INSP - Final | 7/21/1998 | 7/21/1998 | 7/21/1998 | P | PASS |
|
|
|
FINALED AS PER 338/LC ISSUED BY PERRY
|
INSP - Final | 6/22/1998 | 6/22/1998 | 6/22/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP - Final | 5/11/1998 | 5/11/1998 | 5/11/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR TEMP
|
INSP - Temporary occupancy | 5/11/1998 | 5/11/1998 | 5/11/1998 | | PASS |
|
|
|
/ / 338 - MADE OK OTHER SIGNOFFS OK
|
INSP-Final Inspection | 5/6/1998 | 5/8/1998 | 5/8/1998 | A | FAIL |
Joe Tawney
|
|
|
05/08/98 406 - ###-#### FINAL SHELL FAIL ALARM SYSTEM
|
INSP-Sprinkler Rough-in/Hydro | 10/23/1997 | 10/23/1997 | 10/23/1997 | P | PART |
Joe Tawney
|
|
|
10/23/97 406 - PUMPED UP OK ON HYDRO TEST OF FDC PIPING
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1997 | 10/22/1997 | 10/23/1997 | P | PART |
Joe Tawney
|
|
|
10/22/97 406 - OK ON HYDRO TEST EXCEPT FOR FDC PIPING
|
INSP-Supply line flush | 10/20/1997 | 10/20/1997 | 10/20/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - 0K ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 9/30/1997 | 10/1/1997 | 10/1/1997 | A | PART |
|
|
|
10/01/97 338 - c/n issued ok to start cover
|
INSP - Framing/Rough-in | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PART |
|
|
|
08/26/97 338 - ROOF NAILING ONLY MADE OK
|
INSP - Framing/Rough-in | 8/20/1997 | 8/20/1997 | 8/20/1997 | | CANC |
|
|
|
08/20/97 338 - perimeter roof sheathing ok ok to install crickets
|
INSP - Foundation | 7/9/1997 | 7/9/1997 | 7/9/1997 | P | PASS |
|
|
|
07/10/97 338 - MADE OK WITH SP INSP APPROVAL
|
INSP - Footings | 7/8/1997 | 7/8/1997 | 7/8/1997 | P | PASS |
|
|
|
07/08/97 338 - made ok MASN-REBAR OK sp insp ok
|
INSP - Footings | 7/3/1997 | 7/7/1997 | 7/7/1997 | A | PASS |
|
|
|
07/07/97 338 - pouring at 10 a.m. first 1/2 MASN-REBAR OK FTG -OK FOOTING sp insp ok
|
INSP-Conference | 5/28/1997 | 5/28/1997 | 5/28/1997 | P | PASS |
|
|
|
reviewed and approved hydrant locations
|