Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD96-01709
StatusFinaled
Name MICHAEL PETERSON
Site Address 5355 W STATE ST
Project NameDENTAL OFFICE
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 2-STORY, 4065 SQ.FT. DENTAL OFFICE BUILDING WITH 3585 SQ. FT. ON THE 1ST FLOOR AND 480 SQ. FT. ON THE 2ND FLOOR. CONSTRUCTION WILL BE WOOD FRAMED TYPE V-N WITH EIFS AND RIVER ROCK EXTERIOR FINISH. OTHER WORK INCLUDES ALL SITE WORK, PARKING LOT, LANDSCAPING AND TRASH ENCLOSURE FOR THIS BUILDING PER DR#-42-96, CU#-19-96, PC#323-96 AND 94 UBC.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final8/25/19988/27/19988/27/1998APASS
DetailsWes Worcester
08/27/98 342 - dominic ###-####
Permanent Occupancy 8/27/19988/27/1998 DONE
Details
INSP - Final8/26/19988/26/19988/26/1998PNR
DetailsCarl Dependahl
will recall
INSP - Final8/25/1998 8/25/1998 NR
notified dominic, need to call for final
INSP - Final8/6/19988/6/19988/6/1998PNR
DetailsCarl Dependahl
conf w/ Brian M. of pub wks...signed card, need final walk-thru
INSP - Final8/5/19988/5/19988/5/1998ANR
DetailsCarl Dependahl
need verify pub wks ok for perm. occ.
INSP - Final5/6/19985/7/19985/7/1998AFAIL
DetailsWes Worcester
05/06/98 342 - need p/w and code enforcement w/bond released.. ###-#### around 9:00
INSP - Final5/6/19985/6/19985/6/1998PNR
DetailsCarl Dependahl
no insp, conf. w/ bldr re c/n...keep cc/n
INSP - Final5/5/19985/5/19985/5/1998PNR
DetailsCarl Dependahl
DOMINIC/###-#### - FINAL. INSP. INCLUDING CONCRETE LANDING. nr, not at site, unable to contact
INSP-Final Inspection5/5/19985/5/19985/5/1998PPASS
DetailsJoe Tawney
05/05/98 406 - DOMINIC/###-#### - RE-INSP ON FINAL FIRE INSP. OK FOR PERM OCC
INSP - Final4/30/19985/1/19985/1/1998APART
DetailsWes Worcester
05/01/98 342 - DOMINIC/###-#### - FINAL.
INSP-Final Inspection4/30/19985/1/19985/1/1998APART
DetailsJoe Tawney
05/01/98 406 - DOMINIC/###-#### - RE-INSPECTION. REINSP OK FOR TEMP OCC LANDING HAND RAIL
INSP-Final Inspection4/29/19984/30/19984/30/1998AFAIL
DetailsJoe Tawney
04/30/98 406 - dominic ###-#### FINAL FAIL DOOR HDWRE, EMERG LIGHTS, ADDRESS, PAINT CURBS, MED GAS REPOR
INSP-Final Inspection4/28/19984/28/19984/28/1998PPART
DetailsJoe Tawney
04/28/98 406 - bill simons ###-#### CONF ON MED GAS ROOM AND TESTS FOR SYSTEM
INSP - Framing/Rough-in3/27/19983/26/19983/26/1998PPART
DetailsCarl Dependahl
not insp, conf...need to insp completed draft stop prior to final
INSP - Framing/Rough-in3/23/19983/24/19983/24/1998APASS
DetailsWes Worcester
03/24/98 342 - CEILING GRID REINSPECTION DOMINIC ###-####
INSP - Framing/Rough-in3/19/19983/19/19983/19/1998ANR
DetailsCarl Dependahl
unable to chk draft stop, need to remove insul & membrane to observe
INSP - Framing/Rough-in3/16/19983/17/19983/17/1998APART
DetailsWes Worcester
03/17/98 342 - ceiling grid-dominic ###-####
INSP - Framing/Rough-in3/12/19983/12/19983/12/1998ANR
DetailsCarl Dependahl
draft stop
INSP - Framing/Rough-in2/9/19982/10/19982/10/1998APART
DetailsCarl Dependahl
dominic ###-#### fire wall reinspect...dom not onsite, w.i.p.
INSP - Carpentry2/6/19982/6/19982/6/1998PPART
DetailsCarl Dependahl
w/ dom...REC'D ENG'S LETTER RE SHEARWALLS (AND RECOMMENDATION TO LAG MAIN INT WALL TO CRIPPLE WALL...NOT DONE YET) REQ'S STAMP ARCH'S LETTER FOR ROOF CHANGE FROM TILE TO COMP...NEED TO COMPLETE DRAFT STOP, RECOMMEND CONTACT ARCH. FOR DESIGN HELP
INSP - Carpentry2/5/19982/5/19982/5/1998PPART
DetailsCarl Dependahl
Scheduled by Hello!. Contact phone is [3434445]. w/ dominic Cancelled by Hello! (Last update by [HLO]). Contact: [3434445]. rec'd arch's letter, private stair ok.... fireblocks part ok. ok to continue
INSP - Conference2/5/19982/5/19982/5/1998APASS
DetailsCarl Dependahl
w/ wes & supt. re c/n's
INSP - Energy code compliance2/5/19982/5/19982/5/1998ANR
DetailsCarl Dependahl
prearranged dominic ###-####...done by 408, not complete...ok to insulate per Tom
INSP - Wall cover2/5/19982/5/19982/5/1998 PASS
DetailsTom Arcoraci
/ / 408 -
INSP - Framing/Rough-in2/3/19982/4/19982/4/1998PFAIL
DetailsCarl Dependahl
peterson dental ###-####...c/n, complete fireblocks; arch to clarify stair use, public or private??...need eng to approve int shear wall install...
INSP - Conference2/3/19982/3/19982/3/1998APASS
DetailsCarl Dependahl
W/ DOMINIC OF TRADEWINDS RE INSP REQUEST...NEED ARCH. TO ADDRESS SHEAR WALL ISSUES AT INT. FTGS
INSP - Framing/Rough-in2/2/19982/3/19982/3/1998AFAIL
DetailsWes Worcester
02/03/98 342 - dominic ###-####
INSP - Carpentry2/2/19982/2/19982/2/1998ANR
DetailsCarl Dependahl
NEED ENG'S OK FOR SHEAR WALL INSTALL?...WILL TALK TO BLDR.
INSP - Conference2/2/19981/30/19981/30/1998PPASS
DetailsCarl Dependahl
W/ DOMINIC RE INT FTG/SHEAR WALLS
INSP-Sprinkler Rough-in/Hydro1/27/19981/28/19981/28/1998APASS
DetailsJoe Tawney
01/28/98 406 - PETERSON DENTAL---DOMINIC AT ###-#### ROUGH IN OF MEDICAL GAS ROOM OK SO FAR
INSP-Conference1/8/19981/8/19981/8/1998 PASS
DetailsJoe Tawney
/ / 406 - CONF ON MEDICAL GAS ROOM VENTILATION
INSP - Foundation11/6/199711/6/199711/6/1997PPART
DetailsCarl Dependahl
need to verify h-d's, chk underfloor shear walls when ready
INSP - Wall cover11/5/199711/6/199711/6/1997APASS
DetailsWes Worcester
11/06/97 342 -
INSP - Conference11/5/199711/5/199711/5/1997APASS
DetailsCarl Dependahl
W/ MIKE OTTO RE PLAN ENG'G.
INSP - Conference11/5/199711/5/199711/5/1997APASS
DetailsCarl Dependahl
CALLED TED MARTINEZ TO SUGGEST HE DBL CHK HOLD DOWN LOCATIONS AND GET INSP OF INT FTG/SHEARED PONY WALLS.
INSP - Footings11/5/199711/5/199711/5/1997PPART
DetailsCarl Dependahl
DENTAL CLINIC...EXT WALL FTGS. DISCUSSED HOLDOWN LOCATIONS W/ CONC.CONTRACTOR; CALLED TED MARTINEZ.
INSP - Footings11/4/199711/5/199711/5/1997ACANC
Details
11/05/97 333 - given to carl
INSP - Footings11/4/199711/4/199711/4/1997PPART
DetailsCarl Dependahl
HAS ENG'S SOILS REPORT ONSITE, IN LIEU OF 4" FILL...part, told contractor to check plan, has hold downs & shear walls at found, including cripple walls( h-d's in ftg, shear panels, nailing, etc.) below floor.
INSP - Footings10/31/199711/3/199711/3/1997ANR
DetailsWes Worcester
11/03/97 342 - no rebar, 4" of compacted base not in, approved plan, eng on site, on fill and organic matter
INSP - Conference10/17/199710/17/199710/17/1997PPASS
DetailsCarl Dependahl
START FUNDING ON THE LOAN-WILL START WORK SOON. UPDATED PERMIT