Permit Information
Permit NumberBLD97-01218
StatusFinaled
Name DILLARDS DEPARTMENT STORE
Site Address 430 N MILWAUKEE ST
Project NameBTS - DILLARD'S
Customer Number 
ePlanReviewNo
Description
DILLARD'S DEPARTMENT STORE * SHELL PACKAGE FOR DILLARD'S BUILDING ONLY AND LANDSCAPE ADJACENT TO THE DILLARD'S BUILDING. BUILDING IS A 186540SF, THREE STORY WITH CONCRETE DECKS, NON-RATED EXTERIOR WALLS OF METAL STUDS WITH MASONRY VENEER AND OR EIFS SIDING, 4 HOUR AREA SEPARATION WALL AT MALL, FOUR STAIR ENCLOSURES, ONE ESCALATOR, ONE PASSENGER ELEVATOR, ONE FREIGHT ELEVATOR, A SUPPLY RECIEVING AREA, REST ROOMS, EQUIPMENT ROOMS PER APPROVED PLANS. DR#147-96 AND DR#16-97 CU#8-96 AND CU#106-86/MOD (PC#257-97) PARKING LOT, GRADING AND DRAINAGE UNDER PERMIT BLD97-1168. THIS PROJECT IS SUBJECT TO APPROVAL BY THE FIRE DEPARTMENT OF THE SECURITY DOORS AT THE MAIN ENTRANCES AND FIRE HYDRANTS. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT, A SEPARATE TENANT IMPROVEMENT PERMIT MUST BE OBTAINED PRIOR TO GRANTING OCCUPANCY. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/21/19987/22/19987/24/1998APASS
Details
07/22/98 338 - l/c Nd occ cert delivered
INSP-Final Inspection7/23/19987/23/19987/23/1998PPASS
DetailsJoe Tawney
07/23/98 406 - connie ###-#### REINSP OK FOR CERT OF COMPLETION ON SHELL
INSP - Final7/2/19987/2/19987/2/1998 PART
DetailsJoe Tawney
/ / 406 - FINAL OK FOR TEMP ON SHELL
INSP - Final6/17/19986/17/19986/17/1998 PART
DetailsJoe Tawney
/ / 406 - FINAL ON SPKLR SYSTEM ALARMS OK
INSP-Conference6/10/19986/10/19986/10/1998 PART
DetailsJoe Tawney
/ / 406 - WALK THRU OF 2ND AND 3RD FLOORS WITH PERRY AND GEN CONTR
INSP-Sprinkler Rough-in/Hydro6/4/19986/4/19986/4/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST FOR 1ST FLOOR
INSP-Sprinkler Rough-in/Hydro5/29/19985/29/19985/29/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TESTS FOR 2ND AND 3RD FLOORS
INSP-Supply line flush4/16/19984/16/19984/16/1998 PART
OK ON UNDERGROUND FLUSH
INSP-Sprinkler Rough-in/Hydro3/27/19983/27/19983/27/1998 PASS
DetailsJoe Tawney
/ / 406 - OK ON ROUGH IN OF FIRST FLOOR RISERS NOT YET INSTALLED
INSP - Framing/Rough-in1/20/19981/21/19981/21/1998APART
Details
this is a job review conference only
INSP-Sprinkler Rough-in/Hydro1/14/19981/14/19981/14/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR ROUGH IN FOR 2ND AND THIRD FLOORS & OK TO COVER
INSP - Framing/Rough-in1/5/19981/5/19981/5/1998PNR
Details
/ / 338 - they are only on the job site until 3:30 out of time will do thing E ISSUED # 014237
INSP - Framing/Rough-in12/17/199712/18/199712/18/1997PPART
Details
12/18/97 338 -
INSP - Framing/Rough-in12/3/199712/4/199712/4/1997APASS
Details
12/04/97 338 - made ok
INSP - Framing/Rough-in11/18/199711/19/199711/20/1997APASS
Details
made insp of the firestop product is ok
INSP - Framing/Rough-in11/12/199711/12/199711/12/1997PPART
Details
for 1st layer on the stair towers only
INSP - Framing/Rough-in10/29/199710/31/199710/31/1997PPASS
Details
OK TO START HANGING ROCK ON THE EXTERIOR WALLS AS THE FIRE PROOFING IS PLACED AT THE FLOOR LINE
INSP - Framing/Rough-in10/17/199710/20/199710/20/1997APART
Details
walk through only
INSP - Miscellaneous10/20/199710/20/199710/20/1997PPART
Details
GROUTING AT 1:00 made ok with sp insp approval
INSP - Miscellaneous9/30/199710/1/199710/2/1997PPASS
Details
10/02/97 338 - REBAR-GRADING made ok with the sp insp blessing
INSP - Foundation9/16/19979/17/19979/17/1997APASS
Details
09/17/97 338 - CONCRETE SLAB 2 full lenght bays on the 3rd floor south
INSP - Site Preparation9/12/19979/15/19979/15/1997ANR
Details
09/15/97 338 - SLAB not ready will recall for wed
INSP - Foundation9/2/19979/3/19979/3/1997APASS
Details
09/03/97 338 - POURED W/O INSP BY ME SP INSP MADE OK
INSP - Conference8/11/19978/11/19978/11/1997 CANC
Details
08/12/97 338 - THIS IS NOT A VALID PEMIT AT THIS TIME THIS INSP IS TO BE