Permit Information
Permit NumberBLD96-02661
StatusFinaled
Name 8TH STREET MARKETPLACE
Site Address 405 S 8TH ST
Project Name8TH ST MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(PHASE I) To upgrade the existing atrium to bring into compliance with 1994 UBC including a passive smoke control system per approved plans on file. Work includes installation of 20 minute door assemblies, 3/4 hr. rated glazing in basement window openings, 1-hr. rated wall infills in the basement, infill of openings exceeding the 25% area allowance with smoke barrier walls per Sec. 905.2.3 and a new stairway. (NOTE: Within 2 years of the date this permit is issued remodel is to take place so that all tenants on all floors to have 1 exit out other than through the atrium - see ltr. from M. Kennedy 7/18/96.) ACCEPTANCE AND ISSUANCE OF A CERTIFICATE OF OCCUPANCY IS NOT TO BE GRANTED UNTIL THE PASSIVE SMOKE CONTROL SYSTEM REPORT HAS BEEN FILED AND APPROVED BY THE BUILDING DEPARTMENT. Fire sprinklers substitute for 1-hr. construction. (P.C.#143-94/MYS)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/25/19982/25/19982/25/1998PPASS
DetailsRick Jackson
atrium sprinklers gaurds/deflectors installled. full occ. approved
INSP-Final Inspection6/25/19976/25/19976/25/1997PPASS
Details
CHECK SPRINKLER BAFFLES design good, ok to proceed with installing. will verify with corridor improvement
INSP - Partial final6/6/19976/9/19976/9/1997ANH
Details
06/09/97 333 - PARTIAL TEMP.OCC. no one there
INSP-Final Inspection6/5/19976/6/19976/6/1997APART
Details
redesigning baffles on window sprinklers
INSP-Final Inspection6/3/19976/3/19976/3/1997PPART
Details
alarm test passed, waiting on sprinkler info
INSP-Final Inspection6/2/19976/2/19976/2/1997PFAIL
Details
alarms not tested, sprinklers used to sub for rated glass blocked by blinds, no info available on listing for sprinklers to be used in manner installed.
INSP - Conference4/8/19974/8/19974/7/1997PPASS
Details
04/08/97 333 - he will call you on cel and set up time for conf. talked about handrails
INSP-Sprinkler Rough-in/Hydro2/18/19972/18/19972/18/1997PPART
Details
atrium alarm system, dorr hold open smokes, and riser location reviewed
INSP - Carpentry2/14/19972/14/19972/14/1997PPASS
Details
02/14/97 333 - shear wall nailing SHRW-OK SHEARWALL NAILING
INSP - Conference2/11/19972/11/19972/11/1997 PASS
Details
/ / 333 - resubmittal ok
INSP - Conference1/9/19971/10/19971/10/1997APASS
Details
01/10/97 333 - 9:30 A.M