Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-03003
StatusFinaled
Name ASSOCIATED FOODS STORES
Site Address 4719 S MARKET ST
Project Name 
Customer Number 
ePlanReviewNo
Description
ASSOCIATED FOODS STORES INC. * PROJECT WILL CONSIST OF CONSTRUCTING A 30,000 SF FULLY FIRE SPRINKLERED WAREHOUSE ADDITION TO A TYPE V-N UNLIMITED AREA BUILDING. THE ADDITION WILL INCLUDE : FREEZER, DOCK WITH OFFICE, HANDICAPPED RESTROOM, MACHINE ROOM AND ADDITIONAL TRUCK ACCESS & PARKING AREA. ALL WORK IS PER APPROVED PLANS AND ATTACHMENTS, DR#119-96, PC#665-96. FIRE SPRINKLERS USED FOR UNLIMITED AREA. THIS BUILDING MUST MAINTAIN 60 FOOT OPEN YARDS ON ALL SIDES. HIGH RACK STORAGE IS NOT INCLUDED UNDER THIS PERMIT.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/9/19979/10/19979/10/1997PPASS
DetailsJim Storey
09/10/97 301 - FNL -OK FINAL
Permanent Occupancy 9/10/19979/10/1997 DONE
Details
INSP-Final Inspection8/5/19978/6/19978/6/1997PFAIL
Details
need signs on ammonia piping in freezer. need class 1division 2 emergency and exit lights for machinery room.
INSP - Final7/15/19977/15/19977/15/1997APART
DetailsJim Storey
07/15/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED tenp occ ok
INSP-Final Inspection7/15/19977/14/19977/14/1997PPART
Details
c/n issued on alarms, recieved timetable for completion, all by 8/1
INSP-Final Inspection7/8/19977/9/19977/9/1997PFAIL
Details
no alarms connected, no purge ventilation, no sprinklers active
INSP-Sprinkler Rough-in/Hydro6/19/19976/20/19976/20/1997APART
Details
10 A.M. "TRIP TEST" MIKE - ###-#### 53 SECONDS TO FULL FLOW
INSP-Supply line flush6/9/19976/12/19976/12/1997APASS
Details
"FLUSH"
INSP-Sprinkler Rough-in/Hydro6/9/19976/11/19976/11/1997PPART
Details
MIKE ###-#### hydro ok above and underground systems
INSP-Conference6/3/19976/3/19976/3/1997PFAIL
Details
dropped off rejection of FPC resubmittal on ammonia tank alternative design.
INSP-Sprinkler Rough-in/Hydro5/27/19975/28/19975/28/1997AFAIL
Details
deliver preaction plans w/ comments, piping hung, test port connected to branch not sprig, wrong heads used for col prot.
INSP-Conference5/21/19975/21/19975/21/1997AFAIL
Details
rvw alarm plans at grinnel, dbl interlock only combined dry/preaction sys not in compliance w/ nfpa 13, will send letter to sanchez at fpc
INSP-Conference5/6/19975/6/19975/6/1997PPASS
Details
reviewed resubmit on ammonia tank, approved w/conditions, faxed to job trailer letter
INSP-Conference4/1/19974/1/19974/1/1997APASS
Details
meet w/ Sanchez on vapor alarms and submittal requirements, reply to his letter of 3/28.
INSP-Conference2/26/19972/26/19972/26/1997PPASS
Details
met w/ sanchez on fire hydrants for site before combustables are brought in, reviewed their resubmittal dated 2/24