Permanent Occupancy | | 1/15/1998 | 1/15/1998 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/15/1998 | 1/15/1998 | | DONE |
|
|
|
|
INSP - Final | 1/12/1998 | 1/12/1998 | 1/12/1998 | A | PASS |
|
|
|
signed the perm col on the occ req card
|
INSP-Final Inspection | 9/23/1997 | 9/24/1997 | 9/24/1997 | A | CANC |
Rick Jackson
|
|
|
they will reschedule, they were at funeral
|
INSP-Final Inspection | 9/22/1997 | 9/22/1997 | 9/22/1997 | P | CANC |
Joe Tawney
|
|
|
09/22/97 406 - call brian with mcalvain INSP CANCELLED BY CONTR PER TELECON WITH NATALIE
|
INSP - Final | 8/15/1997 | 8/15/1997 | 8/15/1997 | | PART |
|
|
|
/ / 338 - signed the temp col
|
INSP - Final | 8/15/1997 | 8/15/1997 | 8/15/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR TEMP OCC ALARM SYSTEM CURB STRIPING RISER CLEAR
|
INSP-Sprinkler Rough-in/Hydro | 8/13/1997 | 8/13/1997 | 8/13/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST OF WET PIPE SYSTEM
|
INSP-Supply line flush | 8/12/1997 | 8/12/1997 | 8/12/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 8/11/1997 | 8/11/1997 | 8/11/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN
|
INSP - Framing/Rough-in | 7/16/1997 | 7/17/1997 | 7/17/1997 | A | PART |
|
|
|
07/17/97 338 - interior studs. late a.m. ok to cover with the ele and p attachments of met5al stud framing ok per the approved plan on file
|
INSP - Carpentry | 7/9/1997 | 7/10/1997 | 7/10/1997 | P | PART |
|
|
|
07/10/97 338 - ROOF NAILING INSPECTION roof deck ok still need 4 point c 5/8 studs
|
INSP - Framing/Rough-in | 7/2/1997 | 7/2/1997 | 7/2/1997 | A | |
|
|
|
active service
|
INSP - Footings | 5/19/1997 | 5/19/1997 | 5/19/1997 | P | PART |
|
|
|
05/20/97 333 - part
|