Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD96-02798
StatusFinaled
Name INDEPENDENT SCHOOL DISTRICT OF
Site Address 4150 E GRAND FOREST DR
Project NameSCHOOL
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 2 STORY 134,941 SQ. FT. FULLY FIRE SPRINKLERED JUNIOR HIGH SCHOOL AND ASSOCIATED SITE DEVELOPMENT AS PER APPROVED PLANS, SPECS, ATTACHEMNTS AND CU#-95-95. PLANS FOR THIS PROJECT WERE REVIEWED AND APPROVED FOR UBC AND UMC REQUIREMENTS BY KEN HARTELL STATE OF IDAHO BUILDING DIVISION.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 9/30/19989/30/1998 DONE
Details
INSP - Final9/18/19989/18/19989/18/1998 PASS
DetailsRuss Owen
/ / 407 - final inspection.
INSP - Final9/18/19989/18/19989/18/1998PPASS
DetailsRuss Owen
stairs corrected and all other agencies sighned off also letter from progect engineer ok all special inspection items.
INSP - Final9/10/19989/11/19989/11/1998PPART
DetailsRuss Owen
09/11/98 407 - only has 1 correction at the center stairs.
INSP-Final Inspection9/9/19989/9/19989/9/1998APASS
DetailsRick Jackson
occ approved
INSP-Final Inspection9/3/19989/4/19989/4/1998PNR
DetailsWes Worcester
09/04/98 342 - greg ###-#### fire dept still not signed off
INSP-Final Inspection8/27/19988/28/19988/28/1998PFAIL
DetailsRick Jackson
greg ###-#### overhead roll-up door won't stay up. told contractor the door must remain down until working with alarms
INSP-Final Inspection8/20/19988/21/19988/20/1998P
DetailsRick Jackson
greg 208 521 8520
INSP - Framing/Rough-in7/20/19987/22/19987/22/1998PPART
DetailsRuss Owen
07/22/98 407 - partial inspection of some reconstructed stairs and fire
INSP - Framing/Rough-in6/29/19986/30/19986/30/1998APASS
DetailsRuss Owen
06/30/98 407 - stairs,looked at the new rubber.
INSP - Final6/8/19986/8/19986/8/1998PPART
DetailsRuss Owen
Gave a temp Occupancy.The stairs do not yet have the rubber tread coverings,as all of the stairs have had to be redone,to meet code required rise and run. Main reason they have requested a temp is to avoid penalty fees.They are to get the finish materials for the stairs asap. Also note the stairs will be subject to a re-inspection. we have had them rework stairs due to previous inspection correction. Trying to work with them.
INSP - Final6/3/19986/5/19986/8/1998ANR
DetailsRuss Owen
06/05/98 407 - They are not ready with the corrections at the stairs.
INSP - Final6/3/19986/4/19986/4/1998APART
DetailsRuss Owen
still need to correct stairs.
INSP-Final Inspection6/3/19986/4/19986/4/1998PPART
DetailsRick Jackson
###-#### Randy Stimpson temp occ approved
INSP - Final6/3/19986/3/19986/3/1998PPART
DetailsRuss Owen
06/03/98 407 - inspections of lower floor araeas.
INSP - Final6/2/19986/2/19986/2/1998APART
DetailsRuss Owen
found electrical conduit sleves thru walls appear to have been fire stoped incorrectly,i notified Ormand and the Electrical contractor.
INSP - Final6/1/19986/1/19986/2/1998PPART
DetailsRuss Owen
06/01/98 407 - inspect upper areas have corrections fire penetrations.
INSP - Framing/Rough-in5/22/19985/28/19985/28/1998APART
DetailsRuss Owen
05/28/98 407 - went out with george to conference job supper on stairs i
INSP - Framing/Rough-in5/22/19985/27/19985/27/1998PPART
DetailsRuss Owen
05/27/98 407 - meet with job supper about stairs correction.
INSP - Framing/Rough-in5/22/19985/26/19985/26/1998APART
DetailsRuss Owen
05/26/98 407 - meet with george and bob stairs need to meet minimum rise
INSP-Final Inspection5/22/19985/26/19985/26/1998PFAIL
DetailsRick Jackson
###-#### correction notice issued (too long to list)
INSP-Alarm Testing5/18/19985/20/19985/20/1998AFAIL
DetailsRick Jackson
alarms/sprinkler not monitored. c/n issued for other isssues.
INSP - Wall cover4/3/19984/3/19984/3/1998PPART
DetailsRuss Owen
Talked with Ormand about tempered glass required at the top of stairs.
INSP-Sprinkler Rough-in/Hydro4/2/19984/2/19984/2/1998APART
DetailsRick Jackson
rough-in complete of classrooms. office areas in south side need additional hangers. gen contractor will notify shilo.
INSP - Wall cover3/18/19983/27/19983/28/1998ACANC
DetailsRuss Owen
03/27/98 407 - cancell
INSP - Wall cover3/18/19983/26/19983/27/1998APART
DetailsRuss Owen
03/26/98 407 - went over areas with Ormand job sup Randy,boiler room pen
INSP - Wall cover3/18/19983/25/19983/26/1998ACANC
DetailsRuss Owen
03/25/98 407 - unable to make it today due to wensday am staff meeting.
INSP - Wall cover3/18/19983/24/19983/25/1998APART
DetailsRuss Owen
03/24/98 407 - went out talked with Ormand about electrical and pluming
INSP - Wall cover3/18/19983/23/19983/24/1998APART
DetailsRuss Owen
03/23/98 407 - Talked with Randy of Ormand about fire stoping penetratio contacted trades with problems and they will correct.
INSP - Wall cover3/20/19983/20/19983/20/1998PPART
DetailsRuss Owen
inspection in the gym area noted correction items with R.ndy with Ormand.
INSP - Wall cover3/18/19983/19/19983/20/1998APART
DetailsRuss Owen
03/19/98 407 -
INSP - Wall cover3/17/19983/17/19983/17/1998PPART
DetailsRuss Owen
inspection above grid ceilings in class rooms.note ceiling grid install before inspection,Job supper has noted,as well as i on fire stoping re-insp required. Areas D and G.
INSP - Framing/Rough-in3/13/19983/13/19983/13/1998PPART
DetailsRuss Owen
inspection of upper section g. ceiling grid has been installed.
INSP - Framing/Rough-in3/12/19983/12/19983/12/1998PPART
DetailsRuss Owen
inspections of area E ,they have installed grid ceiling with out approval,I am having to remove grids to inspect, I have correction in this area.
INSP - Wall cover3/9/19983/9/19983/9/1998PPART
DetailsRuss Owen
went out to check unit E above cieling will go back,they have set droped ceiling in .
INSP-Sprinkler Rough-in/Hydro2/12/19982/12/19982/12/1998APART
DetailsRick Jackson
checked areas E,G and H. all okay, still need heads in some areas not getting tiles yet. areas between bathrooms not sprinklered, will recheck later if they are needed.
INSP-Sprinkler Rough-in/Hydro2/5/19982/5/19982/5/1998APASS
DetailsRick Jackson
underground flush okay
INSP - Framing/Rough-in1/20/19981/20/19981/20/1998 PASS
DetailsRuss Owen
ceiling in kitchen 1st layyer rock.
INSP - Wall cover1/7/19981/7/19981/7/1998 PART
first layer upper floor corrridor,need to repair minor small holes.
INSP - Wall cover1/6/19981/6/19981/6/1998 PART
kitchen cieling,told them to complete duct chases with fire stoping system.
INSP - Framing/Rough-in12/23/199712/22/199712/22/1997 PART
inspect sience room ,need a fire damper added notified contractor.
INSP - Carpentry12/17/199712/16/199712/16/1997PPART
DetailsCarl Dependahl
w/ russ & Greg, proj mgr.
INSP - Framing/Rough-in12/17/199712/16/199712/16/1997 PART
DetailsRuss Owen
interior steel studs,have correction notice same as gary lane school,as i and carl inspected on 12/15/97.same project manager for both jobs.
INSP - Framing/Rough-in11/6/199711/7/199711/7/1997APART
DetailsRuss Owen
LEFT CORRECTION.
INSP - Framing/Rough-in10/13/199710/14/199710/14/1997APART
DetailsRuss Owen
10/14/97 407 - Scheduled by Hello! on 10/13/97 at 13:35:20. walk thru only first framing inspection.
INSP - Masonry6/23/19976/24/19976/24/1997APASS
DetailsRuss Owen
06/24/97 407 - special inspector.
INSP - Masonry6/18/19976/19/19976/19/1997APASS
DetailsRuss Owen
06/19/97 407 - SPECIAL INSP.
INSP - Masonry6/18/19976/18/19976/18/1997PNR
DetailsRuss Owen
06/18/97 407 - grout need special inspection. has not been inspected by special inspector thi section E.
INSP-Conference5/8/19975/8/19975/8/1997PPASS
Details
relocation of fdc and piv to side of building approved provided hydraulic line loss is not significantly increased. advised will need hydro of both lines
INSP - Footings5/5/19975/6/19975/6/1997AFAIL
DetailsJim Storey
/ / 301 - STEEL CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in1/6/19971/7/19971/7/1997PNH
DetailsJim Sly
01/07/97 316 - FRAME REINSPECT Could not find any construction on Grand Could have had more info on location or tele # of contractor.