INSP - Final | 4/29/1997 | 4/30/1997 | 4/30/1997 | P | CANC |
Jim Storey
|
|
|
04/29/97 301 - trans to kim 4th south end.
|
Permanent Occupancy | | 4/30/1997 | 4/30/1997 | | DONE |
|
|
|
|
INSP-Final Inspection | 4/28/1997 | 4/29/1997 | 4/29/1997 | A | PASS |
|
|
|
ALARMS TESTED, BASEMENT SEPARATION OF TANK TESTED, PASS
|
INSP-Final Inspection | 4/17/1997 | 4/17/1997 | 4/17/1997 | A | FAIL |
|
|
|
3rd floor corridor requirements and basement diesel tank requirements NOT MET
|
INSP-Sprinkler Rough-in/Hydro | 4/16/1997 | 4/16/1997 | 4/16/1997 | P | PASS |
|
|
|
1pm pre-action system test system trip test ok, need to connect fm 200 smoke detectors to building supervisory since panel location is not constantly attended and signal is not sent to approved central station. will check w/ final
|
INSP - Framing/Rough-in | 4/8/1997 | 4/9/1997 | 4/8/1997 | P | PASS |
|
|
|
04/09/97 333 - GRID 3 RD FLOOR SCLG-OK SUSPENDED CEILING
|
INSP-Conference | 3/26/1997 | 3/26/1997 | 3/26/1997 | A | PART |
|
|
|
delivered notice of violation to roger of merrill. Discussed possible ways to correct.
|
INSP - Final | 3/21/1997 | 3/25/1997 | 3/25/1997 | A | FAIL |
|
|
|
gst 4th flr not complete, want to use fm 200 in place of sprinklers, plans called for fm200 to be additional. alarms not connected, corridor doors not installed. advised Roger w/ Merrill to drop sprinklers into space or request approval of fm200 as a replacement system from the fire chief.
|
INSP - Ceiling grid | 3/6/1997 | 3/7/1997 | 3/6/1997 | A | PASS |
|
|
|
03/07/97 333 - 4TH FLOOR SCLG-OK SUSPENDED CEILING
|
INSP - Framing/Rough-in | 2/24/1997 | 2/24/1997 | 2/23/1997 | P | PASS |
|
|
|
02/24/97 333 -
|