Permanent Occupancy | | 11/17/1998 | 11/17/1998 | | DONE |
|
|
|
|
INSP - Final | 11/16/1998 | 11/16/1998 | 11/16/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 10/29/1998 | 10/29/1998 | 10/29/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL ALARM PACKAGE MED GAS PAPERWORK PER NFPA 99
|
INSP - Occup. violation notice | 10/12/1998 | 10/12/1998 | 10/12/1998 | | PART |
|
|
|
/ / 338 - TO KREISENBECK OFF IC TRAILER AT THE CECIL WILL EXPE DITE
|
INSP - Carpentry | 11/19/1997 | 11/20/1997 | 11/20/1997 | A | PART |
|
|
|
for the 2-hour assy at the underside of the floor drains at the 4th floor sinks
|
INSP - Final | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | PART |
|
|
|
11/06/97 333 - temp ok
|
INSP - Final | 11/6/1997 | 11/6/1997 | 11/6/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR TEMP OCC ALARM SUBMITTAL MED GAS PAP RM
|
INSP-Final Inspection | 11/3/1997 | 11/4/1997 | 11/4/1997 | P | FAIL |
Joe Tawney
|
|
|
11/04/97 406 - FINAL NOT COMPLETED RESUME 11/5/97
|
INSP-Final Inspection | 10/28/1997 | 10/30/1997 | 10/30/1997 | P | NR |
Joe Tawney
|
|
|
10/30/97 406 - FINAL NOT READY DIG DIALER NOT INSTALLED
|
INSP - Framing/Rough-in | 10/17/1997 | 10/20/1997 | 10/20/1997 | A | PART |
|
|
|
REINSPECTION, FIRE PENETRATION verbal corrections put down on the pre lim punch list.
|
INSP - Framing/Rough-in | 10/8/1997 | 10/9/1997 | 10/9/1997 | A | PART |
|
|
|
10/09/97 338 - partial made ok c/n issued
|
INSP - Framing/Rough-in | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
|
|
|
08/26/97 338 - OUT OF TIME WILL DO 08-27-97 EARLY AS POSSIBLE
|
INSP - Conference | 8/11/1997 | 8/11/1997 | 8/11/1997 | | PASS |
|
|
|
/ / 338 - MADE OK ACCEPTED THE RESUBMITTAL FOR FIRE PROTECTION DETAIL
|
INSP - Conference | 8/11/1997 | 8/11/1997 | 8/11/1997 | P | CANC |
|
|
|
08/11/97 338 - out of time will do #1 tom
|
INSP - Resubmittals | 8/11/1997 | 8/11/1997 | 8/11/1997 | | PASS |
|
|
|
/ / 338 - MADE OK FOR TH E2-HOUR PENETRATION AT THE MEDICAL GAS VALVES
|
INSP - Conference | 8/6/1997 | 8/7/1997 | 8/7/1997 | A | FAIL |
|
|
|
08/06/97 338 - 2-hr walls penes not acceptable
|
INSP - Framing/Rough-in | 8/4/1997 | 8/5/1997 | 8/5/1997 | A | PASS |
|
|
|
08/05/97 338 - south end f/ pene ok
|
INSP - Resubmittals | 8/5/1997 | 8/5/1997 | 8/5/1997 | | PASS |
|
|
|
/ / 338 - approved assy that matches the as built on the top of the ra
|
INSP - Conference | 7/31/1997 | 8/4/1997 | 8/4/1997 | A | CANC |
Russ Owen
|
|
|
08/04/97 407 - as you requested/one of the sweet ladies. will re-schedual with pery.
|
INSP - Conference | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | CANC |
|
|
|
07/31/97 338 - cancelled till next week
|
INSP - Framing/Rough-in | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | PART |
|
|
|
07/31/97 338 - 4th floorthrough pennetration fire stops
|
INSP - Framing/Rough-in | 7/29/1997 | 7/30/1997 | 7/30/1997 | A | PART |
|
|
|
07/30/97 338 - misc framing on th enew 4th floor south 1/4 of the structure
|