Permanent Occupancy | | 12/3/1998 | 12/3/1998 | | DONE |
|
|
|
|
INSP - Final | 11/16/1998 | 11/16/1998 | 11/16/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 10/29/1998 | 10/29/1998 | 10/29/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL ALARM PACKAGE AND MISC ITEMS
|
INSP - Framing/Rough-in | 2/6/1998 | 2/6/1998 | 2/9/1998 | P | PART |
|
|
|
02/06/98 338 - READY AT 1:00--RON PAGER ###-####c/n issued need to reswi soiled linen room per ubc 10 only 21 " clear with door in open position blocking corridor at the 90 degree pos.
|
INSP - Final | 1/30/1998 | 1/30/1998 | 1/31/1998 | P | PART |
|
|
|
01/30/98 338 - ron ###-#### pager ok for temp occ. f/x cabinets need to temp occ cert.
|
INSP - Final | 1/30/1998 | 1/30/1998 | 1/30/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR TEMP 0CC
|
INSP-Final Inspection | 1/29/1998 | 1/30/1998 | 1/30/1998 | A | FAIL |
Joe Tawney
|
|
|
01/30/98 406 - 8:30 am prescheduled with Joe ron pager ###-#### FINAL FAIL FIRE EXT DOORS ALARM RESUBMITTAL
|
INSP - Framing/Rough-in | 1/20/1998 | 1/20/1998 | 1/21/1998 | P | PART |
|
|
|
01/21/98 338 - FIRE WALLS 1ST FLOOR \\RON ###-#### VOICE PAGER part made corrections will check at the final
|
INSP - Framing/Rough-in | 1/6/1998 | 1/7/1998 | 1/7/1998 | A | PART |
|
|
|
01/07/98 338 - south most section 1st floor ok to drop in tiles
|
INSP - Framing/Rough-in | 1/5/1998 | 1/5/1998 | 1/5/1998 | P | NR |
|
|
|
01/05/98 338 - CEILING--OFFICE #5 \ not ready contractor will recall when so
|
INSP - Framing/Rough-in | 11/26/1997 | 11/26/1997 | 12/1/1997 | P | PASS |
|
|
|
12/01/97 338 - pass
|