Permit Information
Permit NumberBLD97-00494
StatusFinaled
Name HEWLETT PACKARD (BLDG #6)
Site Address 11311 CHINDEN BLVD
Project NameHP #6 - CHILLER ENCLS
Customer Number 
ePlanReviewNo
Description
To construct a 4,680 sq.ft. chiller enclosure which will include a pump room that will house mechanical and electrical equipment per approved plans on file. To demolish chiller units & associated equipment within the basement of building #6. Separate electrical & mechanical permits required. Per approved plans. APPROVAL BY FIRE DEPARTMENT REQUIRED AS CONDITION OF FINAL INSPECTION AND LETTER OF COMPLETION. PC#110-97/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final1/7/19991/7/19991/7/1999PPASS
DetailsCarl Dependahl
change status to "D"...insp notes show final ok.
INSP - Footings6/17/19976/18/19966/18/1998PCANC
DetailsCarl Dependahl
FOOTING REBAR
INSP - Final2/20/19982/19/19982/19/1998PPASS
DetailsCarl Dependahl
CONF W/ CATHY RE L/C ONLY
INSP - Final2/9/19982/11/19982/11/1998PPART
DetailsCarl Dependahl
EARLY PM 2:30 CALL ED HESS ###-#### OR ###-####1 STRUCT OK; CARD TO ED HESS
INSP - Final2/6/19982/9/19982/9/1998ACANC
DetailsCarl Dependahl
CALL ED ###-#### OR ###-#### TO MEET YOU--BLDG 6 resched per ed
INSP - Conference2/6/19982/6/19982/6/1998APASS
DetailsCarl Dependahl
re final insps, told to call office.
INSP - Carpentry2/4/19982/4/19982/4/1998PPART
DetailsCarl Dependahl
OK PER JOE
INSP - Conference2/3/19982/3/19982/3/1998APASS
DetailsCarl Dependahl
W/ ERNIE HARPER RE FINAL INSP & TAWNEYS C/N...TOLD TO RECALL WHEN ALL SIGNATURES VERIFIED
INSP - Final2/3/19982/3/19982/3/1998PNR
DetailsCarl Dependahl
BLDG 6--ERNIE SAID HE TALKED TO YOU ABOUT THIS--###-#### OR ###-####--PLEASE CALL HIM FIRST
INSP - Final2/3/19982/3/19982/3/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP FOR FINAL OK FOR CERT OF COMPL
INSP - Conference10/29/199710/29/199710/29/1997PPASS
DetailsCarl Dependahl
W/ MTI RE NON CONFORMING REPORTS
INSP - Conference10/28/199710/28/199710/28/1997PPASS
DetailsCarl Dependahl
W/ SLY; HE REC'D FINAL SPEC. INSP REPORT...WILL FORWARD TO ME.
INSP - Conference10/14/199710/14/199710/14/1997PPASS
DetailsCarl Dependahl
W/ JOE TAWNEY RE FINAL FOR CHILLER....NEED I.D. LABELS ON PRESS. & VALVES FOR CHILLER. PROPERLY SUPPORT VALVES.
INSP - Final10/8/199710/10/199710/10/1997PNR
DetailsCarl Dependahl
HP 6, CHILLER...need fire ok
INSP - Framing/Rough-in10/13/199710/10/199710/10/1997PPASS
DetailsCarl Dependahl
INSP - Carpentry10/9/199710/9/199710/9/1997PPART
DetailsCarl Dependahl
HP 6 CHILLER BLDG
INSP - Final10/8/199710/9/199710/9/1997PFAIL
DetailsJoe Tawney
10/09/97 406 - HP 6, CHILLER BLDG; JULIO OF K2 WILL CONTACT YOU FINAL FAIL FIRE EXT SUPPORT OF STOP VLVS LABELING OF VLVS
INSP - Conference9/26/19979/26/19979/26/1997PPASS
DetailsCarl Dependahl
09/26/97 340 - CON JULIO
INSP - Carpentry9/22/19979/22/19979/22/1997PPART
DetailsCarl Dependahl
09/22/97 340 - INK JET PROJ. CHILLER.
INSP - Carpentry9/18/19979/19/19979/19/1997PPART
DetailsCarl Dependahl
09/19/97 340 - W/JULIO, K2
INSP - Conference9/18/19979/18/19979/18/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ JULIO RE CHILLER PROJECT.
INSP - Carpentry7/29/19977/29/19977/29/1997 PART
DetailsCarl Dependahl
07/29/97 340 - BLDG 6 CHILLERPENDING SPEC INSP REPORTS
INSP - Masonry7/18/19977/21/19977/21/1997ACANC
DetailsJim Sly
07/18/97 316 - Gave To Carl D.
INSP - Masonry7/18/19977/18/19977/18/1997PPART
DetailsCarl Dependahl
07/18/97 340 - SENT TO SLY IN ERROR, ADDED BY 340 ..SPEC INSP REPORT PEN
INSP - Masonry7/14/19977/18/19977/18/1997PCANC
DetailsJim Sly
07/17/97 316 - Gave to Carl D.
INSP - Conference7/16/19977/16/19977/16/1997PPASS
DetailsCarl Dependahl
W/ JULIO OF K2 RE SPEC INSP REPORTS
INSP - Masonry7/14/19977/16/19977/16/1997PCANC
DetailsJim Sly
07/16/97 316 - Gave to Carl D.
INSP - Masonry7/10/19977/14/19977/14/1997APART
DetailsCarl Dependahl
07/14/97 340 - looks ok, pending spec insp report
INSP - Masonry7/9/19977/9/19977/9/1997PPART
DetailsCarl Dependahl
07/09/97 340 - ###-#### digital pager Julio HP; PENDING SPEC INSP, MET W
INSP - Conference7/8/19977/8/19977/8/1997 PASS
DetailsCarl Dependahl
/ / 340 - bldg 6 chiller w/ K-2, Julio
INSP - Framing/Rough-in7/1/19977/2/19977/2/1997PPART
DetailsCarl Dependahl
07/02/97 340 - RE-BAR BLD 6 SLAB; PEND SPEC INSP REPORT
INSP - Footings7/1/19977/1/19977/1/1997PPART
DetailsCarl Dependahl
07/01/97 340 - RE-BAR CHILLER. BLD 6 SOUTH SIDE; PART, PENDING SPEC INSP
INSP - Footings6/25/19976/26/19976/26/1997PCANC
DetailsTom Arcoraci
WALL
INSP - Footings6/24/19976/25/19976/25/1997PPART
DetailsCarl Dependahl
06/25/97 340 - REBAR SOUTH SIDE OF BLDG 6
INSP - Foundation6/24/19976/25/19976/25/1997PPART
DetailsCarl Dependahl
06/25/97 340 - pend spec insp report
INSP - Foundation6/24/19976/24/19976/24/1997APART
DetailsCarl Dependahl
CHILLER FND; PENDING SPEC INSP REPORT
INSP - Foundation6/18/19976/20/19976/20/1997APART
DetailsCarl Dependahl
06/20/97 340 - FND.WALL EARLY A.M.... pend spec insp
INSP - Foundation6/19/19976/20/19976/20/1997APART
DetailsCarl Dependahl
06/20/97 340 - pend spec insp
INSP - Conference6/19/19976/19/19976/19/1997APASS
DetailsCarl Dependahl
W/ JULIO OF K-2; RE SPEC INSP.REQ'S...I'D BEEN AT SITE 6-17 & MISSED HIM...WORK APPEARED OK
INSP - Foundation6/17/19976/17/19976/17/1997PPART
DetailsCarl Dependahl
06/17/97 340 - FND. WALL REBAR; PENDING SPEC INSP, LOOKS OK
INSP - Foundation6/17/19976/17/19976/17/1997PPART
DetailsCarl Dependahl
06/17/97 340 - FND WALL REBAR ...FTG NO. & WEST; PENDING SPEC INSP REPOR
INSP - Foundation6/17/19976/18/19966/17/1997P
DetailsJim Sly
FND. REBAR
INSP - Footings6/16/19976/16/19976/16/1997PCANC
DetailsJim Sly
06/16/97 316 - Gave to Carl D...