INSP-Sprinkler Rough-in/Hydro | 10/1/1997 | 10/1/1997 | 10/1/1997 | P | PASS |
Rick Jackson
|
|
|
MOTEL 6--FIRE LIFE SAFETY Follow up inspection of open c/n items.
|
INSP - Final | 9/30/1997 | 9/30/1997 | 10/1/1997 | P | PART |
Jim Storey
|
|
|
09/30/97 301 - perm. occ ok upon plm. and fire sign offs
|
INSP - Final | 5/20/1997 | 5/21/1997 | 5/21/1997 | A | NR |
Jim Storey
|
|
|
05/21/97 301 -
|
INSP-Final Inspection | 5/21/1997 | 5/21/1997 | 5/21/1997 | P | FAIL |
|
|
|
alarms not tested, handicap rooms alarm entire building, fe cabinets locked, understair storage not prot by 1 hr, no plans on site, KNOX BOX??
|
INSP - Foundation | 5/20/1997 | 5/20/1997 | 5/20/1997 | P | PASS |
Jim Storey
|
|
|
05/20/97 301 - REBAR IN FOUNDATION OF POOL HOUSE FRMS-OK FORMS-REBAR
|
INSP - Footings | 5/15/1997 | 5/16/1997 | 5/16/1997 | P | PASS |
Jim Storey
|
|
|
05/16/97 301 - MOTEL 6/ POOL ROOM/ EARLY PM PLEASE/ DON BUCKMASTER/ 322- CFRM-OK CEILING FRAMINGO CALL YOU TO SCHEDULE TIME
|
INSP - Ceiling grid | 4/21/1997 | 4/22/1997 | 4/22/1997 | A | PASS |
Jim Storey
|
|
|
04/22/97 301 - SCLG-OK SUSPENDED CEILING
|
INSP - Ceiling grid | 4/21/1997 | 4/21/1997 | 4/21/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED n/r for complet insp and menb protection must be in place before tile cover.
|
INSP - Ceiling grid | 4/21/1997 | 4/21/1997 | 4/21/1997 | P | FAIL |
Jim Storey
|
|
|
T-BAR GRID and membrane protection not complet.
|
INSP - Framing/Rough-in | 3/31/1997 | 4/1/1997 | 4/1/1997 | A | PART |
Jim Storey
|
|
|
04/01/97 301 - FRAM-OK FRAMING ADA ROOMS 3 OUT OF 4
|
INSP - Carpentry | 3/18/1997 | 3/18/1997 | 3/18/1997 | P | PASS |
Jim Storey
|
|
|
03/18/97 301 - fire caulking GWB -OK SHEETROCK NAILING fire stopping at bath 1 st floor c wing ok
|
INSP - Carpentry | 3/13/1997 | 3/14/1997 | 3/14/1997 | A | PART |
Jim Storey
|
|
|
03/14/97 301 - FIRE CAULK WIP -WORK IN PROGRESS ok valve assembly 2nd floor.
|
INSP - Carpentry | 3/10/1997 | 3/11/1997 | 3/11/1997 | A | PASS |
Jim Storey
|
|
|
03/11/97 301 - putty pads in place on upper units a wing ok
|
INSP - Final | 3/10/1997 | 3/10/1997 | 3/10/1997 | P | PART |
|
|
|
section 1 temp, ok,back of card signed
|
INSP-Conference | 3/10/1997 | 3/10/1997 | 3/10/1997 | P | PART |
|
|
|
return alarm plans, not complete, grinnel to provide batt and volt drop calcs, removing h/c detectors from building alarm
|
INSP - Carpentry | 2/12/1997 | 2/13/1997 | 2/13/1997 | A | PASS |
Jim Storey
|
|
|
02/12/97 301 - FIRE STOP (AFTR 9 A.M.) FRBL-OK FIREBLOCKING
|
INSP - Carpentry | 2/7/1997 | 2/10/1997 | 2/10/1997 | P | PASS |
Jim Storey
|
|
|
02/10/97 301 - FIRE CAULKING, ETC. GWB -OK SHEETROCK NAILING
|
INSP - Carpentry | 2/7/1997 | 2/7/1997 | 2/7/1997 | | PASS |
Jim Storey
|
|
|
02/07/97 301 - FIRE STOPS FRWL-RATED WALL CONST. OK
|
INSP - Final | 2/5/1997 | 2/5/1997 | 2/5/1997 | A | FAIL |
|
|
|
issue c/n after researching plans and talking with dick pierce. wing "C" only inspected. lots of problems...rated doors not installed to corridor, deadbolts on exit doors, alarms, exit signs, fire extinguishers locked up, storage under stairs.
|
INSP - Temporary occupancy | 2/5/1997 | 2/5/1997 | 2/5/1997 | P | NR |
Jim Storey
|
|
|
02/05/97 301 - n/r
|
INSP - Final | 2/4/1997 | 2/4/1997 | 2/4/1997 | P | FAIL |
|
|
|
exit hardware wrong, alarms not upgraded in c wing as required, want to do in phases but not noted on plans, no emergency power for exit lights..no plan review comments, will look up in vault
|
INSP - Carpentry | 1/6/1997 | 1/6/1997 | 1/6/1997 | P | PART |
Jim Storey
|
|
|
01/06/97 301 - fire stopping on first 6/lower and 4 upper ok at shower v
|
INSP - Carpentry | 1/3/1997 | 1/6/1997 | 1/6/1997 | A | PART |
Jim Storey
|
|
|
01/06/97 301 - fire stopping first group of rooms 3 n top/bottom west en assembly
|
INSP-Conference | 1/3/1997 | 1/3/1997 | 1/3/1997 | | PASS |
|
|
|
/ / 405 - reviewed alarm system requirements w/ contractor. need hall H/S. rooms need single sta smokes, ada romms need h/s.
|
INSP - Framing/Rough-in | 12/30/1996 | 12/30/1996 | 12/28/1996 | P | NR |
|
|
|
12/30/96 338 -
|