Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-02294
StatusExpired
Name SYRINGA BANK BUILDING
Site Address 1299 N ORCHARD ST
Project NameSYRINGA BANK-SHELL
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A THREE STORY 37,188 SQ. FT., TYPE II-1HR, FIRE SPRINKLERED OFFICE/BANK SHELL WITH A 12,193 SQ. FT. BASEMENT. THE THREE FLOORS ABOVE GRADE WILL BE 12,396 SQ. FT. EACH. CONSTRUCTION WILL BE MASONRY EXTERIOR WALLS WITH STEEL INTERIOR FRAME. THE FIRST FLOOR WILL BE OPEN TO AN ATRIUM (SHAFT) WHICH WILL BE PROTECTED BY FIRE SPRINKLERES AND STC WALLS PER APPROVED PLANS AND APPROVAL BY T. HOGLAND. OTHER WORK INCLUDES GRADING, SITE IMPROVEMENTS, PAVING AND LANDSCAPING. NO OCCUPANCY WILL BE PERMITTED UNDER THIS PERMIT FOR THE SHELL ONLY. TENNANT IMPROVEMENT PLANS MUST BE SUBMITTED FOR EACH TENANT. ALL WORK IS PER APPROVED PLANS AND ATTACHMENTS, DR#47-96, CU#29-96, PC#472-96 AND '94 UBC.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final2/5/19992/9/19992/9/1999APASS
Details
02/09/99 338 - made okwith 406 blessing
INSP - Final2/3/19992/3/19992/3/1999 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION ON SHELL AND CORE
INSP-Sprinkler Rough-in/Hydro5/26/19985/26/19985/26/1998PCANC
DetailsJoe Tawney
05/26/98 406 - shelly ###-#### CANCEL WRONG PERMIT NMBR
INSP-Final Inspection4/1/19984/2/19984/2/1998PPART
DetailsJoe Tawney
04/02/98 406 - SHELLIE ###-#### OK ON ROUGH IN OF GLAZING SPKLRS CHECK HORIZONTAL DISTANCES TO GLASS
INSP - Framing/Rough-in3/31/19984/1/19984/1/1998PPART
Details
04/01/98 338 - made ok called mike
INSP-Sprinkler Rough-in/Hydro2/3/19982/4/19982/4/1998APASS
DetailsJoe Tawney
02/04/98 406 - conference shelly ###-#### CONF OK TO MOVE FDC TO NW CORNER OF NEW ADDITION WEST OF EXIST BANK BLD
INSP-Conference2/4/19982/3/19982/3/1998PPASS
DetailsJoe Tawney
/ / 406 - CONF 2/3/98 WITH GEN CONTR REGARDING SPKLR PROTECTION FOR ATRIUM GLAZW GLASS
INSP - Framing/Rough-in1/5/19981/6/19981/6/1998APASS
Details
01/06/98 338 - MADE OK
INSP-Final Inspection12/31/199712/31/199712/31/1997 PART
OK FOR TEMP ON 1ST FLR TO ACCOMODATE TI FOR SYRINGA BANK BLD97-1328
INSP-Sprinkler Rough-in/Hydro12/29/199712/30/199712/30/1997PFAIL
DetailsJoe Tawney
12/30/97 406 - at 2pm PARTIAL FINAL ON SHELL FAIL INSTALL HEADS IN BASEMENT CORRIDOR
INSP-Sprinkler Rough-in/Hydro12/19/199712/19/199712/19/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR SYSTEM HYDRO TEST
INSP-Final Inspection12/17/199712/18/199712/19/1997PNR
DetailsJoe Tawney
12/18/97 406 - READY AT 2:00 NOT READY FOR FINAL ON SHELL ì
INSP - Framing/Rough-in12/16/199712/17/199712/18/1997APASS
Details
12/17/97 338 - RESTROOMS ON 2ND AND 3RD FLOOR madee ok with elec insp ap
INSP - Conference10/20/199710/20/199710/20/1997PPASS
Details
with glazers on the spandrell panels
INSP - Framing/Rough-in10/10/199710/13/199710/14/1997APART
Details
also fire wall need to see the actual install of glazing at tew fire stop super is to set up an insp at that time
INSP-Conference10/7/199710/7/199710/7/1997 PASS
DetailsJoe Tawney
/ / 406 - CONF ON SPKLR COVERAGE FOR ATRIUM
INSP - Set-back9/11/19979/11/19979/11/1997 PART
Details
/ / 338 -
INSP - Framing/Rough-in9/9/19979/10/19979/10/1997PNR
Details
09/10/97 338 - out of time
INSP - Framing/Rough-in9/10/19979/10/19979/10/1997 PART
Details
/ / 338 -
INSP - Framing/Rough-in8/11/19978/12/19978/11/1997APASS
Details
08/12/97 338 - OK TO COVER BEHIND OTHER TRADES
INSP-Sprinkler Rough-in/Hydro7/18/19977/18/19977/18/1997 PART
DetailsJoe Tawney
/ / 406 - ROUGH IN BASEMENT, FLOORS 1 & 2 OK TO COVER
INSP - Framing/Rough-in7/16/19977/17/19977/17/1997PPASS
Details
07/17/97 338 - made ok in areas to this point to follow behind ele insp.
INSP - Masonry6/24/19976/24/19976/24/1997PPASS
Details
06/24/97 338 - made ok with the sp insp approval
INSP - Masonry6/16/19976/16/19976/16/1997PPASS
Details
06/16/97 338 - made ok with sp insp ok
INSP - Masonry6/13/19976/13/19976/12/1997PPASS
Details
06/13/97 338 - made ok with sp insp approval
INSP - Masonry6/11/19976/12/19976/12/1997APASS
Details
06/12/97 338 - made ok with the sp insp blessing
INSP - Masonry6/9/19976/10/19976/10/1997APASS
Details
06/10/97 338 - made ok with sp insp blessing
INSP - Masonry6/5/19976/6/19976/6/1997APASS
Details
06/06/97 338 - made ok with sp insp approval
INSP - Masonry5/30/19976/2/19976/2/1997APASS
Details
06/02/97 338 - ok with sp insp blessing
INSP - Masonry5/23/19975/23/19975/23/1997PPASS
Details
05/23/97 338 - ok with sp insp ok
INSP - Masonry5/21/19975/22/19975/22/1997APASS
Details
05/22/97 338 - made ok with sp insp aok
INSP - Masonry5/20/19975/20/19975/19/1997PPASS
Details
05/20/97 333 - GROUT GRID GRID GROUT??????? HA HA PERRRRRR FROM MONNN
INSP - Masonry5/19/19975/19/19975/19/1997PPASS
Details
05/20/97 333 - GROUT MASN-REBAR OK
INSP - Masonry5/16/19975/16/19975/16/1997PPASS
Details
05/16/97 338 - made ok with the sp insp approval
INSP - Masonry5/15/19975/15/19975/15/1997PPASS
Details
05/15/97 338 - made ok with sp insp blessing
INSP - Masonry5/14/19975/14/19975/13/1997PPASS
Details
05/14/97 338 - made ok with ethe special insp blessing
INSP - Masonry5/8/19975/9/19975/9/1997APASS
DetailsJim Storey
05/09/97 301 - covered special insp.
INSP - Masonry5/6/19975/7/19975/6/1997APART
Details
05/07/97 333 - MASN-REBAR OK west wall @+-30ft
INSP - Masonry5/5/19975/6/19975/6/1997APASS
Details
05/06/97 338 - ok with sp insp
INSP - Masonry5/5/19975/5/19975/5/1997PPASS
Details
05/05/97 338 - GROUTMADE OK WITH THE SP INS OK
INSP - Masonry5/1/19975/2/19975/2/1997APART
DetailsCarl Dependahl
05/02/97 340 - GROUT... PENDING SPEC INSP REPORT
INSP - Foundation1/14/19971/14/19971/14/1997PPASS
Details
01/14/97 338 - WEATHER PRO IN PLACE SPECIAL INSP IN PLACE
INSP - Foundation1/10/19971/13/19971/13/1997APASS
Details
01/13/97 338 - FND. REBAR. MADE OK WEATHER PRO OK
INSP - Foundation1/2/19971/3/19971/1/1997APASS
Details
01/03/97 338 - r-bar placed weather pro in place
INSP - Foundation12/27/199612/27/199612/27/1996PPART
DetailsJim Sly
12/27/96 316 - Inspection of found...W 1/2f N wall and N 1/2f W wall ... inspection approval.
INSP - Foundation12/24/199612/26/199612/26/1996ANH
DetailsJim Sly
12/26/96 316 - rebar Inspection at 10:45 AM NOBODY WAS THERE
INSP - Foundation12/13/199612/16/199612/16/1996APASS
Details
12/16/96 338 - FND.REBAR r-bar placed weather pro in place spec insp mad
INSP - Footings12/6/199612/6/199612/6/1996PPASS
Details
12/06/96 338 - made ok spec insp made ok
INSP - Footings12/5/199612/5/199612/5/1996PNR
Details
12/05/96 338 - not ready will recall
INSP - Footings11/27/199611/27/199611/27/1996PPART
Details
11/27/96 338 - PARTIAL MADE OK EAST WALL TO S CORNER SOUTH WALL COMPLETE
INSP - Footings11/26/199611/26/199611/26/1996PPASS
Details
11/26/96 338 - r-bar placed special insp made ok
INSP - Footings11/25/199611/25/199611/25/1996PPASS
Details
11/25/96 338 -
INSP - Conference11/21/199611/22/199611/25/1996APASS
Details
11/25/96 338 - made ok met with super will set time for the pre job conf