INSP - Final | 12/29/1997 | 12/29/1997 | 12/29/1997 | | PASS |
|
|
|
Final
|
Permanent Occupancy | | 12/29/1997 | 12/29/1997 | | DONE |
|
|
|
|
INSP - Final | 12/10/1997 | 12/11/1997 | 12/12/1997 | P | NR |
|
|
|
12/12/97 338 - CARD has not been signed by ele or plmg there is a fee du per monica.
|
INSP - Final | 11/6/1997 | 11/7/1997 | 11/7/1997 | A | PASS |
Tom Arcoraci
|
|
|
TREASURE VALLEY SIGNED TEMP OCC
|
INSP-Final Inspection | 11/5/1997 | 11/5/1997 | 11/5/1997 | P | PASS |
Joe Tawney
|
|
|
11/05/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP-Final Inspection | 10/31/1997 | 11/3/1997 | 11/3/1997 | A | FAIL |
Joe Tawney
|
|
|
11/03/97 406 - TREASURE VALLEY FINAL FAIL EMERG LIGHTS BLDG ADDRESS SPARE SPKLR HEADS
|
INSP-Sprinkler Rough-in/Hydro | 10/30/1997 | 10/31/1997 | 10/31/1997 | A | FAIL |
Joe Tawney
|
|
|
10/31/97 406 - TREASURE VALLEY HYDRO TEST ON FDC PIPING FAIL
|
INSP-Supply line flush | 10/23/1997 | 10/23/1997 | 10/23/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 10/17/1997 | 10/17/1997 | 10/17/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST EXCEPT FOR FDC PIPING
|
INSP - Wall cover | 10/13/1997 | 10/15/1997 | 10/15/1997 | P | PASS |
|
|
|
CEILING GRID made ok with verbal corrections
|
INSP - Framing/Rough-in | 9/9/1997 | 9/9/1997 | 9/9/1997 | P | PASS |
|
|
|
09/09/97 338 - made ok to cover other agencies made ok next visit will b seizmic
|
INSP - Framing/Rough-in | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | NR |
|
|
|
09/04/97 338 - Scheduled by Hello! on 09/03/97 at 09:03:28.DID SAME INSP
|
INSP-Sprinkler Rough-in/Hydro | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | FAIL |
Joe Tawney
|
|
|
09/03/97 406 - SPKLR ROUGH IN NO APPROVED PLANS ON SITE ALSO CONF ON OTH
|
INSP - Framing/Rough-in | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | NR |
|
|
|
09/03/97 338 - OTH-OTHER AGENCIES NOT APPROVED NOT READY
|
INSP - Masonry | 8/1/1997 | 8/4/1997 | 8/4/1997 | A | PASS |
Russ Owen
|
|
|
08/04/97 407 - last lift at the four corners.
|
INSP - Masonry | 7/30/1997 | 7/30/1997 | 7/30/1997 | P | PASS |
|
|
|
07/30/97 338 - made ok r-bar placed
|
INSP - Masonry | 7/30/1997 | 7/30/1997 | 7/30/1997 | | PASS |
|
|
|
/ / 338 - MASN-REBAR OK
|
INSP - Masonry | 7/28/1997 | 7/29/1997 | 7/28/1997 | A | PASS |
|
|
|
07/29/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | PASS |
|
|
|
07/01/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/26/1997 | 6/27/1997 | 6/27/1997 | P | PASS |
|
|
|
06/27/97 338 - made ok with sp insp approvalSTEM WALLS
|
INSP - Footings | 6/26/1997 | 6/26/1997 | 6/26/1997 | P | PASS |
|
|
|
06/26/97 338 - made ok with special insp approval
|
INSP - Footings | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
|
|
|
06/24/97 338 - FOOTING REINSPECT north wall/sw and se corners r-bar plac pass of the sp insp ufer ground is in place in the footing
|
INSP - Footings | 6/23/1997 | 6/24/1997 | 6/24/1997 | A | NR |
|
|
|
06/24/97 338 - not ready need sp insp letter/and work to be ready when c
|