INSP - Final | 6/3/1998 | 6/4/1998 | 6/4/1998 | A | PASS |
|
|
|
06/04/98 338 - made ok will sign card a t the office
|
Permanent Occupancy | | 6/4/1998 | 6/4/1998 | | DONE |
|
|
|
|
INSP - Final | 5/7/1998 | 5/7/1998 | 5/7/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 3/19/1998 | 3/19/1998 | 3/19/1998 | | PART |
|
|
|
/ / 338 - made ok for temp c/n issued mark aat 8630507
|
INSP-Conference | 3/19/1998 | 3/19/1998 | 3/19/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF ON ALARM SYSTEM WITH HAROLD OF MOUNTAIN POWER
|
INSP - Final | 3/18/1998 | 3/18/1998 | 3/18/1998 | P | NR |
|
|
|
03/18/98 338 - moved insp to tomorrow out of time no one on jobsite for
|
INSP - Final | 3/10/1998 | 3/11/1998 | 3/11/1998 | P | NR |
|
|
|
03/11/98 338 - Scheduled by Hello!. OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 3/10/1998 | 3/11/1998 | 3/11/1998 | P | FAIL |
Joe Tawney
|
|
|
03/11/98 406 - bill ###-#### FINAL FOR TEMP ON NEW ADDITION FAIL SMOKE SEAL LANDING DOOR SIGN
|
INSP - Framing/Rough-in | 2/9/1998 | 2/9/1998 | 2/9/1998 | P | PART |
|
|
|
02/09/98 338 - markus ###-#### drop ceiling ok to drop in tiles need to at the sprinkler drops
|
INSP-Sprinkler Rough-in/Hydro | 2/2/1998 | 2/2/1998 | 2/2/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN OF AREA BELOW GRID & OK ON HYDRO TEST N
|
INSP - Energy code compliance | 12/30/1997 | 12/31/1997 | 12/31/1997 | A | CANC |
|
|
|
not needed not required
|
INSP - Framing/Rough-in | 12/23/1997 | 12/23/1997 | 12/24/1997 | P | NH |
|
|
|
12/24/97 338 - LIFE CARE CENTER no ACCESS
|
INSP - Wall cover | 12/8/1997 | 12/9/1997 | 12/9/1997 | A | PART |
|
|
|
12/09/97 338 - sent to 408
|
INSP - Wall cover | 12/5/1997 | 12/5/1997 | 12/8/1997 | P | NR |
|
|
|
12/05/97 338 - LIFE CARE CENTER
|
INSP - Framing/Rough-in | 12/3/1997 | 12/3/1997 | 12/4/1997 | P | CANC |
|
|
|
12/04/97 338 - sent to 301
|
INSP - Framing/Rough-in | 12/2/1997 | 12/3/1997 | 12/4/1997 | A | PASS |
|
|
|
12/03/97 338 - made ok for the conference on the 2-hour wall
|
INSP - Framing/Rough-in | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | CANC |
|
|
|
12/01/97 338 - canc given to 342
|
INSP - Framing/Rough-in | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | NR |
Wes Worcester
|
|
|
no other signatures and 2 hr wall is wrong....need detailed fix and do not cover
|
INSP - Roof | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | PART |
|
|
|
11/18/97 333 - renail ok
|
INSP - Roof | 11/17/1997 | 11/17/1997 | 11/17/1997 | P | PART |
|
|
|
ROOF SHEATHING in progress
|
INSP - Foundation | 10/24/1997 | 10/24/1997 | 10/24/1997 | P | PASS |
|
|
|
r-bar placed ok to pour
|
INSP - Footings | 10/22/1997 | 10/23/1997 | 10/22/1997 | A | PASS |
|
|
|
made ok the r-bar is placed
|