Permanent Occupancy | | 11/30/1998 | 11/30/1998 | | DONE |
|
|
|
|
INSP - Final | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - achrived final letter from engineer of reccord and special i
|
INSP - Final | 9/10/1998 | 9/10/1998 | 9/10/1998 | P | PASS |
Jim Storey
|
|
|
09/10/98 301 - keith ###-#### FNL -OK FINAL
|
INSP-Final Inspection | 9/10/1998 | 9/10/1998 | 9/10/1998 | P | PASS |
Rick Jackson
|
|
|
KEITH ###-#### occ approved
|
INSP-Final Inspection | 9/8/1998 | 9/9/1998 | 9/9/1998 | P | FAIL |
Rick Jackson
|
|
|
KEITH ###-#### FN PER RICK AT 3:00 no access for dampers - retest after doors installed
|
INSP - Final | 8/28/1998 | 8/28/1998 | 8/28/1998 | | PART |
Jim Storey
|
|
|
08/28/98 301 - TEMP OCC /KEITH ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK FOR TEMP OCC. ON GYM AND 2 FLOOR CLASS ROMMS ONLY. A2.1 IS NOT TO BE OCCUPIED AND HAS SEPERATE OCC
|
INSP-Final Inspection | 8/20/1998 | 8/20/1998 | 8/20/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for gym/classroom only. strobes in classrooms 301 and 307 need repair
|
INSP - Final | 8/18/1998 | 8/18/1998 | 8/18/1998 | P | FAIL |
Jim Storey
|
|
|
08/18/98 301 - Scheduled by Hello!. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 8/5/1998 | 8/6/1998 | 8/6/1998 | P | PASS |
Jim Storey
|
|
|
08/06/98 301 - stage curtin release test 21 sec meets code and listing f verified 165* assembley approved.
|
INSP-Final Inspection | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | PART |
Rick Jackson
|
|
|
tested stage curtain - 21 second drop time. installed per manufacturers instructions.
|
INSP-Sprinkler Rough-in/Hydro | 7/22/1998 | 7/23/1998 | 7/23/1998 | P | PASS |
Rick Jackson
|
|
|
doug ###-#### hydro and rough-in for auditorium - NE riser hydro okay. gaurds still needed in pit area (auditorium).
|
INSP - Framing/Rough-in | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | PASS |
Jim Storey
|
|
|
07/16/98 301 - Scheduled by Hello!. FRAM-OK FRAMING ceilling at adatormum north east corner ok for cover at exterior vestabual. ì
|
INSP - Framing/Rough-in | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | FAIL |
Jim Storey
|
|
|
07/09/98 301 - Scheduled by Hello!. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED stair internint hand rail req
|
INSP - Framing/Rough-in | 7/2/1998 | 7/2/1998 | 7/3/1998 | P | PART |
|
|
|
07/02/98 333 - bathrooms ok
|
INSP - Framing/Rough-in | 6/29/1998 | 6/30/1998 | 6/30/1998 | A | PART |
|
|
|
framing ok insp. done 6/29/98 301 c/n posted for insp. at ceilling.
|
INSP - Framing/Rough-in | 6/24/1998 | 6/25/1998 | 6/26/1998 | P | PART |
Jim Storey
|
|
|
06/24/98 301 - Scheduled by Hello!. FRAM-OK FRAMING
|
INSP-Alarm Testing | 6/16/1998 | 6/16/1998 | 6/16/1998 | P | FAIL |
Rick Jackson
|
|
|
wrong strobes (15/75 instead of 75) in numerous areas. c/n issued with list of items needed for temp occ.
|
INSP-Final Inspection | 6/12/1998 | 6/15/1998 | 6/15/1998 | P | NR |
Rick Jackson
|
|
|
FINAL READY AT 1 DOUG/ ###-#### N.PAGER NR for alarm test. conducted rough-in of auditorium and associated rooms - not complete. alarm test scheduled for 6/16 by electrical contractor
|
INSP - Framing/Rough-in | 6/8/1998 | 6/9/1998 | 6/9/1998 | A | PART |
Jim Storey
|
|
|
06/09/98 301 - entry to adatorum fire rated const. and opening ok
|
INSP - Framing/Rough-in | 5/15/1998 | 5/18/1998 | 5/18/1998 | A | PASS |
Jim Storey
|
|
|
05/18/98 301 - recieved resubmital for detail e1/bs7.3 to reduce welding
|
INSP - Framing/Rough-in | 5/13/1998 | 5/14/1998 | 5/14/1998 | A | FAIL |
Jim Storey
|
|
|
05/14/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED welds at curti
|
INSP - Framing/Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PASS |
Jim Storey
|
|
|
05/05/98 301 - FRAM-OK FRAMING strucral wall east side of audatotim
|
INSP - Framing/Rough-in | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | PASS |
Jim Storey
|
|
|
05/05/98 301 - FRAM-OK FRAMING struc. east of adatoraum
|
INSP - Framing/Rough-in | 4/28/1998 | 4/28/1998 | 4/28/1998 | A | PART |
Jim Storey
|
|
|
04/28/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok for celling
|
INSP - Framing/Rough-in | 4/27/1998 | 4/27/1998 | 4/28/1998 | P | PASS |
Jim Storey
|
|
|
04/27/98 301 - SCLG-OK SUSPENDED CEILING
|
INSP-Sprinkler Rough-in/Hydro | 4/22/1998 | 4/22/1998 | 4/22/1998 | A | PASS |
Rick Jackson
|
|
|
rough-in for gym and class areas. okay to cover with tiles. told contractor to leave access for dampers.
|
INSP-Final Inspection | 4/21/1998 | 4/21/1998 | 4/21/1998 | P | CANC |
Joe Tawney
|
|
|
04/21/98 406 - doug ###-#### pager put in your number CANCELLED TO BE DONE BY 405
|
INSP-Sprinkler Rough-in/Hydro | 4/21/1998 | 4/21/1998 | 4/21/1998 | | PART |
|
|
|
witnessed at 205 after 2 hrs...pump was left connected during test. told Doug NOT to do this again. Not testing from control valve to system connection.
|
INSP - Framing/Rough-in | 4/13/1998 | 4/13/1998 | 4/14/1998 | P | FAIL |
Jim Storey
|
|
|
04/13/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETEDOTHER INSP. REQ
|
INSP - Framing/Rough-in | 3/25/1998 | 3/26/1998 | 3/26/1998 | A | PART |
Jim Storey
|
|
|
03/26/98 301 - STEEL STUDED FOR AUDITORIUM RADIUS-WES ###-#### VOICE PAGER 10:00 appointment with arch. discuss fire door isue framing ok at west s
|
INSP - Framing/Rough-in | 3/18/1998 | 3/19/1998 | 3/20/1998 | A | PART |
Jim Storey
|
|
|
03/20/98 301 - ceiling inspection wes ###-#### pager south entry ok for cover and west stair at landing
|
INSP-Sprinkler Rough-in/Hydro | 3/19/1998 | 3/19/1998 | 3/19/1998 | P | PART |
Rick Jackson
|
|
|
DOUG PAGER ###-####--LES BOIS--HE WILL CALL YOU rough-in only. okay to cover 1st floor corridor and stairwell.
|
INSP - Framing/Rough-in | 2/23/1998 | 2/24/1998 | 2/24/1998 | P | FAIL |
Jim Storey
|
|
|
02/24/98 301 - wes cell ###-#### grid ceiling insp
|
INSP - Framing/Rough-in | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | NR |
Bob Archibald
|
|
|
###-#### HARD CEILING
|
INSP - Framing/Rough-in | 2/11/1998 | 2/12/1998 | 2/12/1998 | A | PART |
Jim Storey
|
|
|
02/11/98 301 - WES PAGER ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to proceed can verify at n insp.
|
INSP - Framing/Rough-in | 2/4/1998 | 2/5/1998 | 2/5/1998 | A | PASS |
Jim Storey
|
|
|
02/05/98 301 - CEILING IN DOWNSTAIR HARD LID AREAS--WES AT ###-#### PAGE FRAM-OK FRAMING /pending mti fireproofing approval.
|
INSP-Sprinkler Rough-in/Hydro | 2/4/1998 | 2/5/1998 | 2/5/1998 | A | PASS |
Rick Jackson
|
|
|
02/05/98 409 - READY AT 11:00--DOUG AT ###-#### PAGER approved sprinkler plans on site. completed hydro and rough-in.
|
INSP - Conference | 2/2/1998 | 2/2/1998 | 2/2/1998 | | PART |
Jim Storey
|
|
|
/ / 301 - fire stopping for 2hr area wall submital not complet work is requier investagation of proper assembly upon submital of product listin contractor and bldg. dept..// fire stopping for one hour roof/ceilling assembly not done at this t
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/22/1998 | P | PART |
Jim Storey
|
|
|
01/21/98 301 - ###-#### WES\LES BOIS HIGH SCHOOL trans to tom he called and said that gyp nailling ok
|
INSP - Framing/Rough-in | 1/14/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Jim Storey
|
|
|
01/14/98 301 - LES BOIS JUNIOR HIGH--KEITH ###-#### 2nd floor class rooms and coridor ok for cover up to stairs. drinking fo and door assem. not instaled or insp for membrane penatrations of corido
|
INSP - Framing/Rough-in | 1/8/1998 | 1/13/1998 | 1/13/1998 | A | PART |
Jim Storey
|
|
|
01/13/98 301 - rein WIP -WORK IN PROGRESS ok to gyp corrodor one side before reinsp.
|
INSP - Wall cover | 1/7/1998 | 1/8/1998 | 1/9/1998 | A | PART |
Russ Owen
|
|
|
01/08/98 407 - Went with 301 to job and left corrections.
|
INSP - Framing/Rough-in | 1/8/1998 | 1/8/1998 | 1/8/1998 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to one side only.
|
INSP - Framing/Rough-in | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PART |
Jim Storey
|
|
|
12/19/97 301 - 2 nd floor gym rated ceilling and shafts ok all but 2 wer flue.
|
INSP - Framing/Rough-in | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PART |
Jim Storey
|
|
|
12/19/97 301 - 2 nd floor gym rated ceilling and shafts ok all but 2 wer flue.
|
INSP - Framing/Rough-in | 12/18/1997 | 12/18/1997 | 12/18/1997 | P | PART |
Jim Storey
|
|
|
12/18/97 301 - 2 hr celling work in progess.
|
INSP - Conference | 8/18/1997 | 8/18/1997 | 8/18/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - meet with special insp. and decused the out standing reports recieved. jan welsh w/ staply engeering, special insp. and myself to mee site as soon as fix for all isues is perposed. pending
|
INSP - Foundation | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | PART |
Jim Storey
|
|
|
07/03/97 301 - pouring at 11:30placed with special insp. pending report.
|
INSP - Framing/Rough-in | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | CANC |
Jim Storey
|
|
|
07/01/97 301 - drain thumps???? He will call you public works insp.
|
INSP - Foundation | 6/30/1997 | 6/30/1997 | 6/30/1997 | P | PART |
Jim Storey
|
|
|
06/30/97 301 - pouring at 2 o'clock covered by special insp. pewnding report
|
INSP - Footings | 6/27/1997 | 6/27/1997 | 6/27/1997 | P | PART |
Jim Storey
|
|
|
06/27/97 301 - REBAR EARLY PM POURING AT 2 P.M. FRMS-OK FORMS-REBAR covered by special insp report pending.
|