BLD-Other | 9/13/2000 | 9/13/2000 | 9/13/2000 | | PASS |
|
|
|
Dave Hattrick and I reviewd cable guardrails at this site. 3"oc on guard intermediates on stair and 4"oc on balcony. Three eights cable with tension devices installed on each cable
|
INSP - Final | 3/31/1997 | 4/2/1997 | 4/2/1997 | A | PASS |
Carl Dependahl
|
|
|
04/02/97 340 - FINAL FOR C/O. OK, CARD TO CONT.
|
INSP - Conference | 3/10/1997 | 3/10/1997 | 3/10/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NEED ALL OKS FOR FINAL C/O
|
INSP - Carpentry | 2/24/1997 | 2/24/1997 | 2/24/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - EGRESS CONTROLLS AT PERSONNEL APPEAR TO MEET CITY STDS
|
INSP - Conference | 1/30/1997 | 1/30/1997 | 1/30/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NEE OTHER SIGS FOR C/O
|
INSP - Final | 12/3/1996 | 12/4/1996 | 12/5/1996 | P | PASS |
Joe Tawney
|
|
|
12/04/96 406 - FINAL FOR C/O. OK FOR PERM OCC AND ASSEMBLY PERMIT
|
INSP - Carpentry | 11/26/1996 | 11/26/1996 | 11/26/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/MEL S. CHK ATRIUM & THEATER FOR FINISH REQ'S, KEEP C/N
|
INSP - Conference | 11/22/1996 | 11/22/1996 | 11/22/1996 | P | PASS |
Carl Dependahl
|
|
|
11/22/96 340 - PROGRESS FOR FINAL AT THEATRE & ATRIUM
|
INSP - Carpentry | 11/19/1996 | 11/19/1996 | 11/19/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CHK PROGRESS FOR ATRIUM, REC'D ARCH'S RESPONSE TO C/N. SMOKE
|
INSP - Carpentry | 11/7/1996 | 11/7/1996 | 11/7/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - OBSERVED EMER GENERATOR AND ALARM TESTING W/ JOE TAWNEY
|
INSP - Set-back | 11/6/1996 | 11/6/1996 | 11/6/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - FINISH REQ'S FOR OCCUPANCY; CONSULT W/ G.S.
|
INSP - Temporary occupancy | 11/5/1996 | 11/5/1996 | 11/5/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - VANILLA FINISH W/ BLD96-1074; PARTIAL, ATRIUM, THEATER, & KI NOR APPROVED FOR OCCUPANCY, C/N ISSUED. OK FOR T/O PER G.S. CARD TO CONT
|
INSP - Final | 11/4/1996 | 11/4/1996 | 11/4/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - VANILLA FINISH W/ BLD96-1074; C/N. SEE NOTE W/ THAT INSP. 11
|
INSP - Conference | 10/31/1996 | 10/31/1996 | 10/31/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/BOB G RE FINAL AT TCI
|
INSP - Conference | 10/24/1996 | 10/24/1996 | 10/24/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED FINISH REQ'S W/ LAVAR, ASS'T SUPT.
|
INSP - Conference | 9/30/1996 | 9/30/1996 | 9/30/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CHK PLAN FOR FINISH
|
INSP - Conference | 9/24/1996 | 9/24/1996 | 9/24/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED SIGNAGE AND FINISH WORK; SOME WIP...ACCESS FLOOR S
|
INSP - Conference | 9/18/1996 | 9/18/1996 | 9/18/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ STEVE DUREN PROJECT MGR. FOR CONST. ASSOC. RE: PLAN RESUB POSSIBLE CORRIDOR MODIFICATION DUE TO C/N.
|
INSP - Conference | 9/17/1996 | 9/17/1996 | 9/17/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - SEE NOTE W/ BLD96-1074 THIS DATE
|
INSP - Carpentry | 9/13/1996 | 9/13/1996 | 9/13/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - CHK'D BEAMS AT SHAFTS & CORR...NEED FIRESTOPPING & ENCLOSURE 7 & 10 FOR 1HR
|
INSP - Conference | 9/12/1996 | 9/12/1996 | 9/12/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED CORR PENETRATIONS & SHAFTS W/ CARL W...KEEP C/N
|
INSP - Framing/Rough-in | 9/11/1996 | 9/11/1996 | 9/11/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - CN, NEED ARCH'S DETAIL RE SHAFTS & CORR'S
|
INSP - Conference | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - SPOKE W/ 3M TECH. ENG...WILL FAX FURTHER DATA FOR FIREMASTER
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ BLD96-1074
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ BLD96-1074
|
INSP - Conference | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ BOB G...RE: DUCT INSUL SYSTEMS: PABCO & FIREMASTER (resub substitution)
|
INSP - Conference | 8/29/1996 | 8/29/1996 | 8/29/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - rec'd resub. for doors and deletion of sidelights at corr's. at comp room, ok to reverse as occ load< 25
|