Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD96-01992
StatusFinaled
Name DURR MEDICAL
Site Address 300 N SAILFISH PL
Project Name 
Customer Number 
ePlanReviewNo
Description
DURR MEDICAL SUPPLY WAREHOUSE * TO CONSTRUCT A NEW 28,773 SQ.FT. TWO STORY CONCRETE TILT-UP TYPE II-NONRATED, FIRE SPRINKLERED FOR AREA INCREASE, OFFICE/WAREHOUSE BUILDING. THE SECOND FLOOR IS APPROXIMATELY 3,751 SQ.FT.,680 SQ.FT. OF THE AREA IS FINISHED OFFICE SPACE THE REMAINING AREA WILL BE FINISHED AT A FUTURE DATE. THE FIRST FLOOR IS APPROXIMATELY 25.022 SQ.FT, 20,520 IS WAREHOUSE AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI STANDARDS AND THE 1994 EDITION OF THE UBC, PERMIT TO INCLUDE RELATED SITE IMPROVEMENTS. MJP (PC#401-96) DR#23-96
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/11/19974/11/1997 DONE
Details
INSP - Final3/24/19973/24/19973/24/1997 PASS
DetailsJoe Tawney
/ / 406 - FINAL REINSP OK FOR PERM OCC
INSP - Final3/20/19973/20/19973/20/1997PNR
DetailsJoe Tawney
03/20/97 406 - 3 p.m. NOT READY FOR INSPECTION
INSP - Final3/21/19973/21/19973/19/1997PFAIL
Details
03/21/97 338 - OTH-OTHER AGENCIES NOT APPROVED fire & p/z required
INSP-Sprinkler Rough-in/Hydro3/17/19973/19/19973/19/1997PNR
DetailsJoe Tawney
03/19/97 406 - FINAL INSP NOT READY
INSP-Sprinkler Rough-in/Hydro3/17/19973/17/19973/17/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST
INSP - Conference3/13/19973/13/19973/13/1997PPASS
DetailsJoe Tawney
03/13/97 406 - DAN ###-#### PRE FINAL CONF DISCUSSED EXITS, SIGNS,HDWRE, EXTINGUISHERS. ALSO EMERG LIGHTS NOTED FDC TOO CLOSE TO WALL MTD CONTROL VLV
INSP - Conference3/12/19973/13/19973/12/1997PPASS
Details
03/13/97 338 - made ok
INSP-Supply line flush2/27/19972/28/19972/28/1997APART
DetailsJoe Tawney
02/28/97 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/ Rough-in2/19/19972/19/19972/19/1997 NR
Details
/ / 338 - str is ok but ele and plmg ae not signed off
INSP - Framing/Rough-in2/19/19972/19/19972/19/1997PNR
Details
02/19/97 338 - rescheduled til tomorrow a.m.
INSP - Framing/Rough-in1/24/19971/27/19971/26/1997APASS
Details
01/27/97 338 - ROOF FRAMING FOR THE SECOND FLOORING MADE OK STILL PUD DECK CONNECTIONS
INSP - Conference1/26/19971/26/19971/26/1997 NR
Details
/ / 338 - NOT READY CALLED TO POST PONE THE INSP
INSP - Flatwork1/2/19971/3/19971/1/1997APASS
Details
01/03/97 338 - PANEL ERRECTIONS making good progress with special inspec
INSP - Masonry12/16/199612/16/199612/16/1996PPASS
Details
12/16/96 333 - CONCRETE INSP...PANELS #24 - 25 - 2I6 & 4 STRUCTURAL COLUMNS....... special insp ok
INSP - Wall cover12/11/199612/12/199612/12/1996APASS
Details
12/12/96 338 - STRUC. CONCRETE/PANEL 27,28,31,32,33,34,35, special insp
INSP - Masonry11/25/199611/25/199611/25/1996PPASS
Details
11/25/96 338 - STRUCTURAL PANEL 13 THRU 23
INSP - Flatwork11/12/199611/13/199611/13/1996APASS
Details
11/13/96 338 - WALL PANELS 1 THRU 12
INSP - Footings10/22/199610/22/199610/22/1996PPASS
Details
10/22/96 338 - madeok r-bar placed in the first 3/4 of the footing area. special insp continuous during the pour
INSP - Footings10/18/199610/18/199610/21/1996ANR
Details
10/18/96 338 -
INSP - Conference10/14/199610/15/199610/15/1996APASS
Details
10/15/96 338 - APPROX 9AM? (BRIAN AT ###-####)