INSP - Final | 11/20/1997 | 11/21/1997 | 11/21/1997 | A | FAIL |
|
|
|
signatures needed
|
INSP - Conference | 8/25/1997 | 8/25/1997 | 8/25/1997 | | PASS |
|
|
|
/ / 333 - talked to Gus about finals
|
INSP - Conference | 8/21/1997 | 8/21/1997 | 8/21/1997 | A | PASS |
|
|
|
08/21/97 333 - 11am remind them of unpaid fee met with Gus
|
INSP - Conference | 8/19/1997 | 8/20/1997 | 8/20/1997 | A | CANC |
|
|
|
change to tomorrow
|
INSP - Conference | 8/1/1997 | 8/4/1997 | 8/4/1997 | P | PASS |
|
|
|
08/04/97 333 - AT 1 P.M. AS PER YOU talked about 1 hr walls
|
INSP - Framing/Rough-in | 7/11/1997 | 7/11/1997 | 7/11/1997 | P | PART |
|
|
|
07/11/97 333 - partial rough-in
|
INSP - Framing/Rough-in | 6/30/1997 | 6/30/1997 | 6/30/1997 | P | NR |
|
|
|
06/30/97 333 - not completly framed
|
INSP - Foundation | 12/30/1996 | 12/30/1996 | 12/30/1996 | P | PASS |
Wes Worcester
|
|
|
special insp on site
|
INSP - Foundation | 12/30/1996 | 12/30/1996 | 12/30/1996 | P | NR |
Wes Worcester
|
|
|
|
INSP - Footings | 12/24/1996 | 12/24/1996 | 12/24/1996 | P | NR |
|
|
|
12/24/96 333 - gate locked
|
INSP - Footings | 12/18/1996 | 12/18/1996 | 12/18/1996 | P | PART |
Wes Worcester
|
|
|
that that was in place was ok....ck back later
|