INSP - Final | 2/19/1997 | 2/19/1997 | 2/19/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final
|
INSP - Letter of compliance | 2/19/1997 | 2/19/1997 | 2/19/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #12041
|
INSP - Letter of compliance | 2/19/1997 | 2/19/1997 | 2/19/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #12041
|
INSP - Final | 2/18/1997 | 2/18/1997 | 2/18/1997 | P | FAIL |
Alan Hauser
|
|
|
02/18/97 350 - still need electrical final, everything else ok
|
INSP - Energy code compliance | 12/5/1996 | 12/5/1996 | 12/5/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - insulation ok, ok to cover
|
INSP - Framing/Rough-in | 12/4/1996 | 12/5/1996 | 12/5/1996 | A | PASS |
Alan Hauser
|
|
|
12/05/96 350 - FRAME REINSPECT frame ok
|
INSP - Framing/Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PART |
Alan Hauser
|
|
|
12/02/96 350 - CORRECTIONS ON FRAME, OK TO INSULATE, WILL CHECK FRAME CO
|
INSP - Framing/Rough-in | 11/25/1996 | 11/26/1996 | 11/26/1996 | A | FAIL |
Alan Hauser
|
|
|
11/26/96 350 - NO ADDRESS POSTED, NO MECH. OR PBLG. APPROVED
|
INSP - Footings | 10/8/1996 | 10/9/1996 | 10/9/1996 | P | PASS |
Alan Hauser
|
|
|
10/09/96 350 - CHECK ENGINEERED FOOTING... TALKED WITH CONCRETE MAN HE HAS PICTURES OF THE STEEL IN PADS FOR COLUMN PADS ARE POURED BUT WHERE STILL EXPOSED
|
INSP - Conference | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - PICKED UP APPROVED PLANS, WENT BY JOB SITE TO LOOK AT TWO RE GARAGE AREA. MEET BRIAN, HE SAID THEY ARE THERE, I CAN'T SEE THEM ASKED EXPOSE THEM FOR INSPECTION. HE SAID HAD MEETING AND WOULD DO IT LATER. A HIM TO CALL ME FOR
|
INSP - Footings | 9/26/1996 | 9/27/1996 | 9/27/1996 | A | PASS |
Alan Hauser
|
|
|
09/27/96 350 - LATE A.M. WENT BY AND TALKED TO CONCRETE PEOPLE ABOUT PAD STEEL BEAM IN GARAGE FOOTINGS OK, TWO BARS OF #4 IN FTNS
|