Permanent Occupancy | | 6/4/1998 | 6/4/1998 | | DONE |
|
|
|
|
INSP - Final | 5/29/1998 | 6/3/1998 | 6/3/1998 | P | PASS |
Carl Dependahl
|
|
|
hp #6-dan hayes ###-####/ 2HR WALL FIRESTOPPED, HPM PIPING PROTECTED ACROSS COMPRESSOR ROOM & CORRIDOR TO H-6 BASEMENT; C/N OK,CARD TO CONTRACTOR FOR C/O
|
INSP - Final | 4/24/1998 | 4/24/1998 | 4/24/1998 | A | NR |
Carl Dependahl
|
|
|
NO INSP...CONF W/ TIM BASHFORD, KEEP C/N. CHK W/ FLOYD RE CHEMICAL ISSUES FOR OK OF HPM CORRIDOR.
|
INSP - Final | 3/13/1998 | 3/13/1998 | 3/13/1998 | A | NR |
Carl Dependahl
|
|
|
conf w/ dan hayes at hp, no insp
|
INSP - Framing/Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 | P | PART |
Carl Dependahl
|
|
|
chk 2hr wall at chiller tank, if tank removed; wall redone??? TANK GONE, WALL REDONE; NEED FIRESTOP DETAILING
|
INSP - Conference | 2/4/1998 | 2/3/1998 | 2/3/1998 | P | PASS |
Carl Dependahl
|
|
|
W/ FLOYD; ALSO SPOKE W/ ERNIE HARPER RE STATUS OF JOB
|
INSP - Conference | 1/22/1998 | 1/22/1998 | 1/22/1998 | A | PASS |
Carl Dependahl
|
|
|
W/ DAN STUART RE SUBMITTAL FROM ANDERSON CONST RE 1HR HPM PIPING ENCLOSURE...WILL MEET W/ CONT NEXT WEEK
|
INSP - Conference | 12/2/1997 | 12/2/1997 | 12/2/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ FLOYD RE ALARM RESUBMITTAL
|
INSP - Carpentry | 11/7/1997 | 11/7/1997 | 11/7/1997 | A | PART |
Carl Dependahl
|
|
|
FOLLOW UP OF CONF. W BRIAN PRICE 11-6-97; LEFT MSG W/ DAN HAYES AT SITE, WILL RECALL WHEN ALL RESUBMITTALS ARE IN. FLOYD REVIEWING CHEMICAL REPORT. SENT TO 316 IN ERROR 11-6-97.
|
INSP - Letter of compliance | 11/6/1997 | 11/6/1997 | 11/7/1997 | | CANC |
Jim Sly
|
|
|
11/06/97 316 - Gave to Carl D.
|
INSP - Conference | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ BRIAN PRICE, DANS. & FLOYD V. RE HP6; PROPOSAL TO PROTECT PIPING; STILL NEED CHEM. ANALYSIS & HPM SERVICE CORRIDOR RESOLUTION.
|
INSP - Conference | 11/5/1997 | 11/5/1997 | 11/5/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ BRIAN PRICE OF ANDERSON CONST. WILL COME IN 11-6-97 TO DISCUSS PROPOSAL.
|
INSP - Conference | 11/5/1997 | 11/5/1997 | 11/5/1997 | A | PASS |
Carl Dependahl
|
|
|
TALKED TO BOB G. & DAN S. RE: RESUBMITTAL FOR HPM TUBING PROTECTION AT NON H6 OCC.
|
INSP - Conference | 10/28/1997 | 10/28/1997 | 10/28/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ DAN S. RE RESUBMITTAL HP 6
|
INSP - Conference | 10/28/1997 | 10/27/1997 | 10/27/1997 | P | PASS |
Carl Dependahl
|
|
|
REC'D RESUBMITTAL TO UPGRADE ALARM & DETECTION SYSTEM AT HP6; DISCUSSED W/ DAN HAYES OF ANDERSON/HP; GAVE COPY TO FLOYD FOR REVIEW
|
INSP - Conference | 10/24/1997 | 10/24/1997 | 10/24/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ DAN S RE SUBMITTAL REC'D FOR 1 HR PROTECTION OF HPM PIPING...NEED BETTER DETAIL THAT MEETS CODE, PROVIDES RATING FOR ENTIRE ASSEMBLY PER DAN.
|
INSP - Final | 10/15/1997 | 10/16/1997 | 10/16/1997 | P | FAIL |
Carl Dependahl
|
|
|
hp6...KEEP C/N,STILL NEED APPROVED CHEM. ANALYSIS
|
INSP - Final | 10/13/1997 | 10/15/1997 | 10/14/1997 | P | CANC |
Jim Sly
|
|
|
10/14/97 316 - bld 6 Gave to Carl D.
|
INSP - Conference | 10/14/1997 | 10/13/1997 | 10/13/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ DAN HAYES OF ANDERSON CONST. RE FINAL REQ'S & PROPOSAL FOR SUBMITTALS.
|
INSP - Conference | 10/8/1997 | 10/8/1997 | 10/8/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ DAN HAYES, ANDERSON CONST/HP...TOLD TO HAVE ARCH SUBMIT DETAIL FOR PROTECTION OF HPM PIPING RATHER THAN APPROVE IN FIELD
|
INSP - Conference | 10/2/1997 | 10/1/1997 | 10/1/1997 | P | PASS |
Carl Dependahl
|
|
|
W/BRIAN PRICE OF ANDERSON CONST. CONT. TO BE OFF JOB SOON...NEED TO MAKE ARRANGEMENTS FOR FINAL; RESUBMITTALS AND RESOLUTION TO ITEMS NOTED IN INITIAL PLAN CHECK AND CORRECTIONS IS STILL REQ'D
|
INSP-Final Inspection | 9/29/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
Joe Tawney
|
|
|
09/30/97 406 - REINSP FOR FINAL OK FOR PERM OCC OR CERT OF COMPL
|
INSP - Conference | 9/29/1997 | 9/29/1997 | 9/29/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ JOE TAWNEY RE FINAL FOR HP 6
|
INSP - Conference | 9/26/1997 | 9/26/1997 | 9/26/1997 | P | PASS |
Carl Dependahl
|
|
|
09/26/97 340 - CONT TO BE OFF JOB SOON, NO FINAL ISSUED; HPM ISSUES YET RESOLVED....NEED TO CONSULT G.S. OR?
|
INSP - Letter of compliance | 9/26/1997 | 9/26/1997 | 9/26/1997 | P | CANC |
Carl Dependahl
|
|
|
09/26/97 340 - CANC, NR FOR FINAL, KEEP C/N
|
INSP - Conference | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
Carl Dependahl
|
|
|
09/23/97 340 - HP 6; AWAITING RESOLUTION TO C/N, CHEM, COMPLETION OF STO DISPOSAL; NEED ALL FINAL SIGS.
|
INSP - Carpentry | 9/22/1997 | 9/22/1997 | 9/22/1997 | P | PART |
Carl Dependahl
|
|
|
09/22/97 340 - HP 6, FAB AREA/BSMT.
|
INSP - Carpentry | 9/18/1997 | 9/19/1997 | 9/19/1997 | P | PART |
Carl Dependahl
|
|
|
09/19/97 340 - RE FINAL FOR #6
|
INSP - Carpentry | 9/18/1997 | 9/19/1997 | 9/19/1997 | P | PART |
Carl Dependahl
|
|
|
09/19/97 340 -
|
INSP - Conference | 9/18/1997 | 9/18/1997 | 9/18/1997 | A | PASS |
Carl Dependahl
|
|
|
CHK'D W/ DAN RE SUBMITTALS FOR FINAL ON BLDG 6 INK JET PROJECT; CHEM ANALYSIS, HPM SEPARATION, ETC.
|
INSP - Conference | 9/15/1997 | 9/11/1997 | 9/11/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ FLOYD RE CHEM ANALYSIS, HPM CORR, BLDG 6; REJECT, KEEP CN
|
INSP - Carpentry | 9/3/1997 | 9/3/1997 | 9/4/1997 | P | PART |
Carl Dependahl
|
|
|
09/03/97 340 - BLDG 6; CHK C/N FOR FINAL...WIP,NEED REPORT ON CHEM ANALY PLAN CHK ITEMS
|
INSP - Carpentry | 8/28/1997 | 8/28/1997 | 8/28/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - walked job w/ andersen, chk'd wip for c/n on t/o
|
INSP - Carpentry | 8/25/1997 | 8/25/1997 | 8/25/1997 | P | PART |
Carl Dependahl
|
|
|
08/25/97 340 - IJ14, BLDG 6; WIP
|
INSP - Conference | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ DAN S. RE SILANE AREA; NEED MECH & ELEC TO CHECK OFF
|
INSP - Conference | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
Carl Dependahl
|
|
|
08/21/97 340 - W/ FLOYD VARLEY RE CHEM REPORT FOR HPM WASTES
|
INSP - Conference | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
Carl Dependahl
|
|
|
08/21/97 340 - W/ FLOYD VARLEY RE CHEM REPORT FOR HPM WASTES
|
INSP - Conference | 8/18/1997 | 8/18/1997 | 8/18/1997 | | PASS |
Carl Dependahl
|
|
|
08/18/97 340 - W/DAN STUART RE T/O
|
INSP - Conference | 8/18/1997 | 8/18/1997 | 8/18/1997 | P | PASS |
Carl Dependahl
|
|
|
W/DAN STUART RE T/O
|
INSP - Final | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | FAIL |
Carl Dependahl
|
|
|
recd letter from HP, issued c/n, ok for t/o, card to contractor at Cathy's desk. Copies of c/n & letter to Dan s.
|
INSP - Carpentry | 8/7/1997 | 8/7/1997 | 8/7/1997 | P | |
Carl Dependahl
|
|
|
###-#### Paul
|
INSP - Conference | 8/7/1997 | 8/7/1997 | 8/7/1997 | P | PASS |
Carl Dependahl
|
|
|
w/ MARK ELIOT, ARCH. WANTS TO ARRANGE CONF. W/ TIM H. HP, DAN S. ETC TO SEE ABOUT T/O...WILL HAVE TO FOLLOW UP ON REQUEST
|
INSP - Carpentry | 8/5/1997 | 8/6/1997 | 8/6/1997 | P | PART |
Carl Dependahl
|
|
|
###-#### fire penetration walls call the # if there are any questions
|
INSP - Conference | 8/5/1997 | 8/5/1997 | 8/5/1997 | P | PASS |
Carl Dependahl
|
|
|
08/05/97 340 - MET W/ PAUL, FOREMAN ANDERSON CO. REC'D LETTERS FROM HILT
|
INSP - Conference | 8/4/1997 | 8/4/1997 | 8/4/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - BLD6 INK JET PROJ...KEEP CN; HPM CORR AT BSMT STILL UNDER RE
|
INSP - Conference | 8/1/1997 | 8/1/1997 | 8/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - REC'D INCOMPLETE SPEC INSP REPORT COMPOSITE FROM MTI; NEED C AT HP. SPOKE W/ DAVE OF I.S.I.
|
INSP - Final | 8/1/1997 | 8/1/1997 | 8/1/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON TRIP TEST OF DELUGE SYSTEM FOR SILANE BOTTLE COOLING
|
INSP - Conference | 7/29/1997 | 7/29/1997 | 7/29/1997 | | PASS |
Carl Dependahl
|
|
|
07/29/97 340 - W/DAN, HP STAFF & ARCH; KEEP C/N , NEED RESUBMITTAL RE BS
|
INSP - Final | 7/29/1997 | 7/29/1997 | 7/29/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL INSP OF DELUGE SYSTEM FOR SILANE STATION FAIL SOL VLV
|
INSP - Final | 7/29/1997 | 7/29/1997 | 7/29/1997 | P | PART |
Joe Tawney
|
|
|
/ / 406 - ALARM TEST ON GAS DETECTION SYSTEM PASS
|
INSP - Conference | 7/22/1997 | 7/22/1997 | 7/22/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ DAN S. RE C/N'S & RESUBMITTAL
|
INSP - Carpentry | 7/21/1997 | 7/21/1997 | 7/21/1997 | P | FAIL |
Carl Dependahl
|
|
|
issued c/n; complete all control area walls, panic hdwe at main fl break room/ corridor. Need all spec insp reports & acceptance from MTI. Remove or seal pH adjust room non-rated dampers & firestop new plbg. Partial insp
|
INSP - Temporary occupancy | 7/18/1997 | 7/18/1997 | 7/18/1997 | P | NR |
Carl Dependahl
|
|
|
07/18/97 340 - BLDG 6, keep c/n, Dan S reviewing resub at bsmt hpm corr
|
INSP - Carpentry | 7/17/1997 | 7/17/1997 | 7/18/1997 | P | FAIL |
Carl Dependahl
|
|
|
07/17/97 340 - MEET ALAN 3 PM; KEEP C/N RE DOORS, FIRESTOPS, DAMPER AT C
|
INSP - Carpentry | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | FAIL |
Carl Dependahl
|
|
|
C/N: DOORS, CORRIDORS,HVAC FINAL, FIRESTOPPING, ETC. NEED TO GET ALL SPEC INSP REPORTS, WALK CAT-WALKS, ENG'S OK FOR UNUSUAL FIRESTOPS
|
INSP - Final | 7/16/1997 | 7/16/1997 | 7/16/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR TEMP OCC
|
INSP - Carpentry | 7/15/1997 | 7/15/1997 | 7/15/1997 | P | NR |
Carl Dependahl
|
|
|
HP #6 EAST/... NEED FIRE / SAFETY & OTHER OKS....WANTS T/O, WILL REINSPECT AFTER OTHER OKS. SPOKE TO JOHN KERR W/ ANDERSON CONST
|
INSP-Final Inspection | 7/14/1997 | 7/15/1997 | 7/15/1997 | P | FAIL |
Joe Tawney
|
|
|
07/15/97 406 - 1:00 HP #6 FINAL FAIL ALARM SYSTEM DOORS IN EXIT CORRIDORS
|
INSP - Conference | 7/15/1997 | 7/14/1997 | 7/14/1997 | P | PASS |
Carl Dependahl
|
|
|
W/DAN STUART RE DOOR REQS
|
INSP - Carpentry | 7/10/1997 | 7/10/1997 | 7/10/1997 | P | CANC |
Carl Dependahl
|
|
|
w/ PAUL H. OF ANDERSON CONST. OFF ###-####, CEL ###-####
|
INSP - Carpentry | 7/10/1997 | 7/10/1997 | 7/10/1997 | P | CANC |
Jim Sly
|
|
|
07/10/97 316 - Gave to Carl D.
|
INSP - Carpentry | 7/10/1997 | 7/10/1997 | 7/10/1997 | P | PART |
Carl Dependahl
|
|
|
07/10/97 340 - W PAUL OF ANDERSON ###-####, CEL 8502997, KEEP CN WIP
|
INSP - Carpentry | 7/8/1997 | 7/9/1997 | 7/10/1997 | A | CANC |
Alan Hauser
|
|
|
07/10/97 350 - ###-#### Paul in bld 6 this is for #340
|
INSP - Conference | 7/10/1997 | 7/8/1997 | 7/8/1997 | A | PASS |
Carl Dependahl
|
|
|
re swo for silane area (bld97-1640)
|
INSP-Sprinkler Rough-in/Hydro | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | PART |
Joe Tawney
|
|
|
07/03/97 406 - building 6 OK ON HYDRO TEST FOR PREACTION SYSTEM
|
INSP - Carpentry | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | FAIL |
Carl Dependahl
|
|
|
07/01/97 340 - BUILDING 6 PAUL ###-####; REQ'D REPAIR & BOX INSTALL PER
|
INSP - Carpentry | 6/30/1997 | 6/30/1997 | 6/30/1997 | P | PART |
Carl Dependahl
|
|
|
06/30/97 340 - Paul ###-#### ì
|
INSP-Sprinkler Rough-in/Hydro | 6/27/1997 | 6/27/1997 | 6/27/1997 | P | PART |
Joe Tawney
|
|
|
BLDG #6 TERRY NELSON - ###-####- CALL & THE OFFICE WILL PAGE HIM WITH THE TIME OF MEETING OK ON HYDRO TEST FOR BLDG #6
|
INSP - Conference | 6/25/1997 | 6/25/1997 | 6/25/1997 | | PASS |
|
|
|
W/ DAN STUART RE SWO IN RELATION TO REST OF BLDG...SWO ON PENDING BLD97-1640 ONLY (SILANE SHED)
|
INSP - Conference | 6/19/1997 | 6/23/1997 | 6/23/1997 | A | PASS |
Alan Hauser
|
|
|
06/23/97 350 - MEET W/ JOE, CARL, & HP AT BLDG 6 went through new fab. facility in bld. #6, with struct. and plan review
|
INSP - Conference | 6/19/1997 | 6/23/1997 | 6/23/1997 | A | PASS |
Carl Dependahl
|
|
|
06/23/97 340 - TAKE DAN S...MEET W/ JOE, ALAN, HP BLDG 6. REQUESTED RESU CORR ADDED AT BSMT
|
INSP - Conference | 6/19/1997 | 6/23/1997 | 6/23/1997 | A | PASS |
Joe Tawney
|
|
|
06/23/97 406 - CONF./ INSP. WITH CARL, DAN STUART, ALAN HAUSER AT HP BLD PERFORMED WALK THRU OF CONSTRUCTION AREA
|
INSP - Framing/Rough-in | 6/23/1997 | 6/23/1997 | 6/23/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - C/N; FIRESTOPS, WALL CONST, DOOR INSTALL, SPEC INSP REPORTS
|
INSP-Sprinkler Rough-in/Hydro | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PART |
Joe Tawney
|
|
|
06/23/97 406 - TERRY NELSON (OFFICE ###-####). CALL OFFICE & THEY WILL P MEET YOU AT SPECIFIED TIME.... BLDG.#6. ROUGH IN OK TO COVER
|
INSP - Conference | 6/19/1997 | 6/19/1997 | 6/19/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ DAN S. JOE TAWNEY & ALAN HAUSER TO ARRANGE GROUP CONF/ INSP AT BLDG 6 MON. 6-23
|
INSP - Conference | 6/17/1997 | 6/17/1997 | 6/17/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - MET W/ ARCH AT SITE; ASKED FOR SUBMITTAL FOR FIREPROOFING CH
|
INSP - Framing/Rough-in | 6/16/1997 | 6/17/1997 | 6/17/1997 | A | NR |
Carl Dependahl
|
|
|
06/17/97 340 - PLEASE CALL DAVE REIMER AT ###-#### FOR ACCESS..NEED: COM BSMT. FIRESTOPPING THRU OUT, WRAP BEAMS, COLS ETC
|
INSP-Sprinkler Rough-in/Hydro | 6/16/1997 | 6/17/1997 | 6/17/1997 | A | PART |
Joe Tawney
|
|
|
06/17/97 406 - Before you go out or when you get there call ###-#### and TErry Nelson and he will come and pick you up. SPKLR ROUGH IN OK TO COVER
|
INSP - Carpentry | 6/5/1997 | 6/6/1997 | 6/6/1997 | P | PART |
Carl Dependahl
|
|
|
06/06/97 340 - PAUL ###-####..CHK'D BSMT 2HR WALL FRAMING; PART, NEED SP
|
INSP - Final | 5/18/1998 | 5/18/1998 | 5/18/1908 | A | FAIL |
Carl Dependahl
|
|
|
need eng'g letter (hazardous chemicals) per Floyd and Dan S.
|