INSP - Conference | 6/29/1998 | 6/29/1998 | 6/29/1998 | | PART |
|
|
|
/ / 338 - TO SET UP TIME FOR P.M.INSPECTION
|
INSP - Final | 6/26/1998 | 6/29/1998 | 6/29/1998 | A | NR |
|
|
|
06/29/98 338 - blaine ###-#### NOT READY OCC REQ CARD NOT ON SITE
|
INSP - Final | 6/22/1998 | 6/23/1998 | 6/24/1998 | A | FAIL |
Jim Storey
|
|
|
06/24/98 301 - final blaine/###-####
|
INSP - Final | 6/10/1998 | 6/11/1998 | 6/11/1998 | A | PART |
|
|
|
06/12/98 338 - Office ###-#### Pager ###-#### Allan Reeser he will be around in the morning to meet you out there
|
INSP - Conference | 5/13/1998 | 5/13/1998 | 5/13/1998 | | PART |
|
|
|
/ / 338 - TEST OF EMERGENCY SYSTEMS FOR SMOKE EVAC SPRINKS AND ALARMS.
|
INSP-Alarm Testing | 4/30/1998 | 5/13/1998 | 5/13/1998 | A | PART |
Joe Tawney
|
|
|
05/13/98 406 - ALAN/###-#### - WITNESS AND TEST OF ALARM SYSTEM. 9AM REQ ALARM SYSTEM OK EXC RECALIBRATE BEAM DETECTOR & REPROGRAM MANUAL SWITCHE
|
INSP - Framing/Rough-in | 4/22/1998 | 4/22/1998 | 4/22/1998 | P | PART |
|
|
|
04/22/98 338 - ###-####/ALAN - RE-INSP. ON ABOVE CEILING GRID.
|
INSP - Framing/Rough-in | 4/16/1998 | 4/17/1998 | 4/17/1998 | A | PART |
|
|
|
04/17/98 338 - C/N MADE OK TO DROP IN TILE IINFO CO COME BY FAX ABOVE DR
|
INSP-Sprinkler Rough-in/Hydro | 4/17/1998 | 4/17/1998 | 4/17/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP-Supply line flush | 3/31/1998 | 3/31/1998 | 3/31/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Foundation | 3/9/1998 | 3/10/1998 | 3/11/1998 | P | PASS |
|
|
|
03/11/98 338 - footings not ready will recall will be ok to pour with sp
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/11/1998 | A | PART |
|
|
|
03/11/98 338 - partial framing allen ###-#### restrooms expansion made o
|
INSP - Conference | 3/10/1998 | 3/10/1998 | 3/10/1998 | | PASS |
|
|
|
/ / 338 - contr. changed insp on frame till early p.m. to be done with
|
INSP-Sprinkler Rough-in/Hydro | 3/6/1998 | 3/9/1998 | 3/9/1998 | A | PART |
Joe Tawney
|
|
|
03/09/98 406 - BATHROOM AREA 2ND FLOOR NORTH EAST CORNER ERICK ###-#### OK ON ROUGH IN FOR 2ND FLOOR
|
INSP - Framing/Rough-in | 2/18/1998 | 2/18/1998 | 2/18/1998 | P | NH |
Wes Worcester
|
|
|
02/18/98 342 - EXPANSION--ALAN ###-####--PARTIAL reached answering machi
|
INSP - Framing/Rough-in | 2/16/1998 | 2/17/1998 | 2/18/1998 | A | PART |
Wes Worcester
|
|
|
02/17/98 342 - screw off bottom plate, address penetrations in 1 hr corr blocking
|
INSP - Conference | 1/30/1998 | 2/3/1998 | 2/3/1998 | P | PASS |
|
|
|
02/03/98 338 - ###-#### 2:30 is the appointment doug t. (arch) will be there also
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | PASS |
|
|
|
01/21/98 338 - MASONARY\ALAN ###-#### ok to pour with spcl insp approva
|
INSP - Framing/Rough-in | 1/9/1998 | 1/9/1998 | 1/9/1998 | P | PART |
|
|
|
01/09/98 338 - ###-#### Allen grouting at 2pm masonry wall Strata willbe SP INSP APPROVAL
|
INSP - Conference | 12/11/1997 | 12/11/1997 | 12/12/1997 | P | PASS |
|
|
|
12/12/97 338 - met with allen walked the remodel anmd the project ok to floor when weather protection is in place. the special inspector is wit charge to confirm compliance
|
INSP - Framing/Rough-in | 12/10/1997 | 12/11/1997 | 12/12/1997 | A | PART |
|
|
|
12/11/97 338 - 2ND FLOOR alan called cancelled till tomorrow
|
INSP - Miscellaneous | 11/28/1997 | 12/1/1997 | 12/1/1997 | A | PASS |
|
|
|
12/01/97 338 - GROUT--ENGINEER LOOKING AT THIS ALSO made ok with the eng
|
INSP - Foundation | 10/2/1997 | 10/2/1997 | 10/2/1997 | P | PASS |
|
|
|
10/02/97 338 - SLAB-OK SLAB
|
INSP - Foundation | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
|
|
|
09/23/97 338 - MADE OK WITH THE BLESSING OF THE SPECIAL INSPECTOR
|
INSP - Carpentry | 9/17/1997 | 9/18/1997 | 9/18/1997 | A | FAIL |
|
|
|
09/18/97 338 - 12 foot to the south end and tapered to the north end ble c/n issued for the eng of record to submit fix and demo proceedures prio reconstruction. also stated ubc 3303 for pedestrial protection
|
INSP - Carpentry | 9/17/1997 | 9/17/1997 | 9/17/1997 | P | PASS |
|
|
|
09/17/97 338 - SPECIAL INSPECTION AT 12:00 AND 4:00 made ok with sp insp
|
INSP - Framing/Rough-in | 9/16/1997 | 9/16/1997 | 9/16/1997 | P | CANC |
|
|
|
09/16/97 338 - SPE. INSPECTOR WILL BE THERE AT 1:30 should be a masonry
|
INSP - Masonry | 9/16/1997 | 9/16/1997 | 9/16/1997 | | PASS |
|
|
|
/ / 338 - for grout cells and reinforcing ok with sp insp approval
|
INSP - Framing/Rough-in | 9/12/1997 | 9/15/1997 | 9/15/1997 | A | CANC |
|
|
|
09/15/97 338 - CENTER BLOCK GROUTING SPECIAL INSPECTOR AT 10:30 AND 3:30 masonry grout and reinf
|
INSP - Framing/Rough-in | 9/12/1997 | 9/15/1997 | 9/15/1997 | P | CANC |
|
|
|
09/15/97 338 - SPECIAL INSPECTIONthis is to be a masonry
|
INSP - Masonry | 9/15/1997 | 9/15/1997 | 9/15/1997 | | PASS |
|
|
|
/ / 338 - for p.m. bond beam r-bar and grout made ok only with sp insp approval
|
INSP - Masonry | 9/15/1997 | 9/15/1997 | 9/15/1997 | | PASS |
|
|
|
/ / 338 - bond beam and rebar
|
INSP - Masonry | 9/15/1997 | 9/15/1997 | 9/15/1997 | | PASS |
|
|
|
/ / 338 - for bond beam and reinf MASN-REBAR OK
|
INSP - Masonry | 9/14/1997 | 9/14/1997 | 9/14/1997 | | PASS |
|
|
|
/ / 338 - north wall to the 12' ele +- with sp insp approval
|
INSP - Miscellaneous | 9/11/1997 | 9/12/1997 | 9/14/1997 | A | PASS |
|
|
|
09/12/97 338 - made ik with sp inspa pproval MASN-REBAR OK
|
INSP - Foundation | 9/11/1997 | 9/11/1997 | 9/11/1997 | P | CANC |
|
|
|
09/11/97 338 - GROUTING MASNORY WALLS SPEC. INSPECTOR GROUTING AT 4 P.M. this sjould be a masonry insp
|
INSP - Masonry | 9/11/1997 | 9/11/1997 | 9/11/1997 | | PART |
|
|
|
/ / 338 - west wall to the 17' level ok with sp insp approval
|
INSP - Framing/Rough-in | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | CANC |
|
|
|
09/10/97 338 - Scheduled by Hello! on 09/10/97 at 08:42:30. pouring concrete for masonery walls
|
INSP - Masonry | 9/10/1997 | 9/10/1997 | 9/10/1997 | | PART |
|
|
|
/ / 338 - poured the 2nd bond bea at the 8-0"level west wall only
|
INSP - Miscellaneous | 9/8/1997 | 9/9/1997 | 9/9/1997 | A | PASS |
|
|
|
09/09/97 338 - cinderblock MASN-REBAR OK
|
INSP - Wall cover | 9/9/1997 | 9/9/1997 | 9/9/1997 | P | PART |
|
|
|
09/09/97 338 - CONCRETE MASONARY WALL HE WILL HAVE A SPECIAL INSPECTOR A need to have confomation of the lack f bond beam over the doorways plan calls for solid grouting to the 8'-0" height.
|