Permanent Occupancy | | 9/17/1997 | 9/17/1997 | | DONE |
|
|
|
|
INSP - Final | 9/3/1997 | 9/4/1997 | 9/4/1997 | P | PART |
|
|
|
09/04/97 338 - OK FOR THE TEMP
|
INSP - Final | 9/4/1997 | 9/4/1997 | 9/4/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 9/2/1997 | 9/3/1997 | 9/3/1997 | P | NR |
|
|
|
09/03/97 338 - CANCELLED BY THE CTR BY PHONE OTH-OTHER AGENCIES NOT APPROVED WILL RECALL FOR TOMORROW
|
INSP-Final Inspection | 9/2/1997 | 9/3/1997 | 9/3/1997 | A | FAIL |
Joe Tawney
|
|
|
09/03/97 406 - FINAL INSP FAIL BLDG ADDRESS FIRE EXT EXIT LIGHTS
|
INSP-Final Inspection | 8/28/1997 | 8/29/1997 | 8/29/1997 | A | CANC |
Joe Tawney
|
|
|
08/29/97 406 - CANCEL INSP WAS FOR SHELL BLD95-1455
|
INSP - Ceiling grid | 8/27/1997 | 8/27/1997 | 8/28/1997 | P | PART |
|
|
|
08/27/97 338 - part mede ok
|
INSP-Sprinkler Rough-in/Hydro | 8/15/1997 | 8/19/1997 | 8/19/1997 | P | FAIL |
Joe Tawney
|
|
|
08/19/97 406 - OK ON HYDRO TEST EXCEPT FDC PIPING CALL WHEN READY FOR FD
|
INSP-Sprinkler Rough-in/Hydro | 7/25/1997 | 7/28/1997 | 7/28/1997 | A | PART |
Joe Tawney
|
|
|
07/28/97 406 - AND A OVERHEAD HYDRO ALSO 9:30 am OK ON UNDERGROUND FLUSH AND SPKLR ROUGH IN NOT READY FOR OVERHEAD HYDRO
|
INSP - Framing/Rough-in | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | PASS |
|
|
|
07/25/97 338 - FRAM-OK FRAMING
|