5/24/00 11:14:15 AM
|
BLD-Conference | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | PASS |
Carl Dependahl
|
|
|
Rod ###-#### met with plumber (Terrel Plbg , Rod) : Put proposal on paper for review.
|
BLD-Final | 1/4/2000 | 1/5/2000 | 1/5/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-#### HOME ###-#### CHURCH. Need P&Z & fire.. no insp. performed.
|
FIRE-Final Inspection | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | FAIL |
Joe Tawney
|
|
|
RICHARD--- ###-#### FN FIRE Final fail C/N issued.
|
FIRE-Final Inspection | 11/22/1999 | 11/23/1999 | 11/23/1999 | P | NR |
Joe Tawney
|
|
|
Dick palmer ###-#### ready after 9am Final not ready for insp. To be rescheduled.
|
BLD-Final | 9/20/1999 | 9/22/1999 | 9/22/1999 | A | FAIL |
Carl Dependahl
|
|
|
robin--church sec ###-#### fn insp-CALL 1ST BEFORE INSP Conf. W/Dick Palmer, Proj. Mgr.. Need card & plans onsite
|
INSP-Conference | 11/18/1998 | 11/19/1998 | 11/19/1998 | A | PART |
Joe Tawney
|
|
|
11/19/98 406 - BRIAN ###-#### FOR CONF PRE FINAL CONF ON EXITS, LIGHTS, DOORS,AND EXT
|
INSP - Framing/Rough-in | 7/13/1998 | 7/14/1998 | 7/14/1998 | A | CANC |
|
|
|
07/14/98 338 - partial framing dick ###-####
|
INSP - Framing/Rough-in | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | PASS |
|
|
|
02/27/98 333 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 2/24/1998 | 2/25/1998 | 2/25/1998 | A | PART |
|
|
|
02/25/98 333 - bathrooms and nursery onlyrichard ###-####
|
INSP - Conference | 11/19/1997 | 11/20/1997 | 11/20/1997 | A | PASS |
|
|
|
questions on the corridor walls and the rated floor ceiling assys ok to rock 1 side of framing to show trus fire block placement
|
INSP - Conference | 11/18/1997 | 11/19/1997 | 11/19/1997 | A | CANC |
|
|
|
cancelled till 11-20-97 at 11 :oo
|
INSP - Framing/Rough-in | 11/14/1997 | 11/18/1997 | 11/18/1997 | A | NR |
|
|
|
11/18/97 333 - will reschedule
|
INSP - Conference | 11/3/1997 | 11/13/1997 | 11/13/1997 | P | PASS |
|
|
|
###-#### call first {dick palmer} dave patterson
|
INSP - Carpentry | 6/3/1997 | 6/3/1997 | 6/3/1997 | | PASS |
|
|
|
/ / 338 -
|
INSP - Carpentry | 6/3/1997 | 6/3/1997 | 6/3/1997 | P | CANC |
|
|
|
06/03/97 338 - post til 06-04-97
|
INSP - Framing/Rough-in | 5/19/1997 | 5/19/1997 | 5/19/1997 | P | NR |
|
|
|
/ / 333 - not ready OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Masonry | 5/1/1997 | 5/1/1997 | 5/1/1997 | P | PART |
Carl Dependahl
|
|
|
05/01/97 340 - GROUT; PENDING SPEC INSP REPORT, APPEARS OK
|
INSP - Masonry | 4/29/1997 | 4/29/1997 | 4/29/1997 | P | PART |
Carl Dependahl
|
|
|
04/29/97 340 - mti onsite for grout pour, spoke w/ supt. pending spec in
|
INSP - Masonry | 4/24/1997 | 4/25/1997 | 4/25/1997 | A | PASS |
|
|
|
04/25/97 338 - made ok with sp insp approval
|
INSP - Masonry | 4/21/1997 | 4/21/1997 | 4/21/1997 | P | PASS |
|
|
|
04/22/97 338 - GROUT made ok with sp insp approval
|
INSP - Masonry | 4/18/1997 | 4/21/1997 | 4/21/1997 | A | PASS |
|
|
|
04/22/97 338 - pouring 2 yards. made ok with sp insp ok
|
INSP - Masonry | 4/18/1997 | 4/18/1997 | 4/18/1997 | P | PASS |
|
|
|
04/18/97 338 - elevator shaft made ok
|
INSP - Masonry | 4/15/1997 | 4/16/1997 | 4/16/1997 | P | PASS |
|
|
|
/ / 338 - made ok RAM-OK FRAMING
|
INSP - Framing/Rough-in | 4/7/1997 | 4/7/1997 | 4/6/1997 | P | PART |
|
|
|
04/07/97 338 - partial ok to start cover on one side of the basement cor allowed in the corridor wall
|
INSP - Framing/Rough-in | 3/31/1997 | 3/31/1997 | 3/30/1997 | P | NR |
|
|
|
/ / 338 - new hood is installed appears tro be to an existing shaft ca they will get back to me
|
INSP - Foundation | 11/8/1996 | 11/8/1996 | 11/8/1996 | P | |
|
|
|
FND. STEM WALL
|
INSP - Foundation | 10/28/1996 | 10/29/1996 | 10/29/1996 | P | PASS |
|
|
|
10/29/96 338 - made ok r-bar placed BASEMENT
|
INSP - Framing/Rough-in | 10/25/1996 | 10/25/1996 | 10/25/1996 | P | NR |
|
|
|
10/25/96 339 - nobody there
|
INSP - Framing/Rough-in | 10/24/1996 | 10/24/1996 | 10/25/1996 | P | NR |
|
|
|
10/24/96 338 - nobody home
|
INSP - Foundation | 10/7/1996 | 10/7/1996 | 10/6/1996 | P | PASS |
|
|
|
10/08/96 338 -
|
INSP - Framing/Rough-in | 9/30/1996 | 9/30/1996 | 9/26/1996 | P | NR |
|
|
|
09/30/96 338 - PARTIAL FRAME???
|
INSP - Foundation | 8/1/1996 | 8/2/1996 | 8/2/1996 | A | PASS |
|
|
|
pass, 325
|
INSP - Footings | 7/31/1996 | 8/1/1996 | 7/31/1996 | A | PASS |
|
|
|
CURT - ###-####. YOU WERE DOING THIS WED.P.M.
|
INSP - Conference | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PASS |
|
|
|
/ / 338 - UPDATE WP
|