INSP - Final | 2/5/1999 | 2/9/1999 | 2/9/1999 | A | PASS |
|
|
|
02/09/99 338 - made okwith 406 blessing
|
INSP - Final | 2/3/1999 | 2/3/1999 | 2/3/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION ON SHELL AND CORE
|
INSP-Sprinkler Rough-in/Hydro | 5/26/1998 | 5/26/1998 | 5/26/1998 | P | CANC |
Joe Tawney
|
|
|
05/26/98 406 - shelly ###-#### CANCEL WRONG PERMIT NMBR
|
INSP-Final Inspection | 4/1/1998 | 4/2/1998 | 4/2/1998 | P | PART |
Joe Tawney
|
|
|
04/02/98 406 - SHELLIE ###-#### OK ON ROUGH IN OF GLAZING SPKLRS CHECK HORIZONTAL DISTANCES TO GLASS
|
INSP - Framing/Rough-in | 3/31/1998 | 4/1/1998 | 4/1/1998 | P | PART |
|
|
|
04/01/98 338 - made ok called mike
|
INSP-Sprinkler Rough-in/Hydro | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | PASS |
Joe Tawney
|
|
|
02/04/98 406 - conference shelly ###-#### CONF OK TO MOVE FDC TO NW CORNER OF NEW ADDITION WEST OF EXIST BANK BLD
|
INSP-Conference | 2/4/1998 | 2/3/1998 | 2/3/1998 | P | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF 2/3/98 WITH GEN CONTR REGARDING SPKLR PROTECTION FOR ATRIUM GLAZW GLASS
|
INSP - Framing/Rough-in | 1/5/1998 | 1/6/1998 | 1/6/1998 | A | PASS |
|
|
|
01/06/98 338 - MADE OK
|
INSP-Final Inspection | 12/31/1997 | 12/31/1997 | 12/31/1997 | | PART |
|
|
|
OK FOR TEMP ON 1ST FLR TO ACCOMODATE TI FOR SYRINGA BANK BLD97-1328
|
INSP-Sprinkler Rough-in/Hydro | 12/29/1997 | 12/30/1997 | 12/30/1997 | P | FAIL |
Joe Tawney
|
|
|
12/30/97 406 - at 2pm PARTIAL FINAL ON SHELL FAIL INSTALL HEADS IN BASEMENT CORRIDOR
|
INSP-Sprinkler Rough-in/Hydro | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR SYSTEM HYDRO TEST
|
INSP-Final Inspection | 12/17/1997 | 12/18/1997 | 12/19/1997 | P | NR |
Joe Tawney
|
|
|
12/18/97 406 - READY AT 2:00 NOT READY FOR FINAL ON SHELL ì
|
INSP - Framing/Rough-in | 12/16/1997 | 12/17/1997 | 12/18/1997 | A | PASS |
|
|
|
12/17/97 338 - RESTROOMS ON 2ND AND 3RD FLOOR madee ok with elec insp ap
|
INSP - Conference | 10/20/1997 | 10/20/1997 | 10/20/1997 | P | PASS |
|
|
|
with glazers on the spandrell panels
|
INSP - Framing/Rough-in | 10/10/1997 | 10/13/1997 | 10/14/1997 | A | PART |
|
|
|
also fire wall need to see the actual install of glazing at tew fire stop super is to set up an insp at that time
|
INSP-Conference | 10/7/1997 | 10/7/1997 | 10/7/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF ON SPKLR COVERAGE FOR ATRIUM
|
INSP - Set-back | 9/11/1997 | 9/11/1997 | 9/11/1997 | | PART |
|
|
|
/ / 338 -
|
INSP - Framing/Rough-in | 9/9/1997 | 9/10/1997 | 9/10/1997 | P | NR |
|
|
|
09/10/97 338 - out of time
|
INSP - Framing/Rough-in | 9/10/1997 | 9/10/1997 | 9/10/1997 | | PART |
|
|
|
/ / 338 -
|
INSP - Framing/Rough-in | 8/11/1997 | 8/12/1997 | 8/11/1997 | A | PASS |
|
|
|
08/12/97 338 - OK TO COVER BEHIND OTHER TRADES
|
INSP-Sprinkler Rough-in/Hydro | 7/18/1997 | 7/18/1997 | 7/18/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN BASEMENT, FLOORS 1 & 2 OK TO COVER
|
INSP - Framing/Rough-in | 7/16/1997 | 7/17/1997 | 7/17/1997 | P | PASS |
|
|
|
07/17/97 338 - made ok in areas to this point to follow behind ele insp.
|
INSP - Masonry | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
|
|
|
06/24/97 338 - made ok with the sp insp approval
|
INSP - Masonry | 6/16/1997 | 6/16/1997 | 6/16/1997 | P | PASS |
|
|
|
06/16/97 338 - made ok with sp insp ok
|
INSP - Masonry | 6/13/1997 | 6/13/1997 | 6/12/1997 | P | PASS |
|
|
|
06/13/97 338 - made ok with sp insp approval
|
INSP - Masonry | 6/11/1997 | 6/12/1997 | 6/12/1997 | A | PASS |
|
|
|
06/12/97 338 - made ok with the sp insp blessing
|
INSP - Masonry | 6/9/1997 | 6/10/1997 | 6/10/1997 | A | PASS |
|
|
|
06/10/97 338 - made ok with sp insp blessing
|
INSP - Masonry | 6/5/1997 | 6/6/1997 | 6/6/1997 | A | PASS |
|
|
|
06/06/97 338 - made ok with sp insp approval
|
INSP - Masonry | 5/30/1997 | 6/2/1997 | 6/2/1997 | A | PASS |
|
|
|
06/02/97 338 - ok with sp insp blessing
|
INSP - Masonry | 5/23/1997 | 5/23/1997 | 5/23/1997 | P | PASS |
|
|
|
05/23/97 338 - ok with sp insp ok
|
INSP - Masonry | 5/21/1997 | 5/22/1997 | 5/22/1997 | A | PASS |
|
|
|
05/22/97 338 - made ok with sp insp aok
|
INSP - Masonry | 5/20/1997 | 5/20/1997 | 5/19/1997 | P | PASS |
|
|
|
05/20/97 333 - GROUT GRID GRID GROUT??????? HA HA PERRRRRR FROM MONNN
|
INSP - Masonry | 5/19/1997 | 5/19/1997 | 5/19/1997 | P | PASS |
|
|
|
05/20/97 333 - GROUT MASN-REBAR OK
|
INSP - Masonry | 5/16/1997 | 5/16/1997 | 5/16/1997 | P | PASS |
|
|
|
05/16/97 338 - made ok with the sp insp approval
|
INSP - Masonry | 5/15/1997 | 5/15/1997 | 5/15/1997 | P | PASS |
|
|
|
05/15/97 338 - made ok with sp insp blessing
|
INSP - Masonry | 5/14/1997 | 5/14/1997 | 5/13/1997 | P | PASS |
|
|
|
05/14/97 338 - made ok with ethe special insp blessing
|
INSP - Masonry | 5/8/1997 | 5/9/1997 | 5/9/1997 | A | PASS |
Jim Storey
|
|
|
05/09/97 301 - covered special insp.
|
INSP - Masonry | 5/6/1997 | 5/7/1997 | 5/6/1997 | A | PART |
|
|
|
05/07/97 333 - MASN-REBAR OK west wall @+-30ft
|
INSP - Masonry | 5/5/1997 | 5/6/1997 | 5/6/1997 | A | PASS |
|
|
|
05/06/97 338 - ok with sp insp
|
INSP - Masonry | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | PASS |
|
|
|
05/05/97 338 - GROUTMADE OK WITH THE SP INS OK
|
INSP - Masonry | 5/1/1997 | 5/2/1997 | 5/2/1997 | A | PART |
Carl Dependahl
|
|
|
05/02/97 340 - GROUT... PENDING SPEC INSP REPORT
|
INSP - Foundation | 1/14/1997 | 1/14/1997 | 1/14/1997 | P | PASS |
|
|
|
01/14/97 338 - WEATHER PRO IN PLACE SPECIAL INSP IN PLACE
|
INSP - Foundation | 1/10/1997 | 1/13/1997 | 1/13/1997 | A | PASS |
|
|
|
01/13/97 338 - FND. REBAR. MADE OK WEATHER PRO OK
|
INSP - Foundation | 1/2/1997 | 1/3/1997 | 1/1/1997 | A | PASS |
|
|
|
01/03/97 338 - r-bar placed weather pro in place
|
INSP - Foundation | 12/27/1996 | 12/27/1996 | 12/27/1996 | P | PART |
Jim Sly
|
|
|
12/27/96 316 - Inspection of found...W 1/2f N wall and N 1/2f W wall ... inspection approval.
|
INSP - Foundation | 12/24/1996 | 12/26/1996 | 12/26/1996 | A | NH |
Jim Sly
|
|
|
12/26/96 316 - rebar Inspection at 10:45 AM NOBODY WAS THERE
|
INSP - Foundation | 12/13/1996 | 12/16/1996 | 12/16/1996 | A | PASS |
|
|
|
12/16/96 338 - FND.REBAR r-bar placed weather pro in place spec insp mad
|
INSP - Footings | 12/6/1996 | 12/6/1996 | 12/6/1996 | P | PASS |
|
|
|
12/06/96 338 - made ok spec insp made ok
|
INSP - Footings | 12/5/1996 | 12/5/1996 | 12/5/1996 | P | NR |
|
|
|
12/05/96 338 - not ready will recall
|
INSP - Footings | 11/27/1996 | 11/27/1996 | 11/27/1996 | P | PART |
|
|
|
11/27/96 338 - PARTIAL MADE OK EAST WALL TO S CORNER SOUTH WALL COMPLETE
|
INSP - Footings | 11/26/1996 | 11/26/1996 | 11/26/1996 | P | PASS |
|
|
|
11/26/96 338 - r-bar placed special insp made ok
|
INSP - Footings | 11/25/1996 | 11/25/1996 | 11/25/1996 | P | PASS |
|
|
|
11/25/96 338 -
|
INSP - Conference | 11/21/1996 | 11/22/1996 | 11/25/1996 | A | PASS |
|
|
|
11/25/96 338 - made ok met with super will set time for the pre job conf
|