Permit Information
Permit NumberBLD97-00409
StatusExpired
Name BOB HOWARD
Site Address 8653 W HACKAMORE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
STRATA/VICTORY * TO CONSTRUCT A NEW, ONE-STORY, 14,878 S.F., VN WOOD FRAMED GEOTECHNICAL ENGINEERING OFFICE WITH MATERIAL TESTING AREA. BUILDING WILL BE FULLY FIRE SPRINKLERED (FOR AREA). OTHER WORK INLCUDES RELATED SITE WORK, PARKING LOT, LANDSCAPING AND TRASH ENCLOSURE PER APPROVED PLANS AND ATTACHMENTS AND DR#9-97, PC#084-97.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/18/19979/19/19979/19/1997PPASS
Details
09/19/97 338 - made ok signed final col of the occreq card //copy of sam office
INSP-Final Inspection9/18/19979/19/19979/19/1997APASS
DetailsJoe Tawney
09/19/97 406 - REINSP FOR FINAL OK FOR PERM OCC
Permanent Occupancy 9/19/19979/19/1997 DONE
Details
INSP - Final9/12/19979/15/19979/15/1997PPART
Details
09/15/97 338 - other agencies ok for the temp col of the 0
INSP-Final Inspection9/11/19979/12/19979/12/1997APART
DetailsJoe Tawney
09/12/97 406 - FINAL OK FOR TEMP OCC PULL STATION & HORN/STROBE CURB S
INSP-Sprinkler Rough-in/Hydro8/27/19978/27/19978/27/1997PPART
DetailsJoe Tawney
08/27/97 406 - said 1:00 and 2:00 OK ON HYDRO TESTS FOR WET AND DRY SYSTEMS
INSP-Supply line flush8/26/19978/26/19978/26/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Ceiling grid8/14/19978/15/19978/15/1997APASS
Details
08/15/97 338 - made ok to drop tiles
INSP - Framing/Rough-in7/21/19977/22/19977/22/1997APASS
Details
07/22/97 338 - made ok
INSP - Framing/Rough-in7/8/19977/8/19977/8/1997PPART
Details
07/08/97 338 - ok to cover the walls only with the ele insp approval
INSP - Conference6/25/19976/25/19976/25/1997 PASS
Details
/ / 338 - CONTR WILL CALL IF THEY GET READY IN THE PM
INSP - Framing/Rough-in6/25/19976/25/19976/25/1997 PART
Details
/ / 338 - made ok for the lab section only
INSP - Framing/Rough-in6/24/19976/25/19976/25/1997PNR
Details
06/25/97 338 - not ready
INSP-Sprinkler Rough-in/Hydro6/23/19976/23/19976/23/1997PPART
DetailsJoe Tawney
06/23/97 406 - SUPT IS BOB, ATTIC DRY SYSTEM FOR COVER ROUGH IN OF PART OF DRY SYSTEM IN ATTIC AREA OK TO COVER
INSP - Carpentry6/13/19976/13/19976/13/1997 PASS
Details
/ / 338 - check the shear nailing
INSP - Carpentry6/13/19976/13/19976/13/1997PNH
Details
06/13/97 338 - out of time will do 6/17/97
INSP - Conference6/6/19976/6/19976/6/1997PPASS
Details
06/06/97 338 - madeok questions on the tunnel assy for the small corrido
INSP - Flatwork5/12/19975/12/19975/12/1997PPASS
DetailsJim Storey
05/12/97 301 - slab ok covered by si
INSP - Footings5/8/19975/9/19975/9/1997APASS
DetailsJim Storey
05/09/97 301 - LATE AM FTG -OK FOOTING
INSP - Foundation4/24/19974/25/19974/25/1997APART
Details
04/25/97 338 - wall inspection partial sofit framing will call for 4/28
INSP - Footings4/22/19974/23/19974/23/1997PPASS
Details
04/23/97 338 - sp insp ok r-bar placed FTG -OK FOOTING