Permanent Occupancy | | 11/21/1997 | 11/21/1997 | | DONE |
|
|
|
|
INSP - Final | 11/20/1997 | 11/20/1997 | 11/20/1997 | P | PASS |
|
|
|
signed the final col perm out building ok also
|
INSP - Final | 11/20/1997 | 11/20/1997 | 11/20/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC & CERT OF COMPLETION
|
INSP-Final Inspection | 11/18/1997 | 11/19/1997 | 11/19/1997 | A | FAIL |
Joe Tawney
|
|
|
11/19/97 406 - REINSP FOR FINAL FAIL SHUNT TRIP FOR ELEVATOR DID NOT WO
|
INSP-Final Inspection | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | FAIL |
Joe Tawney
|
|
|
11/14/97 406 - REINSP FOR FINAL FAIL HEAT DET FOR SHUNT TRIP FIRE EXT CA
|
INSP-Final Inspection | 10/8/1997 | 10/10/1997 | 10/13/1997 | P | PART |
Joe Tawney
|
|
|
10/10/97 406 - FINAL OK FOR TEMP OCC ELEV SHUNT TAG EXT STRIPE CURBS SP
|
INSP - Conference | 10/10/1997 | 10/10/1997 | 10/10/1997 | | PASS |
|
|
|
/ / 338 -
|
INSP - Final | 10/8/1997 | 10/10/1997 | 10/10/1997 | P | PART |
|
|
|
10/10/97 338 - temp ok other agencies approved for temp only storage bui
|
INSP - Framing/Rough-in | 10/6/1997 | 10/7/1997 | 10/6/1997 | A | PASS |
|
|
|
10/07/97 338 - CEILING GRID/ K2 OFFICE made ok except the front entry 1s check at the final insp
|
INSP - Carpentry | 10/3/1997 | 10/3/1997 | 10/3/1997 | | PASS |
|
|
|
/ / 338 - met with the ceiling grid man wants inspection as late as po
|
INSP - Framing/Rough-in | 10/2/1997 | 10/3/1997 | 10/3/1997 | P | PASS |
|
|
|
10/03/97 338 - made ok GRID
|
INSP-Final Inspection | 10/2/1997 | 10/2/1997 | 10/2/1997 | P | PART |
Joe Tawney
|
|
|
10/02/97 406 - OK ON HYDRO TEST FOR SPKLR SYSTEM
|
INSP-Sprinkler Rough-in/Hydro | 9/5/1997 | 9/5/1997 | 9/5/1997 | P | PART |
Joe Tawney
|
|
|
09/05/97 406 - OK ON SPKLR SYSTEM ROUGH IN
|
INSP-Supply line flush | 9/5/1997 | 9/5/1997 | 9/5/1997 | P | PART |
Joe Tawney
|
|
|
09/05/97 406 - OK ON UNDERGROUND FLUSH AND SPKLR SYSTEM ROUGH IN
|
INSP - Framing/Rough-in | 8/21/1997 | 8/22/1997 | 8/22/1997 | P | PART |
|
|
|
08/22/97 338 - made ok to cover behind the plmg inspector will mnot cove
|
INSP - Conference | 8/6/1997 | 8/6/1997 | 8/6/1997 | | PASS |
|
|
|
/ / 338 -
|
INSP - Conference | 8/6/1997 | 8/6/1997 | 8/6/1997 | P | PART |
|
|
|
08/06/97 338 - need details for stair support changes, sp insp on new ep details for colum wrap and termination and penetrations of same.need flo pene assys
|
INSP - Masonry | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | PASS |
|
|
|
07/16/97 338 - made ok MASN-REBAR OK
|
INSP - Masonry | 7/11/1997 | 7/14/1997 | 7/14/1997 | P | PASS |
|
|
|
07/14/97 338 - not ready with the paperwork but ok t opour with the sp i topfinal bond beam
|
INSP - Masonry | 7/9/1997 | 7/10/1997 | 7/10/1997 | A | PASS |
|
|
|
07/10/97 338 - made ok with sp insp approval MASN-REBAR OK
|
INSP - Masonry | 7/8/1997 | 7/9/1997 | 7/9/1997 | A | PASS |
|
|
|
07/10/97 338 - re-bar MASN-REBAR OK OK WITH SP INSP APPROVAL
|
INSP - Masonry | 7/7/1997 | 7/8/1997 | 7/8/1997 | A | PASS |
|
|
|
07/08/97 338 - REBAR GROUT POUR MASN-REBAR OK
|
INSP - Masonry | 6/19/1997 | 6/20/1997 | 6/20/1997 | A | PART |
Tom Arcoraci
|
|
|
MASONRY REBAR...part, 338 area
|
INSP - Masonry | 6/19/1997 | 6/19/1997 | 6/19/1997 | P | PASS |
|
|
|
06/19/97 338 - BLK.WALL & REBAR r-bar placed MASN-REBAR OK
|
INSP - Masonry | 6/17/1997 | 6/18/1997 | 6/18/1997 | A | PASS |
|
|
|
06/18/97 338 - REBAR AND BLK WALL MASN-REBAR OK
|
INSP - Masonry | 6/10/1997 | 6/11/1997 | 6/10/1997 | P | PASS |
|
|
|
06/11/97 338 - BLOCK WALLS made ok r-bar placed
|
INSP - Foundation | 6/10/1997 | 6/10/1997 | 6/10/1997 | P | PASS |
|
|
|
06/10/97 338 - FND. WALL
|
INSP - Masonry | 6/10/1997 | 6/10/1997 | 6/10/1997 | | PASS |
|
|
|
/ / 338 - MADE OK R-BAR PLACED
|
INSP - Masonry | 6/10/1997 | 6/10/1997 | 6/10/1997 | P | NR |
|
|
|
06/10/97 338 - BLOCK WALLS LATE PM. NOT READY WILL REINSPECT FOR TOMORR
|
INSP - Foundation | 6/5/1997 | 6/6/1997 | 6/6/1997 | A | PASS |
|
|
|
06/06/97 338 - north west found walls ok
|
INSP - Footings | 6/2/1997 | 6/3/1997 | 6/3/1997 | A | PASS |
|
|
|
06/03/97 338 - after 9 a.m. FTG -OK FOOTING
|
INSP - Foundation | 6/2/1997 | 6/3/1997 | 6/3/1997 | A | PASS |
|
|
|
06/03/97 338 - after 9 a.m. FDN -OK FOUNDATION
|
INSP - Wall cover | 5/29/1997 | 5/30/1997 | 5/30/1997 | A | PASS |
|
|
|
05/30/97 338 - foundation of main building south wall
|
INSP - Footings | 5/23/1997 | 5/27/1997 | 5/27/1997 | P | PASS |
|
|
|
05/27/97 338 - REBAR FOOTING/SLAB RIGHT AFTER LUNCH IF POSSIBLE good r-b dobies
|
INSP - Conference | 5/21/1997 | 5/21/1997 | 5/21/1997 | | PASS |
|
|
|
/ / 338 - recieved change design to make the footing concrete thicker upper foundation wall form placing.
|
INSP - Foundation | 5/21/1997 | 5/21/1997 | 5/21/1997 | | PASS |
|
|
|
/ / 338 - r-bar placed forms erected ok to pour concrete.
|
INSP - Foundation | 5/21/1997 | 5/21/1997 | 5/21/1997 | | PASS |
|
|
|
/ / 338 - r-bar placed forms erected ok to pour concrete.
|
INSP - Wall cover | 5/20/1997 | 5/21/1997 | 5/21/1997 | A | CANC |
|
|
|
05/21/97 338 - was called in for a found insp for r-bar and steel placem
|
INSP - Footings | 5/14/1997 | 5/15/1997 | 5/15/1997 | P | PASS |
|
|
|
05/15/97 338 - mad eok r-bar placed all buthe entry
|