BLD-Final | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | PASS |
Carl Dependahl
|
|
|
###-####, guardrails, exit doors ok; verify other signatures at office (P&Z...heating as NA) 1/7/2003 11:20:27 AM
|
BLD-Final | 1/6/2003 | 1/6/2003 | 1/6/2003 | A | NR |
Carl Dependahl
|
|
|
###-####...not on AM list, rec'd later in day, unable to complete. 1/7/2003 9:15:02 AM
|
BLD-Conference | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | PASS |
Carl Dependahl
|
|
|
###-####, Drew. ###-#### bill cole, plant mgr , plbg ok'd 12/23/2002 2:02:46 PM
|
BLD-Final | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | FAIL |
Carl Dependahl
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...c/n: rails, code enf signature, dead-bolts.... 12/23/2002 4:49:46 PM
|
BLD-Conference | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...verify plbg, bring plans. 12/20/2002 5:05:32 PM
|
BLD-Conference | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | CANC |
Carl Dependahl
|
|
|
|
FIRE-Final Inspection | 12/16/2002 | 12/17/2002 | 12/17/2002 | A | PASS |
Rick Jackson
|
|
|
DREW ###-#### OFFICE # ###-####
|
BLD-Conference | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | PART |
Carl Dependahl
|
|
|
w/Drew( Coldwell Banker)...need to consult w/ George re: final, expire or??? has fire coming out12/16/2002 3:43:56 PM 12/16/2002 3:45:36 PM
|
FIRE-Final Inspection | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 13:04:19. Contact: ###-####. need annual sprinkler system inspection; storage height above 12 ft 1/8/2002 9:52:01 AM
|
BLD-Final | 1/4/2002 | 1/7/2002 | 1/7/2002 | P | NR |
Tom Arcoraci
|
|
|
###-#### neds all sigs on card 1/7/2002 1:11:20 PM
|
FIRE-Final Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | CANC |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/7/2002 12:54:24 PM added by inspector in eror 1/7/2002 1:01:15 PM
|
BLD-Final | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 10:46:58. Contact: ###-####. recall. 1/4/2002 2:16:16 PM
|
BLD-Conference | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PART |
Tom Arcoraci
|
|
|
for conf-- craig-- ###-#### needs landing and hand rail at west rear door if two steps may not need to be accessiable
1/2/2002 2:35:55 PM
|
Extend Permit 180 days | | 7/30/2001 | 7/30/2001 | | DONE |
|
|
|
|
BLD-Conference | 5/8/2000 | 5/11/2000 | 5/11/2000 | P | PART |
|
|
|
###-#### Bill with ll on the req for occupncy need stair and mez rails completed new dors inthe rear exit signage etc, also must verify the wall construction of the bioler room wall. 5/11/00 4:59:42 PM
|
FIRE-Conference | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | PART |
Rick Jackson
|
|
|
Met with tenant and Perry to discuss items required to complete for final occupancy: additional exit; sprinklers; exit signs; handrails & guard rails.
|
INSP - Conference | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | FAIL |
Wes Worcester
|
|
|
met w/Toombs, George and Bob and will issue c/n
|
INSP - Miscellaneous | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | FAIL |
Wes Worcester
|
|
|
issued c/n to pick up permit/approved plan and begin corrections nlt 01/17/97.
|
INSP - Conference | 11/6/1996 | 11/7/1996 | 11/7/1996 | A | PART |
Wes Worcester
|
|
|
11/06/96 342 - 10 A.M.
|
INSP - Conference | 9/26/1996 | 9/26/1996 | 9/26/1996 | | FAIL |
|
|
|
/ / 405 - checked for compliance with agreement to continue to operate violation issued, rack system used w/o approval, aisles blocked, fe's blocked. cole says they understood they could use the racks once submit
|
INSP - Conference | 9/19/1996 | 9/19/1996 | 9/19/1996 | | FAIL |
|
|
|
/ / 405 - advised lowell that use of the racks was not approved until was approved. advised him that to continue to use the racks they could out a separate permit for the racks only. advised him to relocate a fir extinguisher which was
|
INSP - Conference | 9/11/1996 | 9/11/1996 | 9/11/1996 | | PART |
|
|
|
/ / 405 - recheck....cautioned cole on need to wrap up storage changes
|
INSP-Conference | 9/9/1996 | 9/9/1996 | 9/9/1996 | | PASS |
|
|
|
meeting new commitments, explained fd comments to B Cole reviewed HMIS requirements, reviewed Mixed comm calcs, not high hazard for finished product
|
INSP-Conference | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PART |
|
|
|
recheck w/slane...new schedule agreed on
|
INSP-Conference | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PART |
|
|
|
compliance visit, letter to slane on problems found
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | | FAIL |
|
|
|
/ / 405 - inspect for compliance with 8/29 letter under which temp occ dropped off c/n from wes, issued c/n...did not meet deadlines for fe's, exit signage, or storage system.
|
INSP - Conference | 8/21/1996 | 8/21/1996 | 8/21/1996 | A | FAIL |
|
|
|
08/22/96 405 - inspection for compliance of building - no current permit operation as warehouse, construction stopped by ww. SEVERE EXITING AND FIRE HAZARD PROBLEMS
|