Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-03109
StatusFinaled
Name POWER ENGINEERS
Site Address 9450 W OVERLAND RD
Project NameBLACKEAGLE #7
Customer Number 
ePlanReviewNo
Description
BLACKEAGLE DEVELOPMENT-BLDG. #7 * TO CONSTRUCT A NEW 34,750 SQ. FT. SHELL AND CORE OFFICE BUILDING. THE WORK CONSISTS OF THE SITE IMPROVEMENTS INCLUDING ASPHALT PARKING FOR 160 STALLS, LANDSCAPING, AND THE EXTERIOR SHELL AND ROOF FOR THE BUILDING. THE BUILDING IS A TILT-UP CONCRETE CONSTRUCTION SYSTEM WITH ALUMINUM STOREFRONT WINDOWS AND DOORS. THE ROOF DECK IS FRAMED WITH WOOD GLU-LAM BEAMS, BAR-JOISTS, PLYWOOD SHEATHING AND SINGLE-PLY ROOFING MEMBRANE. ALL INTERIOR TENANT IMPROVEMENTS TO BE COMPLETED UNDER SEPARATE PERMIT. DR#-55-96 PC#695-96
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final5/11/19985/12/19985/12/1998APASS
Details
05/12/98 338 - issued l/c and signed the occreq card on site
INSP - Final2/26/19982/26/19982/26/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP ON SHELL OK FOR CERT OF COMPLETION
INSP - Final9/17/19979/17/19979/17/1997 FAIL
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL FAIL KNOX BOX CURG STRIPING AT ENTRANCES F
INSP - Temporary occupancy8/20/19978/21/19978/21/1997APASS
Details
08/20/97 338 - bld #7 TCO -TEMP C OF O ISSUED ok to issue temp col signec
INSP - Final8/15/19978/18/19978/18/1997AFAIL
Details
08/18/97 338 - c/n issued OTH-OTHER AGENCIES NOT APPROVED
INSP-Final Inspection8/18/19978/18/19978/18/1997 PART
DetailsJoe Tawney
08/18/97 406 - REINSP FOR FINAL OK FOR TEMP FIRE HYD TOO LOW STRIPE & L
INSP-Final Inspection8/18/19978/18/19978/18/1997 PART
DetailsJoe Tawney
08/18/97 406 - REINSP FOR FINAL OK FOR TEMP FIRE HYD TOO LOW STRIPE & L
INSP-Final Inspection8/15/19978/15/19978/15/1997 NR
DetailsJoe Tawney
08/15/97 406 - reinspection NOT READY Inspection cancelled by Hello!
INSP-Final Inspection8/13/19978/14/19978/15/1997AFAIL
DetailsJoe Tawney
08/14/97 406 - Final for shell and building FINAL FAIL ADDRESS SPKLR RM HYD HEIGHT STRIPE CURBS FD TURN AROUNDS
INSP-Sprinkler Rough-in/Hydro8/8/19978/8/19978/8/1997 PASS
DetailsJoe Tawney
/ / 406 - OK ON SPKLR SYSTEM HYDRO TEST
INSP - Framing/Rough-in7/31/19978/1/19978/1/1997APASS
Details
08/01/97 338 - made ok minor verbal corrections slack wires at the perim
INSP-Supply line flush6/24/19976/24/19976/24/1997 PART
UNDERGROUND FLUSH OK
INSP - Roof4/29/19974/29/19974/30/1997PPART
DetailsCarl Dependahl
04/29/97 340 - SOME PLY SHEETS REPLACED, NAILING APPEARS OK; ASKED FOR E SUBSTITUTION LSTI FOR MST 160 & OVERALL OK. NEED VMBS WELDED AT COLS
INSP - Footings2/4/19972/4/19972/4/1997PPASS
Details
02/04/97 338 - BLDG 7 this insp is for a slab