Permit Information
Permit NumberBLD96-02007
StatusFinaled
Name AIRPORT
Site Address 3201 AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(BOISE AIR TERMINAL - EAST ENTRY VESTIBULE) Fire sprinklers used for building area increase. To remodel the East end of the terminal building (baggage claim area) to create a new East entry vestibule and a 2nd floor exit stairway. Work is to include automatic swinging exit doors, a new steel and concrete exterior exit stairway, interior nonbearing walls, and suspended ceiling system all per approved drawings, engineering, and plan check conditions on file. Selective demolition is included in this permit. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. PC-404-96 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance  12/19/1996 PASS
ISSUED #12384 C OF C BY 301 THIS DATE.
INSP - Final12/18/199612/18/199612/18/1996 PASS
DetailsJim Storey
/ / 301 - FNL -OK FINAL
INSP - Final12/17/199612/18/199612/18/1996PPASS
Details
INSP - Fire Dept. Request12/6/199612/6/199612/6/1996 PASS
Details
/ / 405 - sprinkler relo rough in
INSP - Framing/Rough-in11/25/199611/26/199611/26/1996ANR
DetailsJim Storey
11/25/96 301 - OTH-OTHER AGENCIES NOT APPROVED ele n/r
INSP - Framing/Rough-in11/12/199611/12/199611/12/1996PPASS
DetailsJim Storey
11/12/96 301 - FRAM-OK FRAMING Fweld & STRUCTURAL WELDING ok 1/4 bo plates
INSP - Foundation10/21/199610/22/199610/22/1996APASS
DetailsJim Storey
10/21/96 301 - FND.REBAR. GATE 54..EARLY A.M. FDN -OK FOUNDATION
INSP - Footings10/18/199610/18/199610/18/1996PPEND
DetailsJim Storey
MAKE A U-TURN BY TOWER AND YOU WILL BE THERE PENDING S.I. REPORT
INSP - Conference10/11/199610/14/199610/14/1996APASS
DetailsJim Storey
10/12/96 301 - PRE-CONSTRUCTION INSPECTION GEN -GENERAL INSPECTION WORK ON EXAVATION IN PROGESS