Permit Information
Permit NumberBLD96-02927
StatusExpired
Name LB INDUSTRIES
Site Address 8783 HACKAMORE DR
Project NameLB INDUSTRIES
Customer Number 
ePlanReviewNo
Description
TO BUILD A NEW 16,260 SQUARE FOOT, ONE STORY, OFFICE/WAREHOUSE SHELL BUILDING. CONSTRUCTED OF CONCRETE SLAB FLOOR, MASONRY EXTERIOR WALLS, STEEL INTERIOR COLUMNS, AND TJI ROOF SYSTEM WITH PLYWOOD ROOF DECK AND FOAM INSULATION ROOF SYSTEM. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMNTS. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING. DR-111-96/CU-55-96/PC#646-96/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final8/29/19978/29/19978/29/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR CERT OF COMPL ON SHELL
INSP - Final8/29/19978/29/19978/29/1997 PASS
Details
/ / 338 - FNL -OK FINAL LCI-LETTER OF COMPLIANCE ISSUED
INSP - Letter of compliance8/29/19978/29/19978/29/1997 PASS
Details
/ / 338 - LCI-LETTER OF COMPLIANCE ISSUED
INSP - Final6/26/19976/26/19976/26/1997PPART
Details
06/26/97 338 - FINAL FOR C/O. LATE PM. SIGNED THE TEMP COL ON THE OCC R CORRECTION WILL COPY FIRE INSP OK FOR A TEMP C/C
INSP-Final Inspection6/26/19976/26/19976/26/1997PPART
DetailsJoe Tawney
06/26/97 406 - FINAL FOR C/O. EARLY PM. OK FOR TEMP CERT OF COMPL NO TENANTS UNTIL SPKLR MONITORING INST AND DUCT DETECTORS INST AND TESTED
INSP-Final Inspection6/18/19976/19/19976/19/1997AFAIL
DetailsJoe Tawney
06/19/97 406 - FINAL ON SPRINKLERS RON ###-#### - TONE - DIAL IN YOUR NU FINAL ON SHELL FAIL BOLLARDS AT GAS METERS BLDG ADDRESS SPKLR SYSTEM OFF EAST WALL ON GRID LINE 4 NOT 1 HR CONSTR PER PLAN CURB STRIPING
INSP-Sprinkler Rough-in/Hydro6/18/19976/18/19976/18/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST
INSP-Sprinkler Rough-in/Hydro6/18/19976/18/19976/18/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST
INSP-Sprinkler Rough-in/Hydro6/12/19976/12/19976/12/1997PFAIL
DetailsJoe Tawney
06/12/97 406 - BRIAN CAULKINS -###-#### HYDRO TEST FAIL FDC PIPING NOT INCLUDED
INSP - Final6/10/19976/11/19976/11/1997PNR
Details
06/11/97 338 - OTH-OTHER AGENCIES NOT APPROVED not ready
INSP - Framing/Rough-in5/9/19975/12/19975/11/1997APASS
Details
05/12/97 338 - okto close in the soffits
INSP - Carpentry5/8/19975/8/19975/8/1997PPASS
DetailsJim Sly
05/08/97 316 - Inspection of canopy for cover.... West End
INSP - Framing/Rough-in5/6/19975/7/19975/6/1997PNR
Details
05/07/97 333 - not ready mansard not done cant find electr sticker
INSP - Framing/Rough-in5/1/19975/1/19975/1/1997PPART
DetailsCarl Dependahl
05/01/97 340 - ROOF NAILING SW SIDE OK; DRAFT STOP OK AT CANOPY. REQUEST FRAME OK
INSP - Conference4/30/19974/30/19974/30/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ SUPT. RE DRAFT STOPS AT CANOPY, OK TO BEGIN COVER
INSP - Conference4/30/19974/30/19974/30/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ SUPT. RE DRAFT STOPS AT CANOPY, OK TO BEGIN COVER
INSP - Framing/Rough-in4/25/19974/29/19974/29/1997AFAIL
DetailsCarl Dependahl
04/29/97 340 - C/N, NEED CLARIFICATION OF DRAFT STOPS, NAIL OFF CLIPS, H
INSP - Framing/Rough-in4/24/19974/25/19974/25/1997APART
Details
04/25/97 338 - roof deck only front portion
INSP - Framing/Rough-in4/18/19974/21/19974/21/1997PPART
Details
04/22/97 338 - PERRY, I'M NOT SURE WHAT THIS INSP.WAS FOR..... partial
INSP - Masonry4/10/19974/11/19974/10/1997PPASS
Details
04/11/97 338 - made ok with sp insp approval r-bar placed
INSP - Masonry4/9/19974/10/19974/9/1997APASS
Details
04/10/97 338 - made ok with sp insp blessing
INSP - Wall cover4/9/19974/9/19974/8/1997PPASS
Details
04/09/97 338 - rebar in block made ok this shuld be a masonry insp for t
INSP - Masonry4/8/19974/8/19974/8/1997 PASS
Details
/ / 338 - madeok with the spec. insp blessing r-bar placed
INSP - Masonry4/7/19974/7/19974/6/1997PPASS
Details
04/07/97 338 - made ok with sp insp approval
INSP - Masonry4/2/19974/3/19974/3/1997APART
DetailsCarl Dependahl
04/03/97 340 - BLK. REBAR...338 AREA, PENDING SPEC INSP REPORTS FROM STR
INSP - Foundation3/31/19974/1/19973/31/1997APASS
Details
03/31/97 338 - FND.REBAR made ok with sp insp ok
INSP - Masonry3/28/19973/31/19973/30/1997APASS
Details
03/31/97 338 - C M U made ok with sp insp ok
INSP - Foundation3/26/19973/27/19973/26/1997APASS
Details
03/27/97 338 - made ok with sp insp ok
INSP - Foundation3/24/19973/25/19973/24/1997APASS
Details
03/25/97 338 - FND. REBAR CMU ok with sp insp approval will pour at the come back out ì
INSP-Conference3/20/19973/20/19973/20/1997 PASS
PRE CONSTR CONF
INSP - Footings3/14/19973/14/19973/13/1997PPASS
Details
03/14/97 338 - MADE OK rebar FDN -OK FOUNDATION ì
INSP - Foundation3/11/19973/12/19973/11/1997APASS
Details
03/12/97 338 - FND.REBAR..POURING AT 1 P.M. made ok
INSP - Footings3/6/19973/7/19973/5/1997APASS
Details
03/07/97 338 - r-bar placed ok with sp insp approval
INSP - Foundation3/5/19973/6/19973/5/1997PNR
Details
03/06/97 338 - RETAINING WALLpostpone till 03-07-97 # 1
INSP - Foundation3/5/19973/5/19973/5/1997 PASS
Details
/ / 338 - made ok r-bar placed in the east 3/4 ok to pour withthe spec
INSP - Footings2/28/19973/3/19973/3/1997PNR
Details
03/03/97 338 - postpone till 03-04-97
INSP - Footings3/3/19973/3/19973/3/1997 PASS
Details
/ / 338 - spec insp made ok for the east 3/4 of building
INSP-Supply line flush2/26/19972/28/19972/28/1997PPART
DetailsJoe Tawney
02/28/97 406 - READY AT 3:00 OK FOR UNDERGROUND HYDRO TEST