Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD96-01004
StatusFinaled
Name EXTENDED STAY AMERICA
Site Address 2500 S VISTA AVE
Project NameEXTENDED STAY MOTEL
Customer Number 
ePlanReviewNo
Description
EXTENDED STAY AMERICA * TO CONSTRUCT A NEW 44,662 SQ.FT, TWO STORY, WOOD FRAMED, TYPE V-ONE-HOUR, 106 UNIT MOTEL WITH KITCHEN FACILITIES, GUEST STORAGE AND LAUNDRY ROOM. EACH FLOOR IS APPROXIMATELY 22,331 SQ.FT. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM IS BEING USED FOR ALLOWABLE AREA INCREASE. THIS PERMIT IS INCLUDING RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST, CABO/ANSI STANDARDS, THE 1994 EDITION OF THE UBC AND BOISE CITY ENERGY CODE. MJP (PC# 208-96) DR#-31-96
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final2/28/19972/28/19972/28/1997APASS
Details
final occupancy appproved
Permanent Occupancy 2/28/19972/28/1997 DONE
Details
INSP - Final2/11/19972/12/19972/11/1997APART
DetailsJim Storey
02/11/97 301 - FINAL FOR C/O. FNL -OK FINAL pending code enforcement sign off.
INSP - Final2/6/19972/6/19972/7/1997PPART
DetailsJim Storey
02/07/97 301 - part
INSP - Final1/29/19971/29/19971/29/1997PPART
DetailsJim Storey
01/29/97 301 - TCO -TEMP C OF O ISSUED ADA HEIGHTS C/N 90 DAY OCC.
INSP - Final1/27/19971/28/19971/28/1997APART
DetailsJim Storey
01/28/97 301 - MET W/STEVE W/ACME HE WILL FAX THE FIRE ASSMBLY TO ME FOR
INSP - Final1/22/19971/23/19971/23/1997PNR
DetailsJim Storey
01/23/97 301 - FINAL FOR C/O. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Temporary occupancy1/22/19971/23/19971/23/1997 PASS
Art Yingling insp. for Temp. Occ. - Bond $852.00/complete landscape around dumpster area/H/C Sign/shield lighting
INSP - Final1/21/19971/22/19971/22/1997PNR
DetailsJim Storey
01/22/97 301 -
INSP - Final1/17/19971/21/19971/21/1997AFAIL
Details
c/n issued.....temp on hold for corridor penetration problems at electrical closets.
INSP - Final1/21/19971/21/19971/21/1997PFAIL
Details
reinspection for corridor and air pressure alarms. both not complete, dropped off code reference 1/22 regarding air pressure monitoring requirements
INSP - Final1/17/19971/21/19971/21/1997AFAIL
DetailsJim Storey
01/21/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Conference1/16/19971/17/19971/17/1997ANR
DetailsJim Storey
01/17/97 301 - SEE NATHAN - HE NEEDS ADVICE ON FINAL INSPECTION - WOULD IF POSSIBLE
INSP - Final1/15/19971/15/19971/15/1997PFAIL
Details
alarm system tested, c/n issued for problems. Sprinklers off, not able to test tampers, other lif safety issues delayed until alarms complete at contractors request
INSP - Final1/13/19971/13/19971/13/1997PFAIL
Details
tested sprinkler flow alarms and dry system time test. all passed.......alarms not complete, tampers not connected, will call when ready
INSP - Ceiling grid12/20/199612/23/199612/23/1996PPASS
DetailsJim Storey
12/23/96 301 - SUSPENDED CEILING - 1ST FLOOR SCLG-OK SUSPENDED CEILING
INSP - Framing/Rough-in12/6/199612/9/199612/9/1996APASS
DetailsJim Storey
12/09/96 301 - FRAM-OK FRAMING fire wall ok back of entry
INSP-Supply line flush12/2/199612/3/199612/3/1996ACANC
Details
12/03/96 405 - 10 AM, LAST SEGMENT OF SPRINKLER INSPECTIONS duplicate entry
INSP-Supply line flush12/2/199612/3/199612/3/1996APASS
Details
12/03/96 405 - TOD WOODS - ###-#### flush witnessed
INSP-Conference12/2/199612/2/199612/2/1996PPASS
Details
MET WITH CONTRACTOR AND DESIGNATED LOCATION OF STRIPING FOR FIRE LANE AND kNOX BOX LOCATION
INSP-Sprinkler Rough-in/Hydro11/26/199611/26/199611/26/1996PPART
Details
TODD WOOD -(SHOP) ###-#### HE WOULD LIKE THIS EARLY P.M. hydro wet, dry, fdc....need ug flush
INSP - Wall cover11/25/199611/25/199611/25/1996PFAIL
DetailsJim Storey
11/25/96 301 - LOBBY AREA - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED n/r with rated const. at sout lobby entry.
INSP - Wall cover11/21/199611/22/199611/22/1996PNR
DetailsJim Storey
11/22/96 301 - PARTIAL - LOBBY AREA n/r
INSP - Fire Dept. Request11/15/199611/15/199611/15/1996 PASS
Details
/ / 405 - recheck corridor supports and south wing attic piping ok to cover, one addl support req'd, will check from catwalk
INSP-Sprinkler Rough-in/Hydro11/14/199611/15/199611/15/1996ANR
Details
11/14/96 405 - not ready, return pm
INSP - Framing/Rough-in11/13/199611/14/199611/14/1996PPART
Details
11/14/96 333 - FRAM-OK FRAMING south wing upper
INSP - Energy code compliance11/12/199611/12/199611/12/1996 PASS
DetailsJim Storey
/ / 301 - north wing 2nd floor, south wing 1st floor INSL-OK INSULATION-ENERGY CODE FRAM-OK FRAMING
INSP - Energy code compliance11/12/199611/12/199611/12/1996 PASS
DetailsJim Storey
/ / 301 - north wing 2nd floor, south wing 1st floor INSL-OK INSULATION-ENERGY CODE FRAM-OK FRAMING
INSP - Framing/Rough-in11/8/199611/12/199611/12/1996PPASS
DetailsJim Storey
11/12/96 301 - 1ST FLOOR south wing ok for cover FRAM-OK FRAMING INSL-OK INSULATION-ENERGY CODE
INSP - Framing/Rough-in11/8/199611/8/199611/8/1996 PART
DetailsJim Storey
11/08/96 301 - INSL-OK INSULATION-ENERGY CODE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED FOR PIPE PENATRATIONS. OK TO ALL BUT THOSE P
INSP - Framing/Rough-in11/7/199611/8/199611/8/1996PPART
DetailsJim Storey
11/08/96 301 - INSL-OK INSULATION-ENERGY CODE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED FOR PIPE PENATRATIONS. OK TO ALL BUT THOSE P
INSP-Sprinkler Rough-in/Hydro11/7/199611/8/199611/8/1996APART
Details
2ND FLOOR AND ATTIC OF FIRST WING attic not complete, need more supports in corridor, do not cover corridor
INSP - Framing/Rough-in11/6/199611/7/199611/7/1996PFAIL
DetailsJim Storey
11/07/96 301 - 2 ND FLOOR OF NORTH WING. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in11/5/199611/6/199611/6/1996ACANC
DetailsJim Storey
11/05/96 301 - CANCLED BY CONTRACTOR VIA PHONE. 1ST FLOOR
INSP - Framing/Rough-in10/28/199610/28/199610/28/1996PPART
DetailsJim Storey
10/28/96 301 - BOTTOM FLOOR - NORTH WING. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK TO START INSULATION
INSP - Carpentry10/17/199610/17/199610/17/1996 PART
DetailsJim Storey
/ / 301 - FIRST FLOOR CEILLING N/SOUTH CORRORDOR OK TO ROCK.
INSP - Framing/Rough-in10/17/199610/17/199610/17/1996PPASS
DetailsJim Storey
10/17/96 301 - ROOF NAILING NORTHWING OK
INSP - Roof10/16/199610/16/199610/16/1996PPASS
DetailsJim Storey
10/16/96 301 - ROOF SHEATHING NAILLING NORTH WING OK
INSP - Wall cover10/14/199610/15/199610/15/1996APART
DetailsJim Storey
10/15/96 301 - NORTH CORRIDOR CEILLING OK FOR COVER ONLY THE CEILLING DR AND CAN BE VERRIFIED FROM THE ROOM SIDE.
INSP-Sprinkler Rough-in/Hydro10/14/199610/14/199610/14/1996PPART
Details
10/14/96 405 - rough in for cover, first floor only
- INSP SPRINKLER ROUGH-IN/HYDR10/1/199610/1/199610/1/1996 PASS
Details
/ / 405 - ug hydro.....not yet flushed
INSP - Conference9/6/19969/6/19969/6/1996 PASS
DetailsJim Storey
/ / 301 - cost conf.
INSP - Footings9/3/19969/4/19969/4/1996PPART
DetailsJim Storey
/ / 301 - POURING AT 10 A.M. covered by special insp. dust control req CI-LETTER OF COMPLIANCE ISSUED 11578
INSP - Footings8/29/19968/29/19968/29/1996PPART
DetailsJim Storey
08/29/96 301 - covered by si pending report