INSP - Final | 9/9/1997 | 9/10/1997 | 9/10/1997 | P | PASS |
Jim Storey
|
|
|
09/10/97 301 - FNL -OK FINAL
|
Permanent Occupancy | | 9/10/1997 | 9/10/1997 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/5/1997 | 8/6/1997 | 8/6/1997 | P | FAIL |
|
|
|
need signs on ammonia piping in freezer. need class 1division 2 emergency and exit lights for machinery room.
|
INSP - Final | 7/15/1997 | 7/15/1997 | 7/15/1997 | A | PART |
Jim Storey
|
|
|
07/15/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED tenp occ ok
|
INSP-Final Inspection | 7/15/1997 | 7/14/1997 | 7/14/1997 | P | PART |
|
|
|
c/n issued on alarms, recieved timetable for completion, all by 8/1
|
INSP-Final Inspection | 7/8/1997 | 7/9/1997 | 7/9/1997 | P | FAIL |
|
|
|
no alarms connected, no purge ventilation, no sprinklers active
|
INSP-Sprinkler Rough-in/Hydro | 6/19/1997 | 6/20/1997 | 6/20/1997 | A | PART |
|
|
|
10 A.M. "TRIP TEST" MIKE - ###-#### 53 SECONDS TO FULL FLOW
|
INSP-Supply line flush | 6/9/1997 | 6/12/1997 | 6/12/1997 | A | PASS |
|
|
|
"FLUSH"
|
INSP-Sprinkler Rough-in/Hydro | 6/9/1997 | 6/11/1997 | 6/11/1997 | P | PART |
|
|
|
MIKE ###-#### hydro ok above and underground systems
|
INSP-Conference | 6/3/1997 | 6/3/1997 | 6/3/1997 | P | FAIL |
|
|
|
dropped off rejection of FPC resubmittal on ammonia tank alternative design.
|
INSP-Sprinkler Rough-in/Hydro | 5/27/1997 | 5/28/1997 | 5/28/1997 | A | FAIL |
|
|
|
deliver preaction plans w/ comments, piping hung, test port connected to branch not sprig, wrong heads used for col prot.
|
INSP-Conference | 5/21/1997 | 5/21/1997 | 5/21/1997 | A | FAIL |
|
|
|
rvw alarm plans at grinnel, dbl interlock only combined dry/preaction sys not in compliance w/ nfpa 13, will send letter to sanchez at fpc
|
INSP-Conference | 5/6/1997 | 5/6/1997 | 5/6/1997 | P | PASS |
|
|
|
reviewed resubmit on ammonia tank, approved w/conditions, faxed to job trailer letter
|
INSP-Conference | 4/1/1997 | 4/1/1997 | 4/1/1997 | A | PASS |
|
|
|
meet w/ Sanchez on vapor alarms and submittal requirements, reply to his letter of 3/28.
|
INSP-Conference | 2/26/1997 | 2/26/1997 | 2/26/1997 | P | PASS |
|
|
|
met w/ sanchez on fire hydrants for site before combustables are brought in, reviewed their resubmittal dated 2/24
|