Permanent Occupancy | | 4/6/1998 | 4/6/1998 | | DONE |
|
|
|
|
INSP - Final | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | PASS |
Russ Owen
|
|
|
re-insp.
|
INSP-Final Inspection | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | PASS |
Rick Jackson
|
|
|
received letter from owner stating the sprinkler control valve will be installed within 18 months.
|
INSP-Final Inspection | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | FAIL |
Rick Jackson
|
|
|
trip test of dry sprinkler system - okay. sprinkler system now has over 100 heads, not monitored. no outside control valve.
|
INSP-Sprinkler Rough-in/Hydro | 1/22/1998 | 1/23/1998 | 1/23/1998 | P | PASS |
Rick Jackson
|
|
|
hydro passed.
|
INSP-Final Inspection | 1/20/1998 | 1/22/1998 | 1/22/1998 | P | NR |
Rick Jackson
|
|
|
01/22/98 409 - AROUND 1:00 PLEASE contractor not there
|
INSP - Final | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | PART |
Russ Owen
|
|
|
01/16/98 407 - left correction ok temp oc.
|
INSP-Final Inspection | 1/13/1998 | 1/14/1998 | 1/14/1998 | A | PART |
Rick Jackson
|
|
|
01/14/98 409 - sprinkler and life safty Dwayne ###-#### annual sprinkler test and wrong temperature sprinkler heads near heaters fab area.
|
INSP - Framing/Rough-in | 12/31/1997 | 1/2/1998 | 1/2/1998 | A | PASS |
Russ Owen
|
|
|
01/02/98 407 - added header for stairs,as per architect.
|
INSP - Framing/Rough-in | 12/22/1997 | 12/23/1997 | 12/23/1997 | A | PART |
Russ Owen
|
|
|
12/23/97 407 - left correction for fire blocking ,ok to cover the walls,
|
INSP - Framing/Rough-in | 12/17/1997 | 12/18/1997 | 12/18/1997 | A | PART |
Russ Owen
|
|
|
talked with contractor,1 handrail needs to extend 12" for cabo/ansi.
|
INSP - Framing/Rough-in | 12/11/1997 | 12/12/1997 | 12/12/1997 | A | PART |
Russ Owen
|
|
|
12/12/97 407 - ceilingok left correction will check at final.
|
INSP - Framing/Rough-in | 12/8/1997 | 12/9/1997 | 12/9/1997 | A | PART |
Russ Owen
|
|
|
12/09/97 407 - THIS IS A PORTION OF INTERIOR ONLY. STILL HAVE OTHER FRAM
|
INSP - Temporary occupancy | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PART |
Russ Owen
|
|
|
left corrections
|
INSP-Final Inspection | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PART |
Rick Jackson
|
|
|
11/26/97 409 - ASAP PLEASE approved temp occupancy of new shop and mezzanine must witness sprinkler test
|
INSP - Framing/Rough-in | 11/13/1997 | 11/14/1997 | 11/14/1997 | P | PASS |
|
|
|
11/14/97 333 - STORAGE AND DECK FRAME OK
|
INSP - Miscellaneous | 10/23/1997 | 10/24/1997 | 10/24/1997 | P | PART |
Russ Owen
|
|
|
10/24/97 407 - This is a one sided fire wall inspection, the wall design approved plans left a correction for Architect to submit a change order approval.
|
INSP - Foundation | 10/2/1997 | 10/2/1997 | 10/3/1997 | P | PASS |
Russ Owen
|
|
|
10/02/97 407 - slab inspection at idaho electric signs
|
INSP - Foundation | 9/29/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
Russ Owen
|
|
|
09/30/97 407 -
|
INSP - Foundation | 9/24/1997 | 9/25/1997 | 9/25/1997 | A | PASS |
Russ Owen
|
|
|
09/25/97 407 -
|
INSP - Footings | 9/17/1997 | 9/18/1997 | 9/19/1997 | P | PASS |
Russ Owen
|
|
|
09/18/97 407 - END OF DAY.insp columns only.
|