(K2 CORPORATE OFFICE)(K2 CONSTRUCTION INC.) THE FIRST BUILDING IS TO CONSTRUCT A NEW 2 STORY 17900 SQUARE FOOT OFFICE BUILDING WITH ONLY THE SECOND FLOOR FINISHED. CONSTRUCTION TO BE ALL NONCOMBUSTIBLE MATERIALS, CONCRETE FOUNDATION AND FLOOR SLABS, STEEL (DELTA JOIST),CONCRETE BLOCK AND BRICK VENEER EXTERIOR AND STRUCTURAL STEEL SUPPORT COLUMNS AND BEAMS, INTERIOR TO BE SHEET ROCKED AND SUSPENDED CEILINGS AND FINISHED RESTROOMS BOTH FLOORS. SECOND FLOOR ONLY TO HAVE INTERIOR PARTITIONS, DOORS AND INTERIOR GLAZING. NOTE! THIS BUILDING IS FULLY FIRE SPRINKLERED AND IS USED FOR ONE-HOUR SUBSTITUTION. THE SECOND BUILDING IS A PRE-ENGINEERED STEEL BUILDING WITH 3876 SQUARE FEET WAREHOUSE BUILDING. THIS BUILDING IS NON-SPRINKLERED AND NO INTERIOR FINISH, ALL LOCATED ON A CONCRETE FOUNDATION AND FLOOR SLAB. ALL PER APPROVED PLANS ON FILE. DR#77-96 PC#064-97
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 11/21/199711/21/1997 DONE
Details
INSP - Final11/20/199711/20/199711/20/1997PPASS
Details
signed the final col perm out building ok also
INSP - Final11/20/199711/20/199711/20/1997 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC & CERT OF COMPLETION
INSP-Final Inspection11/18/199711/19/199711/19/1997AFAIL
DetailsJoe Tawney
11/19/97 406 - REINSP FOR FINAL FAIL SHUNT TRIP FOR ELEVATOR DID NOT WO
INSP-Final Inspection11/14/199711/14/199711/14/1997PFAIL
DetailsJoe Tawney
11/14/97 406 - REINSP FOR FINAL FAIL HEAT DET FOR SHUNT TRIP FIRE EXT CA
INSP-Final Inspection10/8/199710/10/199710/13/1997PPART
DetailsJoe Tawney
10/10/97 406 - FINAL OK FOR TEMP OCC ELEV SHUNT TAG EXT STRIPE CURBS SP
INSP - Conference10/10/199710/10/199710/10/1997 PASS
Details
/ / 338 -
INSP - Final10/8/199710/10/199710/10/1997PPART
Details
10/10/97 338 - temp ok other agencies approved for temp only storage bui
INSP - Framing/Rough-in10/6/199710/7/199710/6/1997APASS
Details
10/07/97 338 - CEILING GRID/ K2 OFFICE made ok except the front entry 1s check at the final insp
INSP - Carpentry10/3/199710/3/199710/3/1997 PASS
Details
/ / 338 - met with the ceiling grid man wants inspection as late as po
INSP - Framing/Rough-in10/2/199710/3/199710/3/1997PPASS
Details
10/03/97 338 - made ok GRID
INSP-Final Inspection10/2/199710/2/199710/2/1997PPART
DetailsJoe Tawney
10/02/97 406 - OK ON HYDRO TEST FOR SPKLR SYSTEM
INSP-Sprinkler Rough-in/Hydro9/5/19979/5/19979/5/1997PPART
DetailsJoe Tawney
09/05/97 406 - OK ON SPKLR SYSTEM ROUGH IN
INSP-Supply line flush9/5/19979/5/19979/5/1997PPART
DetailsJoe Tawney
09/05/97 406 - OK ON UNDERGROUND FLUSH AND SPKLR SYSTEM ROUGH IN
INSP - Framing/Rough-in8/21/19978/22/19978/22/1997PPART
Details
08/22/97 338 - made ok to cover behind the plmg inspector will mnot cove
INSP - Conference8/6/19978/6/19978/6/1997 PASS
Details
/ / 338 -
INSP - Conference8/6/19978/6/19978/6/1997PPART
Details
08/06/97 338 - need details for stair support changes, sp insp on new ep details for colum wrap and termination and penetrations of same.need flo pene assys
INSP - Masonry7/16/19977/16/19977/16/1997PPASS
Details
07/16/97 338 - made ok MASN-REBAR OK
INSP - Masonry7/11/19977/14/19977/14/1997PPASS
Details
07/14/97 338 - not ready with the paperwork but ok t opour with the sp i topfinal bond beam
INSP - Masonry7/9/19977/10/19977/10/1997APASS
Details
07/10/97 338 - made ok with sp insp approval MASN-REBAR OK
INSP - Masonry7/8/19977/9/19977/9/1997APASS
Details
07/10/97 338 - re-bar MASN-REBAR OK OK WITH SP INSP APPROVAL
INSP - Masonry7/7/19977/8/19977/8/1997APASS
Details
07/08/97 338 - REBAR GROUT POUR MASN-REBAR OK
INSP - Masonry6/19/19976/20/19976/20/1997APART
DetailsTom Arcoraci
MASONRY REBAR...part, 338 area
INSP - Masonry6/19/19976/19/19976/19/1997PPASS
Details
06/19/97 338 - BLK.WALL & REBAR r-bar placed MASN-REBAR OK
INSP - Masonry6/17/19976/18/19976/18/1997APASS
Details
06/18/97 338 - REBAR AND BLK WALL MASN-REBAR OK
INSP - Masonry6/10/19976/11/19976/10/1997PPASS
Details
06/11/97 338 - BLOCK WALLS made ok r-bar placed
INSP - Foundation6/10/19976/10/19976/10/1997PPASS
Details
06/10/97 338 - FND. WALL
INSP - Masonry6/10/19976/10/19976/10/1997 PASS
Details
/ / 338 - MADE OK R-BAR PLACED
INSP - Masonry6/10/19976/10/19976/10/1997PNR
Details
06/10/97 338 - BLOCK WALLS LATE PM. NOT READY WILL REINSPECT FOR TOMORR
INSP - Foundation6/5/19976/6/19976/6/1997APASS
Details
06/06/97 338 - north west found walls ok
INSP - Footings6/2/19976/3/19976/3/1997APASS
Details
06/03/97 338 - after 9 a.m. FTG -OK FOOTING
INSP - Foundation6/2/19976/3/19976/3/1997APASS
Details
06/03/97 338 - after 9 a.m. FDN -OK FOUNDATION
INSP - Wall cover5/29/19975/30/19975/30/1997APASS
Details
05/30/97 338 - foundation of main building south wall
INSP - Footings5/23/19975/27/19975/27/1997PPASS
Details
05/27/97 338 - REBAR FOOTING/SLAB RIGHT AFTER LUNCH IF POSSIBLE good r-b dobies
INSP - Conference5/21/19975/21/19975/21/1997 PASS
Details
/ / 338 - recieved change design to make the footing concrete thicker upper foundation wall form placing.
INSP - Foundation5/21/19975/21/19975/21/1997 PASS
Details
/ / 338 - r-bar placed forms erected ok to pour concrete.
INSP - Foundation5/21/19975/21/19975/21/1997 PASS
Details
/ / 338 - r-bar placed forms erected ok to pour concrete.
INSP - Wall cover5/20/19975/21/19975/21/1997ACANC
Details
05/21/97 338 - was called in for a found insp for r-bar and steel placem
INSP - Footings5/14/19975/15/19975/15/1997PPASS
Details
05/15/97 338 - mad eok r-bar placed all buthe entry