Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD97-00413
StatusFinaled
Name ORION DEVELOPMENT
Site Address 8880 W BARNES ST
Project NameOFFICE BUILDING
Customer Number 
ePlanReviewNo
Description
ORION DEVELOPMENT * TO CONSTRUCT A NEW SINGLE STORY, WOOD FRAMED TYPE V-NONRATED 5080 SQ.FT.OFFICE BUILDING AND STORAGE/STOCK ROOM. THE OFFICE AREA IS APPROXIMATELY 3964 SQ.FT. THE STORAGE AREA IS APPROXIMATELY 936 SQ.FT. WITH A 180 SQ.FT. COVERED ENTRY. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST CABO/ANSI STANDARDS A-117.1, AND THE 1994 EDITION OF THE UBC. THIS PERMIT INCLUDES THE RELATED SITE IMPROVEMENTS. MJP (PC# 090-97) DR-85-96,
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Conference8/28/19978/28/19978/28/1997APASS
DetailsJack Frank
signed off perm. occupancy data system installer made corrections jf ok
Permanent Occupancy 8/28/19978/28/1997 DONE
Details
Permanent Occupancy 8/28/19978/28/1997 DONE
Details
INSP - Final8/21/19978/22/19978/22/1997PPART
Details
08/22/97 338 - signed the temp col of the occ req card followed ele.
INSP-Final Inspection8/22/19978/22/19978/22/1997PPASS
DetailsJoe Tawney
08/22/97 406 - REINSP FOR FINAL OK FOR PERM OCC
INSP - Final8/19/19978/19/19978/19/1997 PART
DetailsJoe Tawney
/ / 406 - REISNP FOR FINAL OK FOR TEMP OCC 2 EMERG LIGHTS NOT YET INS
INSP-Final Inspection8/19/19978/19/19978/19/1997PNR
DetailsJoe Tawney
08/19/97 406 - REINSP FOR FINAL NOT READY
INSP - Final8/18/19978/18/19978/18/1997 FAIL
DetailsJoe Tawney
/ / 406 - FINAL FAIL FIRE EXT TAGS EMERGENCY LIGHTS
INSP - Final8/18/19978/18/19978/18/1997 FAIL
Details
08/18/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED
INSP - Final8/18/19978/18/19978/18/1997 FAIL
Details
08/18/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED
INSP - Ceiling grid7/15/19977/16/19977/17/1997ACANC
Details
07/16/97 338 - done by 342
INSP - Ceiling grid7/16/19977/16/19977/16/1997PPASS
DetailsWes Worcester
INSP - Ceiling grid7/10/19977/11/19977/11/1997ANR
DetailsTom Arcoraci
INSP - Conference6/16/19976/16/19976/16/1997 PASS
Details
/ / 338 - ok to use drywall screws in place of nails on rated wall con
INSP - Framing/Rough-in6/16/19976/16/19976/16/1997PNH
Details
06/16/97 338 - out of time will do tomorrow am
INSP - Framing/Rough-in6/16/19976/16/19976/16/1997 PASS
Details
/ / 338 - FRAM-OK FRAMING
INSP - Framing/Rough-in6/12/19976/13/19976/13/1997PCANC
Details
06/13/97 338 - done by 301
INSP - Energy code compliance6/12/19976/13/19976/12/1997ANH
Details
06/13/97 338 - not necessary with com building
INSP - Framing/Rough-in6/5/19976/5/19976/5/1997PPASS
Details
06/05/97 338 - ok for the exterior sheathing only
INSP - Framing/ Rough-in5/30/19975/30/19975/30/1997 PART
Details
/ / 338 - ok to drywall the bottom of the trusses only
INSP - Framing/Rough-in5/30/19975/30/19975/30/1997PCANC
Details
05/30/97 338 - cancelled till #1 monday a.m.
INSP - Framing/Rough-in5/28/19975/28/19975/28/1997PPASS
Details
05/28/97 338 - carpentry
INSP - Conference5/15/19975/15/19975/15/1997 PASS
Details
/ / 338 - q,s on the engineered changes for strap sizing etc all are t approved by me 1:00/2:30 pm
INSP - Foundation5/2/19975/2/19975/2/1997 PART
DetailsCarl Dependahl
/ / 340 - ENG'G SHOWS 2500 PSI CONC, NO SPEC INSP. OK
INSP - Masonry5/1/19975/2/19975/2/1997APART
DetailsCarl Dependahl
05/02/97 340 - CONCRETE WALL ì
INSP - Conference5/1/19975/1/19975/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - QUICK STRUCT CONF W/ SUPT. CHK FRAME DETAILS
INSP - Conference5/1/19975/1/19975/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - QUICK STRUCT CONF W/ SUPT. CHK FRAME DETAILS
INSP - Conference5/1/19975/1/19975/1/1997 PASS
DetailsCarl Dependahl
/ / 340 - NR TIL 2PM
INSP - Footings4/30/19975/1/19975/1/1997APASS
DetailsCarl Dependahl
05/01/97 340 - OK, STEEL TIED