INSP - Final | 5/11/1998 | 5/12/1998 | 5/12/1998 | A | PART |
Russ Owen
|
|
|
05/12/98 407 - NEED FINAL LETTER FROM SPECIAL INSPECTOR .
|
INSP-Final Inspection | 5/1/1998 | 5/1/1998 | 5/1/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved. TI for st lukes hosp. in progress
|
INSP-Final Inspection | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | CANC |
Rick Jackson
|
|
|
BLDG B--BRIAN ###-####--HE WILL CALL YOU TO SCHEDULE canc by brian of steed. alarm panel malfunction
|
INSP - Framing/Rough-in | 12/29/1997 | 12/30/1997 | 12/30/1997 | A | PART |
Russ Owen
|
|
|
12/30/97 407 - framing for mechanical & roof screens,ok as per plans.
|
INSP - Miscellaneous | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PART |
Russ Owen
|
|
|
welding,not a welding insp a conference about the roofing a stell joist need approval from engineer.
|
INSP - Framing/Rough-in | 11/17/1997 | 11/18/1997 | 11/18/1997 | P | PART |
Russ Owen
|
|
|
unable to stop by job ,but this requires special insp.
|
INSP - Wall cover | 11/3/1997 | 11/3/1997 | 11/4/1997 | P | PART |
Russ Owen
|
|
|
CONCRETE WALLS special inspection required.
|
INSP - Footings | 10/16/1997 | 10/17/1997 | 10/17/1997 | A | PART |
Russ Owen
|
|
|
10/17/97 407 - special inspection required.
|
INSP - Footings | 10/14/1997 | 10/15/1997 | 10/16/1997 | P | NR |
Russ Owen
|
|
|
10/15/97 407 - not ready, will require special insp.
|
INSP - Footings | 9/18/1997 | 9/19/1997 | 9/19/1997 | A | PART |
Russ Owen
|
|
|
09/19/97 407 - special inspection required ,contractor has them calledou
|