Permit Information
Permit NumberBLD97-00401
StatusFinaled
Name HEWLETT PACKARD (BLDG. 6)
Site Address 11311 W CHINDEN BLVD
Project NameHP #6 - EAST/WEST
Customer Number 
ePlanReviewNo
Description
INKJET WAFER FAB AREA - To divide H.P. Building 6 into two buildings, East & West, with a 2-hour area separation wall. To create control areas within each building by use of one hour occupancy separation walls as well as between occupancies as listed in table 3-B. To remodel areas for use as an H-6 occupancy use, chemical storage areas and associated support facilities. Also to create manufacturing, office & assembly areas. The exterior mechanical exhaustsystem, smoke stacks & support structure on the South side of bldg are included in this permit. NOTE: This building is fully fire sprinklered. Structural elements through area separation wall as well as supporting structure are protected with two hour fire resistive, listed assemblies. All per approved plans, specs & attached plan review corrections. PC#081-97/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 6/4/19986/4/1998 DONE
Details
INSP - Final5/29/19986/3/19986/3/1998PPASS
DetailsCarl Dependahl
hp #6-dan hayes ###-####/ 2HR WALL FIRESTOPPED, HPM PIPING PROTECTED ACROSS COMPRESSOR ROOM & CORRIDOR TO H-6 BASEMENT; C/N OK,CARD TO CONTRACTOR FOR C/O
INSP - Final4/24/19984/24/19984/24/1998ANR
DetailsCarl Dependahl
NO INSP...CONF W/ TIM BASHFORD, KEEP C/N. CHK W/ FLOYD RE CHEMICAL ISSUES FOR OK OF HPM CORRIDOR.
INSP - Final3/13/19983/13/19983/13/1998ANR
DetailsCarl Dependahl
conf w/ dan hayes at hp, no insp
INSP - Framing/Rough-in2/11/19982/11/19982/11/1998PPART
DetailsCarl Dependahl
chk 2hr wall at chiller tank, if tank removed; wall redone??? TANK GONE, WALL REDONE; NEED FIRESTOP DETAILING
INSP - Conference2/4/19982/3/19982/3/1998PPASS
DetailsCarl Dependahl
W/ FLOYD; ALSO SPOKE W/ ERNIE HARPER RE STATUS OF JOB
INSP - Conference1/22/19981/22/19981/22/1998APASS
DetailsCarl Dependahl
W/ DAN STUART RE SUBMITTAL FROM ANDERSON CONST RE 1HR HPM PIPING ENCLOSURE...WILL MEET W/ CONT NEXT WEEK
INSP - Conference12/2/199712/2/199712/2/1997PPASS
DetailsCarl Dependahl
W/ FLOYD RE ALARM RESUBMITTAL
INSP - Carpentry11/7/199711/7/199711/7/1997APART
DetailsCarl Dependahl
FOLLOW UP OF CONF. W BRIAN PRICE 11-6-97; LEFT MSG W/ DAN HAYES AT SITE, WILL RECALL WHEN ALL RESUBMITTALS ARE IN. FLOYD REVIEWING CHEMICAL REPORT. SENT TO 316 IN ERROR 11-6-97.
INSP - Letter of compliance11/6/199711/6/199711/7/1997 CANC
DetailsJim Sly
11/06/97 316 - Gave to Carl D.
INSP - Conference11/6/199711/6/199711/6/1997PPASS
DetailsCarl Dependahl
W/ BRIAN PRICE, DANS. & FLOYD V. RE HP6; PROPOSAL TO PROTECT PIPING; STILL NEED CHEM. ANALYSIS & HPM SERVICE CORRIDOR RESOLUTION.
INSP - Conference11/5/199711/5/199711/5/1997APASS
DetailsCarl Dependahl
W/ BRIAN PRICE OF ANDERSON CONST. WILL COME IN 11-6-97 TO DISCUSS PROPOSAL.
INSP - Conference11/5/199711/5/199711/5/1997APASS
DetailsCarl Dependahl
TALKED TO BOB G. & DAN S. RE: RESUBMITTAL FOR HPM TUBING PROTECTION AT NON H6 OCC.
INSP - Conference10/28/199710/28/199710/28/1997APASS
DetailsCarl Dependahl
W/ DAN S. RE RESUBMITTAL HP 6
INSP - Conference10/28/199710/27/199710/27/1997PPASS
DetailsCarl Dependahl
REC'D RESUBMITTAL TO UPGRADE ALARM & DETECTION SYSTEM AT HP6; DISCUSSED W/ DAN HAYES OF ANDERSON/HP; GAVE COPY TO FLOYD FOR REVIEW
INSP - Conference10/24/199710/24/199710/24/1997PPASS
DetailsCarl Dependahl
W/ DAN S RE SUBMITTAL REC'D FOR 1 HR PROTECTION OF HPM PIPING...NEED BETTER DETAIL THAT MEETS CODE, PROVIDES RATING FOR ENTIRE ASSEMBLY PER DAN.
INSP - Final10/15/199710/16/199710/16/1997PFAIL
DetailsCarl Dependahl
hp6...KEEP C/N,STILL NEED APPROVED CHEM. ANALYSIS
INSP - Final10/13/199710/15/199710/14/1997PCANC
DetailsJim Sly
10/14/97 316 - bld 6 Gave to Carl D.
INSP - Conference10/14/199710/13/199710/13/1997PPASS
DetailsCarl Dependahl
W/ DAN HAYES OF ANDERSON CONST. RE FINAL REQ'S & PROPOSAL FOR SUBMITTALS.
INSP - Conference10/8/199710/8/199710/8/1997APASS
DetailsCarl Dependahl
W/ DAN HAYES, ANDERSON CONST/HP...TOLD TO HAVE ARCH SUBMIT DETAIL FOR PROTECTION OF HPM PIPING RATHER THAN APPROVE IN FIELD
INSP - Conference10/2/199710/1/199710/1/1997PPASS
DetailsCarl Dependahl
W/BRIAN PRICE OF ANDERSON CONST. CONT. TO BE OFF JOB SOON...NEED TO MAKE ARRANGEMENTS FOR FINAL; RESUBMITTALS AND RESOLUTION TO ITEMS NOTED IN INITIAL PLAN CHECK AND CORRECTIONS IS STILL REQ'D
INSP-Final Inspection9/29/19979/30/19979/30/1997APASS
DetailsJoe Tawney
09/30/97 406 - REINSP FOR FINAL OK FOR PERM OCC OR CERT OF COMPL
INSP - Conference9/29/19979/29/19979/29/1997PPASS
DetailsCarl Dependahl
W/ JOE TAWNEY RE FINAL FOR HP 6
INSP - Conference9/26/19979/26/19979/26/1997PPASS
DetailsCarl Dependahl
09/26/97 340 - CONT TO BE OFF JOB SOON, NO FINAL ISSUED; HPM ISSUES YET RESOLVED....NEED TO CONSULT G.S. OR?
INSP - Letter of compliance9/26/19979/26/19979/26/1997PCANC
DetailsCarl Dependahl
09/26/97 340 - CANC, NR FOR FINAL, KEEP C/N
INSP - Conference9/23/19979/23/19979/23/1997PPASS
DetailsCarl Dependahl
09/23/97 340 - HP 6; AWAITING RESOLUTION TO C/N, CHEM, COMPLETION OF STO DISPOSAL; NEED ALL FINAL SIGS.
INSP - Carpentry9/22/19979/22/19979/22/1997PPART
DetailsCarl Dependahl
09/22/97 340 - HP 6, FAB AREA/BSMT.
INSP - Carpentry9/18/19979/19/19979/19/1997PPART
DetailsCarl Dependahl
09/19/97 340 - RE FINAL FOR #6
INSP - Carpentry9/18/19979/19/19979/19/1997PPART
DetailsCarl Dependahl
09/19/97 340 -
INSP - Conference9/18/19979/18/19979/18/1997APASS
DetailsCarl Dependahl
CHK'D W/ DAN RE SUBMITTALS FOR FINAL ON BLDG 6 INK JET PROJECT; CHEM ANALYSIS, HPM SEPARATION, ETC.
INSP - Conference9/15/19979/11/19979/11/1997PPASS
DetailsCarl Dependahl
W/ FLOYD RE CHEM ANALYSIS, HPM CORR, BLDG 6; REJECT, KEEP CN
INSP - Carpentry9/3/19979/3/19979/4/1997PPART
DetailsCarl Dependahl
09/03/97 340 - BLDG 6; CHK C/N FOR FINAL...WIP,NEED REPORT ON CHEM ANALY PLAN CHK ITEMS
INSP - Carpentry8/28/19978/28/19978/28/1997 PART
DetailsCarl Dependahl
/ / 340 - walked job w/ andersen, chk'd wip for c/n on t/o
INSP - Carpentry8/25/19978/25/19978/25/1997PPART
DetailsCarl Dependahl
08/25/97 340 - IJ14, BLDG 6; WIP
INSP - Conference8/22/19978/22/19978/22/1997PPASS
DetailsCarl Dependahl
W/ DAN S. RE SILANE AREA; NEED MECH & ELEC TO CHECK OFF
INSP - Conference8/21/19978/21/19978/21/1997 PASS
DetailsCarl Dependahl
08/21/97 340 - W/ FLOYD VARLEY RE CHEM REPORT FOR HPM WASTES
INSP - Conference8/21/19978/21/19978/21/1997 PASS
DetailsCarl Dependahl
08/21/97 340 - W/ FLOYD VARLEY RE CHEM REPORT FOR HPM WASTES
INSP - Conference8/18/19978/18/19978/18/1997 PASS
DetailsCarl Dependahl
08/18/97 340 - W/DAN STUART RE T/O
INSP - Conference8/18/19978/18/19978/18/1997PPASS
DetailsCarl Dependahl
W/DAN STUART RE T/O
INSP - Final8/8/19978/8/19978/8/1997PFAIL
DetailsCarl Dependahl
recd letter from HP, issued c/n, ok for t/o, card to contractor at Cathy's desk. Copies of c/n & letter to Dan s.
INSP - Carpentry8/7/19978/7/19978/7/1997P
DetailsCarl Dependahl
###-#### Paul
INSP - Conference8/7/19978/7/19978/7/1997PPASS
DetailsCarl Dependahl
w/ MARK ELIOT, ARCH. WANTS TO ARRANGE CONF. W/ TIM H. HP, DAN S. ETC TO SEE ABOUT T/O...WILL HAVE TO FOLLOW UP ON REQUEST
INSP - Carpentry8/5/19978/6/19978/6/1997PPART
DetailsCarl Dependahl
###-#### fire penetration walls call the # if there are any questions
INSP - Conference8/5/19978/5/19978/5/1997PPASS
DetailsCarl Dependahl
08/05/97 340 - MET W/ PAUL, FOREMAN ANDERSON CO. REC'D LETTERS FROM HILT
INSP - Conference8/4/19978/4/19978/4/1997 PASS
DetailsCarl Dependahl
/ / 340 - BLD6 INK JET PROJ...KEEP CN; HPM CORR AT BSMT STILL UNDER RE
INSP - Conference8/1/19978/1/19978/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - REC'D INCOMPLETE SPEC INSP REPORT COMPOSITE FROM MTI; NEED C AT HP. SPOKE W/ DAVE OF I.S.I.
INSP - Final8/1/19978/1/19978/1/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON TRIP TEST OF DELUGE SYSTEM FOR SILANE BOTTLE COOLING
INSP - Conference7/29/19977/29/19977/29/1997 PASS
DetailsCarl Dependahl
07/29/97 340 - W/DAN, HP STAFF & ARCH; KEEP C/N , NEED RESUBMITTAL RE BS
INSP - Final7/29/19977/29/19977/29/1997 FAIL
DetailsJoe Tawney
/ / 406 - FINAL INSP OF DELUGE SYSTEM FOR SILANE STATION FAIL SOL VLV
INSP - Final7/29/19977/29/19977/29/1997PPART
DetailsJoe Tawney
/ / 406 - ALARM TEST ON GAS DETECTION SYSTEM PASS
INSP - Conference7/22/19977/22/19977/22/1997PPASS
DetailsCarl Dependahl
W/ DAN S. RE C/N'S & RESUBMITTAL
INSP - Carpentry7/21/19977/21/19977/21/1997PFAIL
DetailsCarl Dependahl
issued c/n; complete all control area walls, panic hdwe at main fl break room/ corridor. Need all spec insp reports & acceptance from MTI. Remove or seal pH adjust room non-rated dampers & firestop new plbg. Partial insp
INSP - Temporary occupancy7/18/19977/18/19977/18/1997PNR
DetailsCarl Dependahl
07/18/97 340 - BLDG 6, keep c/n, Dan S reviewing resub at bsmt hpm corr
INSP - Carpentry7/17/19977/17/19977/18/1997PFAIL
DetailsCarl Dependahl
07/17/97 340 - MEET ALAN 3 PM; KEEP C/N RE DOORS, FIRESTOPS, DAMPER AT C
INSP - Carpentry7/16/19977/16/19977/16/1997PFAIL
DetailsCarl Dependahl
C/N: DOORS, CORRIDORS,HVAC FINAL, FIRESTOPPING, ETC. NEED TO GET ALL SPEC INSP REPORTS, WALK CAT-WALKS, ENG'S OK FOR UNUSUAL FIRESTOPS
INSP - Final7/16/19977/16/19977/16/1997 PART
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR TEMP OCC
INSP - Carpentry7/15/19977/15/19977/15/1997PNR
DetailsCarl Dependahl
HP #6 EAST/... NEED FIRE / SAFETY & OTHER OKS....WANTS T/O, WILL REINSPECT AFTER OTHER OKS. SPOKE TO JOHN KERR W/ ANDERSON CONST
INSP-Final Inspection7/14/19977/15/19977/15/1997PFAIL
DetailsJoe Tawney
07/15/97 406 - 1:00 HP #6 FINAL FAIL ALARM SYSTEM DOORS IN EXIT CORRIDORS
INSP - Conference7/15/19977/14/19977/14/1997PPASS
DetailsCarl Dependahl
W/DAN STUART RE DOOR REQS
INSP - Carpentry7/10/19977/10/19977/10/1997PCANC
DetailsCarl Dependahl
w/ PAUL H. OF ANDERSON CONST. OFF ###-####, CEL ###-####
INSP - Carpentry7/10/19977/10/19977/10/1997PCANC
DetailsJim Sly
07/10/97 316 - Gave to Carl D.
INSP - Carpentry7/10/19977/10/19977/10/1997PPART
DetailsCarl Dependahl
07/10/97 340 - W PAUL OF ANDERSON ###-####, CEL 8502997, KEEP CN WIP
INSP - Carpentry7/8/19977/9/19977/10/1997ACANC
DetailsAlan Hauser
07/10/97 350 - ###-#### Paul in bld 6 this is for #340
INSP - Conference7/10/19977/8/19977/8/1997APASS
DetailsCarl Dependahl
re swo for silane area (bld97-1640)
INSP-Sprinkler Rough-in/Hydro7/3/19977/3/19977/3/1997PPART
DetailsJoe Tawney
07/03/97 406 - building 6 OK ON HYDRO TEST FOR PREACTION SYSTEM
INSP - Carpentry7/1/19977/1/19977/1/1997PFAIL
DetailsCarl Dependahl
07/01/97 340 - BUILDING 6 PAUL ###-####; REQ'D REPAIR & BOX INSTALL PER
INSP - Carpentry6/30/19976/30/19976/30/1997PPART
DetailsCarl Dependahl
06/30/97 340 - Paul ###-#### ì
INSP-Sprinkler Rough-in/Hydro6/27/19976/27/19976/27/1997PPART
DetailsJoe Tawney
BLDG #6 TERRY NELSON - ###-####- CALL & THE OFFICE WILL PAGE HIM WITH THE TIME OF MEETING OK ON HYDRO TEST FOR BLDG #6
INSP - Conference6/25/19976/25/19976/25/1997 PASS
W/ DAN STUART RE SWO IN RELATION TO REST OF BLDG...SWO ON PENDING BLD97-1640 ONLY (SILANE SHED)
INSP - Conference6/19/19976/23/19976/23/1997APASS
DetailsAlan Hauser
06/23/97 350 - MEET W/ JOE, CARL, & HP AT BLDG 6 went through new fab. facility in bld. #6, with struct. and plan review
INSP - Conference6/19/19976/23/19976/23/1997APASS
DetailsCarl Dependahl
06/23/97 340 - TAKE DAN S...MEET W/ JOE, ALAN, HP BLDG 6. REQUESTED RESU CORR ADDED AT BSMT
INSP - Conference6/19/19976/23/19976/23/1997APASS
DetailsJoe Tawney
06/23/97 406 - CONF./ INSP. WITH CARL, DAN STUART, ALAN HAUSER AT HP BLD PERFORMED WALK THRU OF CONSTRUCTION AREA
INSP - Framing/Rough-in6/23/19976/23/19976/23/1997 FAIL
DetailsCarl Dependahl
/ / 340 - C/N; FIRESTOPS, WALL CONST, DOOR INSTALL, SPEC INSP REPORTS
INSP-Sprinkler Rough-in/Hydro6/23/19976/23/19976/23/1997PPART
DetailsJoe Tawney
06/23/97 406 - TERRY NELSON (OFFICE ###-####). CALL OFFICE & THEY WILL P MEET YOU AT SPECIFIED TIME.... BLDG.#6. ROUGH IN OK TO COVER
INSP - Conference6/19/19976/19/19976/19/1997APASS
DetailsCarl Dependahl
W/ DAN S. JOE TAWNEY & ALAN HAUSER TO ARRANGE GROUP CONF/ INSP AT BLDG 6 MON. 6-23
INSP - Conference6/17/19976/17/19976/17/1997 PASS
DetailsCarl Dependahl
/ / 340 - MET W/ ARCH AT SITE; ASKED FOR SUBMITTAL FOR FIREPROOFING CH
INSP - Framing/Rough-in6/16/19976/17/19976/17/1997ANR
DetailsCarl Dependahl
06/17/97 340 - PLEASE CALL DAVE REIMER AT ###-#### FOR ACCESS..NEED: COM BSMT. FIRESTOPPING THRU OUT, WRAP BEAMS, COLS ETC
INSP-Sprinkler Rough-in/Hydro6/16/19976/17/19976/17/1997APART
DetailsJoe Tawney
06/17/97 406 - Before you go out or when you get there call ###-#### and TErry Nelson and he will come and pick you up. SPKLR ROUGH IN OK TO COVER
INSP - Carpentry6/5/19976/6/19976/6/1997PPART
DetailsCarl Dependahl
06/06/97 340 - PAUL ###-####..CHK'D BSMT 2HR WALL FRAMING; PART, NEED SP
INSP - Final5/18/19985/18/19985/18/1908AFAIL
DetailsCarl Dependahl
need eng'g letter (hazardous chemicals) per Floyd and Dan S.