Permanent Occupancy | | 8/25/1998 | 8/25/1998 | | DONE |
|
|
|
|
INSP - Final | 5/14/1997 | 5/14/1997 | 5/14/1997 | P | PART |
Jim Storey
|
|
|
05/14/97 301 - TENP OCC. OK CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 5/12/1997 | 5/13/1997 | 5/13/1997 | A | NR |
Jim Storey
|
|
|
05/13/97 301 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 5/13/1997 | 5/13/1997 | 5/13/1997 | P | PART |
|
|
|
mk plaza 1 floors basement through 6th basement missing doors in corridor, some on other floors but corridor is not rated above basement, still need smoke evac sys
|
INSP - Framing/Rough-in | 2/5/1997 | 2/5/1997 | 2/5/1997 | P | NR |
Jim Storey
|
|
|
02/05/97 301 - CALL JOHN MATHEWS - ###-#### SO HE CAN MEET YOU. NWP -GENERAL INSPECTION - NO WORK IN PROGRESS conf.
|
INSP-Conference | 1/14/1997 | 1/14/1997 | 1/14/1997 | A | PASS |
|
|
|
met at site to review elevator and stairway signage w/ Bill Cramer ###-####
|
INSP - Wall cover | 12/31/1996 | 12/31/1996 | 12/31/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Carpentry | 12/27/1996 | 12/27/1996 | 12/27/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - LID ASSEMBLY AT ENCLOSURE EXT. OK TO ROCK UNDERSIDE.
|
INSP - Carpentry | 12/27/1996 | 12/27/1996 | 12/27/1996 | | NR |
Carl Dependahl
|
|
|
/ / 340 - EXIT PASSAGE ,342 AREA NR...NEED PLAN
|
INSP - Framing/Rough-in | 12/24/1996 | 12/27/1996 | 12/27/1996 | A | CANC |
Alan Hauser
|
|
|
12/27/96 350 - contact john mathews cel ###-#### wes had called it carpe framing inspection. TO BE DONE BY #340
|
INSP - Foundation | 12/19/1996 | 12/19/1996 | 12/19/1996 | P | PASS |
Wes Worcester
|
|
|
rebar ok
|
INSP - Masonry | 12/19/1996 | 12/19/1996 | 12/19/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Conference | 12/17/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Wes Worcester
|
|
|
CALL JOHN 1:30 PM.
|
INSP - Foundation | 12/18/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Wes Worcester
|
|
|
epoxy set rebar ok
|
INSP - Masonry | 12/18/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Wes Worcester
|
|
|
no. wall ok
|
INSP - Conference | 12/17/1996 | 12/17/1996 | 12/17/1996 | P | PART |
Wes Worcester
|
|
|
talked to John Matthews about scheduling insp
|
INSP - Conference | 12/16/1996 | 12/17/1996 | 12/17/1996 | A | NH |
Wes Worcester
|
|
|
HE WILL CALL YOU TO SCHEDULE A TIME WITH YOU no infp at numbers given....talked to Tom and he was to relay..
|
INSP - Conference | 12/16/1996 | 12/16/1996 | 12/16/1996 | P | PASS |
|
|
|
12/16/96 333 - wall ok
|
INSP - Conference | 12/9/1996 | 12/9/1996 | 12/9/1996 | P | PASS |
Wes Worcester
|
|
|
making another copy so we can put one in plan vault, draft stopping above 2 hr tunnel with mineral wool
|
INSP - Conference | 11/26/1996 | 11/27/1996 | 11/27/1996 | P | PASS |
Wes Worcester
|
|
|
6TH FLOOR
|
INSP - Conference | 11/12/1996 | 11/13/1996 | 11/13/1996 | A | PASS |
Wes Worcester
|
|
|
11 A.M.
|
INSP - Carpentry | 10/29/1996 | 10/29/1996 | 10/29/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - c/n for i hr walls and ceiling construction
|
INSP - Conference | 10/25/1996 | 10/25/1996 | 10/29/1996 | P | FAIL |
Wes Worcester
|
|
|
10/29/96 342 - JOHN MATHEWS CELL ####-#### 1:30 APPOINTMENT
|