INSP - Final | 6/3/1998 | 6/3/1998 | 6/3/1998 | P | PASS |
Carl Dependahl
|
|
|
STRUCT PORTION W/ BLD 97-0401, HP BLDG 6. OK FOR L/C ONLY
|
INSP - Final | 5/18/1998 | 5/18/1998 | 5/18/1998 | A | FAIL |
Carl Dependahl
|
|
|
need verify firestops at replaced section 2hr wall
|
INSP - Final | 4/24/1998 | 4/24/1998 | 4/24/1998 | A | NR |
Carl Dependahl
|
|
|
NO INSP, CONF W/ TIM B. RE FINAL, KEEP C/N. CHEMICAL ISSUES APPEAR TO BE RESOLVED, WILL CHECK W/ FLOYD V.
|
INSP - Conference | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | PASS |
Carl Dependahl
|
|
|
NEED TO COMPLETE PER PLAN FOR C/O....REMOVE CHILLER TANK, ETC.
|
INSP - Conference | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ BRIAN PRICE RE: REMOVAL OF CHILLER TANK & REALIGN TEMP. CONDITION OF 2HR WALL AT BSMT. NEED TO COMPLETE BEFORE L/C. STRUCT PERMIT W/ BLD97-0401
|
INSP - Conference | 10/28/1997 | 10/28/1997 | 10/28/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ DAN S. RE 2HR WALL AT BGSMT...TEMP JOG AT TANK YET TO BE REMOVED. SHOULD BE DONE SOON AS CHILLER ADDED WILL BE ONLINE.
|
INSP - Carpentry | 10/17/1997 | 10/16/1997 | 10/16/1997 | P | PART |
Carl Dependahl
|
|
|
2 hr wall & structure w/ BLD97-0401... HP 6 FAB
|
INSP - Conference | 9/29/1997 | 9/29/1997 | 9/29/1997 | P | PASS |
Carl Dependahl
|
|
|
W/DAN S. RE FINAL HP6
|
INSP - Carpentry | 9/25/1997 | 9/25/1997 | 9/25/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - 2HR WALL, ETC.
|
INSP - Carpentry | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PART |
Carl Dependahl
|
|
|
09/23/97 340 - HP 6. NEED TO VERIFY COL. & BEAM WRAP AT 10' FROM 2 HR WA
|
INSP - Carpentry | 9/22/1997 | 9/22/1997 | 9/22/1997 | P | PART |
Carl Dependahl
|
|
|
09/22/97 340 - HP 6
|
INSP - Carpentry | 9/18/1997 | 9/19/1997 | 9/19/1997 | P | PART |
Carl Dependahl
|
|
|
09/19/97 340 -
|
INSP - Conference | 9/18/1997 | 9/18/1997 | 9/18/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ BLD97-0401
|
INSP - Carpentry | 9/3/1997 | 9/3/1997 | 9/4/1997 | P | PART |
Carl Dependahl
|
|
|
09/03/97 340 - W/ BLD970401...WIP
|
INSP - Wall cover | 8/28/1997 | 8/28/1997 | 8/28/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - 2HR WALL W/ BLD97-0401, BLDG 6; CHK BEAM WRAP, FIRESTOPS, ET
|
INSP - Carpentry | 8/25/1997 | 8/25/1997 | 8/25/1997 | P | PART |
Carl Dependahl
|
|
|
08/25/97 340 - PROGRESS FOR FINAL
|
INSP - Carpentry | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | PASS |
Carl Dependahl
|
|
|
REC'D SPEC INSP REPORT RE FIREPROOFING AT 2HR WALL
|
INSP - Conference | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | PASS |
Carl Dependahl
|
|
|
KEEP C/N, NEED CARD FOR L/C...W/ BLD97-0401( THIS IS STRUCT PERMIT FOR 2HR & CORR. WALLS, ETC AT BLDG 6, HP
|
INSP - Conference | 8/7/1997 | 8/7/1997 | 8/7/1997 | A | PASS |
Carl Dependahl
|
|
|
RE FIRESTOPS SUBMITTED BY HILTI
|
INSP - Carpentry | 8/4/1997 | 8/4/1997 | 8/4/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - BLDG 6; KEEP C/N NEED FIRESTOP SPECS
|
INSP - Conference | 8/1/1997 | 8/1/1997 | 8/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE SPEC INSP REPORTS NOT COMPLETED FOR 2HR WALL AT BLDG 6
|
INSP - Carpentry | 7/29/1997 | 7/29/1997 | 7/29/1997 | | PART |
Carl Dependahl
|
|
|
07/29/97 340 - 2 HR WALL W/ 97-0401
|
INSP - Conference | 7/22/1997 | 7/22/1997 | 7/22/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ DAN S. RE FINAL. L/C ONLY ON STRUCT PERMIT
|
INSP - Carpentry | 7/18/1997 | 7/18/1997 | 7/18/1997 | P | PART |
Carl Dependahl
|
|
|
07/18/97 340 - STRUCT AND 2HR WALL, HP BLDG 6, INK JET FAB AREA; AWAITIN CABLE TRAYS, ETC. ALSO SPEC INSP REPORTS FOR SPRAY ON.
|
INSP - Masonry | 7/18/1997 | 7/18/1997 | 7/18/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CHILLER, BLDG 6; SPEC INSP REPORT PENDING..SENT TO SLY IN ER
|
INSP - Carpentry | 7/17/1997 | 7/17/1997 | 7/18/1997 | P | FAIL |
Carl Dependahl
|
|
|
07/17/97 340 - 2HR WALL...MET HILTI REP RE FIRESTOPS. NEED ENG'S RECOMEN PENETRATIONS.
|
INSP - Carpentry | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | PART |
Carl Dependahl
|
|
|
2HR AREA SEP WALL...W/ BLD97-0401, IJ14; HP BLDG 6
|
INSP - Conference | 7/15/1997 | 7/14/1997 | 7/14/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ CONT. RE 2HR WALL REQ'S FOR T/O
|
INSP - Carpentry | 7/10/1997 | 7/10/1997 | 7/10/1997 | P | PART |
Carl Dependahl
|
|
|
07/10/97 340 - 2HR WALL RESUB...WIP
|
INSP - Carpentry | 7/8/1997 | 7/8/1997 | 7/8/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - firestops at 2hr
|
INSP - Carpentry | 7/1/1997 | 7/1/1997 | 7/1/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - 2 HR WALL AT 6 BSMT; WILL SUBMIT FOR TEMP MOD AT WALL/ TANK
|
INSP - Conference | 6/25/1997 | 6/25/1997 | 6/25/1997 | A | PASS |
Carl Dependahl
|
|
|
W JOHN KERR RE FIRESTOPS
|
INSP - Framing/Rough-in | 6/23/1997 | 6/23/1997 | 6/23/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - BLDG 6 2HR WALL PHASE; C/N W/ FRAME INSP BLD 97-0401
|
INSP - Conference | 6/11/1997 | 6/11/1997 | 6/11/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - bldg 6, ink jet proj; w/ Dan Stuart
|
INSP - Conference | 6/10/1997 | 6/10/1997 | 6/10/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - STRUCT FOR 2HR WALL OK
|
INSP - Conference | 6/10/1997 | 6/10/1997 | 6/10/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - STRUCT FOR 2HR WALL OK
|
INSP - Conference | 5/13/1997 | 5/13/1997 | 5/13/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE BLDG 6 ; INK JET PROJ.
|
INSP - Conference | 5/7/1997 | 5/7/1997 | 5/7/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ DAN STUART RE INK JET PROJ
|
INSP - Carpentry | 5/5/1997 | 5/6/1997 | 5/6/1997 | P | PART |
Carl Dependahl
|
|
|
05/06/97 340 -
|
INSP - Carpentry | 5/6/1997 | 5/6/1997 | 5/6/1997 | | PART |
Carl Dependahl
|
|
|
05/06/97 340 - #6
|
INSP - Carpentry | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | NR |
Carl Dependahl
|
|
|
05/05/97 340 - BLDG #6 NO CONTACT PERSON, CALLED TIM BASHFORD, NO RESPON
|
INSP - Carpentry | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PASS |
Carl Dependahl
|
|
|
04/22/97 340 - BLDG. #6 PAUL HESKETH -###-#### NEED FURTHER PERMIT TO CO CHK WIP
|