INSP - Final | 10/26/1998 | 10/26/1998 | 10/26/1998 | P | PASS |
|
|
|
10/26/98 338 - Final - St. Al's - 365 sq.ft. addn. fire riser rm. & elec. rm. made ok for c/o
|
Permanent Occupancy | | 10/23/1998 | 10/23/1998 | | DONE |
|
|
|
|
INSP - Final | 10/16/1998 | 10/16/1998 | 10/16/1998 | A | PART |
|
|
|
10/19/98 338 - cecil -###-#### fn occ per perry at 10:30 made ok for tem
|
INSP - Final | 10/16/1998 | 10/16/1998 | 10/16/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP ALARM SYSTEM OK SPKLR SYSTEM ISSUES REMAIN
|
INSP-Final Inspection | 10/1/1998 | 10/5/1998 | 10/5/1998 | P | FAIL |
Joe Tawney
|
|
|
10/06/98 406 - CECIL ###-#### FINAL FAIL ALARM SYSTEM TEST
|
INSP-Conference | 5/7/1998 | 5/7/1998 | 5/7/1998 | P | PASS |
|
|
|
05/07/98 338 - made ok need drawings for backup on wall change details
|
INSP-Final Inspection | 1/9/1998 | 1/12/1998 | 1/12/1998 | P | PART |
Joe Tawney
|
|
|
01/12/98 406 - Cecil ###-#### 1st floor east end FINAL OK FOR TEMP OCC OF ROOM 1A
|
INSP-Supply line flush | 11/13/1997 | 11/13/1997 | 11/13/1997 | A | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH OK ON OVERHEAD ROUGH IN OK TO COVER
|
INSP - Framing/Rough-in | 11/10/1997 | 11/12/1997 | 11/12/1997 | P | PASS |
|
|
|
ST. AL'S, EAST END, PARTIAL made ok to cover behind the ele insp passes
|
INSP - Wall cover | 9/25/1997 | 9/26/1997 | 9/26/1997 | A | PASS |
|
|
|
09/26/97 338 - parapet on the roof hope this is under the correct inspec block/stop is in place at the
|
INSP - Footings | 7/31/1997 | 7/31/1997 | 7/31/1997 | | PASS |
|
|
|
/ / 338 - sp insp made ok MASN-REBAR OK
|
INSP - Foundation | 7/29/1997 | 7/31/1997 | 7/31/1997 | A | PART |
|
|
|
07/31/97 338 - concrete canopy pouring/ emerg. entrance east end divisio insp MASN-REBAR OK
|