INSP - Final | 7/21/1998 | 7/22/1998 | 7/24/1998 | A | PASS |
|
|
|
07/22/98 338 - l/c Nd occ cert delivered
|
INSP-Final Inspection | 7/23/1998 | 7/23/1998 | 7/23/1998 | P | PASS |
Joe Tawney
|
|
|
07/23/98 406 - connie ###-#### REINSP OK FOR CERT OF COMPLETION ON SHELL
|
INSP - Final | 7/2/1998 | 7/2/1998 | 7/2/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR TEMP ON SHELL
|
INSP - Final | 6/17/1998 | 6/17/1998 | 6/17/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL ON SPKLR SYSTEM ALARMS OK
|
INSP-Conference | 6/10/1998 | 6/10/1998 | 6/10/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - WALK THRU OF 2ND AND 3RD FLOORS WITH PERRY AND GEN CONTR
|
INSP-Sprinkler Rough-in/Hydro | 6/4/1998 | 6/4/1998 | 6/4/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR HYDRO TEST FOR 1ST FLOOR
|
INSP-Sprinkler Rough-in/Hydro | 5/29/1998 | 5/29/1998 | 5/29/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TESTS FOR 2ND AND 3RD FLOORS
|
INSP-Supply line flush | 4/16/1998 | 4/16/1998 | 4/16/1998 | | PART |
|
|
|
OK ON UNDERGROUND FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 3/27/1998 | 3/27/1998 | 3/27/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON ROUGH IN OF FIRST FLOOR RISERS NOT YET INSTALLED
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | PART |
|
|
|
this is a job review conference only
|
INSP-Sprinkler Rough-in/Hydro | 1/14/1998 | 1/14/1998 | 1/14/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN FOR 2ND AND THIRD FLOORS & OK TO COVER
|
INSP - Framing/Rough-in | 1/5/1998 | 1/5/1998 | 1/5/1998 | P | NR |
|
|
|
/ / 338 - they are only on the job site until 3:30 out of time will do thing E ISSUED # 014237
|
INSP - Framing/Rough-in | 12/17/1997 | 12/18/1997 | 12/18/1997 | P | PART |
|
|
|
12/18/97 338 -
|
INSP - Framing/Rough-in | 12/3/1997 | 12/4/1997 | 12/4/1997 | A | PASS |
|
|
|
12/04/97 338 - made ok
|
INSP - Framing/Rough-in | 11/18/1997 | 11/19/1997 | 11/20/1997 | A | PASS |
|
|
|
made insp of the firestop product is ok
|
INSP - Framing/Rough-in | 11/12/1997 | 11/12/1997 | 11/12/1997 | P | PART |
|
|
|
for 1st layer on the stair towers only
|
INSP - Framing/Rough-in | 10/29/1997 | 10/31/1997 | 10/31/1997 | P | PASS |
|
|
|
OK TO START HANGING ROCK ON THE EXTERIOR WALLS AS THE FIRE PROOFING IS PLACED AT THE FLOOR LINE
|
INSP - Framing/Rough-in | 10/17/1997 | 10/20/1997 | 10/20/1997 | A | PART |
|
|
|
walk through only
|
INSP - Miscellaneous | 10/20/1997 | 10/20/1997 | 10/20/1997 | P | PART |
|
|
|
GROUTING AT 1:00 made ok with sp insp approval
|
INSP - Miscellaneous | 9/30/1997 | 10/1/1997 | 10/2/1997 | P | PASS |
|
|
|
10/02/97 338 - REBAR-GRADING made ok with the sp insp blessing
|
INSP - Foundation | 9/16/1997 | 9/17/1997 | 9/17/1997 | A | PASS |
|
|
|
09/17/97 338 - CONCRETE SLAB 2 full lenght bays on the 3rd floor south
|
INSP - Site Preparation | 9/12/1997 | 9/15/1997 | 9/15/1997 | A | NR |
|
|
|
09/15/97 338 - SLAB not ready will recall for wed
|
INSP - Foundation | 9/2/1997 | 9/3/1997 | 9/3/1997 | A | PASS |
|
|
|
09/03/97 338 - POURED W/O INSP BY ME SP INSP MADE OK
|
INSP - Conference | 8/11/1997 | 8/11/1997 | 8/11/1997 | | CANC |
|
|
|
08/12/97 338 - THIS IS NOT A VALID PEMIT AT THIS TIME THIS INSP IS TO BE
|