INSP - Final | 9/18/1997 | 9/19/1997 | 9/19/1997 | P | PASS |
|
|
|
09/19/97 338 - made ok signed final col of the occreq card //copy of sam office
|
INSP-Final Inspection | 9/18/1997 | 9/19/1997 | 9/19/1997 | A | PASS |
Joe Tawney
|
|
|
09/19/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
Permanent Occupancy | | 9/19/1997 | 9/19/1997 | | DONE |
|
|
|
|
INSP - Final | 9/12/1997 | 9/15/1997 | 9/15/1997 | P | PART |
|
|
|
09/15/97 338 - other agencies ok for the temp col of the 0
|
INSP-Final Inspection | 9/11/1997 | 9/12/1997 | 9/12/1997 | A | PART |
Joe Tawney
|
|
|
09/12/97 406 - FINAL OK FOR TEMP OCC PULL STATION & HORN/STROBE CURB S
|
INSP-Sprinkler Rough-in/Hydro | 8/27/1997 | 8/27/1997 | 8/27/1997 | P | PART |
Joe Tawney
|
|
|
08/27/97 406 - said 1:00 and 2:00 OK ON HYDRO TESTS FOR WET AND DRY SYSTEMS
|
INSP-Supply line flush | 8/26/1997 | 8/26/1997 | 8/26/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Ceiling grid | 8/14/1997 | 8/15/1997 | 8/15/1997 | A | PASS |
|
|
|
08/15/97 338 - made ok to drop tiles
|
INSP - Framing/Rough-in | 7/21/1997 | 7/22/1997 | 7/22/1997 | A | PASS |
|
|
|
07/22/97 338 - made ok
|
INSP - Framing/Rough-in | 7/8/1997 | 7/8/1997 | 7/8/1997 | P | PART |
|
|
|
07/08/97 338 - ok to cover the walls only with the ele insp approval
|
INSP - Conference | 6/25/1997 | 6/25/1997 | 6/25/1997 | | PASS |
|
|
|
/ / 338 - CONTR WILL CALL IF THEY GET READY IN THE PM
|
INSP - Framing/Rough-in | 6/25/1997 | 6/25/1997 | 6/25/1997 | | PART |
|
|
|
/ / 338 - made ok for the lab section only
|
INSP - Framing/Rough-in | 6/24/1997 | 6/25/1997 | 6/25/1997 | P | NR |
|
|
|
06/25/97 338 - not ready
|
INSP-Sprinkler Rough-in/Hydro | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PART |
Joe Tawney
|
|
|
06/23/97 406 - SUPT IS BOB, ATTIC DRY SYSTEM FOR COVER ROUGH IN OF PART OF DRY SYSTEM IN ATTIC AREA OK TO COVER
|
INSP - Carpentry | 6/13/1997 | 6/13/1997 | 6/13/1997 | | PASS |
|
|
|
/ / 338 - check the shear nailing
|
INSP - Carpentry | 6/13/1997 | 6/13/1997 | 6/13/1997 | P | NH |
|
|
|
06/13/97 338 - out of time will do 6/17/97
|
INSP - Conference | 6/6/1997 | 6/6/1997 | 6/6/1997 | P | PASS |
|
|
|
06/06/97 338 - madeok questions on the tunnel assy for the small corrido
|
INSP - Flatwork | 5/12/1997 | 5/12/1997 | 5/12/1997 | P | PASS |
Jim Storey
|
|
|
05/12/97 301 - slab ok covered by si
|
INSP - Footings | 5/8/1997 | 5/9/1997 | 5/9/1997 | A | PASS |
Jim Storey
|
|
|
05/09/97 301 - LATE AM FTG -OK FOOTING
|
INSP - Foundation | 4/24/1997 | 4/25/1997 | 4/25/1997 | A | PART |
|
|
|
04/25/97 338 - wall inspection partial sofit framing will call for 4/28
|
INSP - Footings | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PASS |
|
|
|
04/23/97 338 - sp insp ok r-bar placed FTG -OK FOOTING
|