THE LYNX CENTER * TO CONSTRUCT A NEW 50,775 SQ. FT., TWO STORY OFFICE AND RETAIL SHELL BUILDING CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALLS AND STEEL FRAME WITH CONCRETE FLOORS AND METAL STUD PARTITIONS. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR ALLOWABLE AREA INCREASES. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS.DR#2-97/PC#327-97/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final6/18/19986/18/19986/18/1998APASS
Details
made ok signed the perm col of the occ req card
INSP - Final6/16/19986/16/19986/16/1998PNR
Details
06/16/98 338 - NEED TO FINISH THE STAIR AREA INTERMEDIATE RAILING PROTEC
INSP - Final6/11/19986/11/19986/11/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION FOR SHELL
INSP-Final Inspection6/8/19986/9/19986/9/1998AFAIL
DetailsJoe Tawney
06/09/98 406 - Scheduled by Hello!. Contact phone is [8692072]. REINSP FAIL NFPA 72 FORM REPLACE 2 STROBES IN RESTROOMS
INSP-Final Inspection5/29/19985/29/19985/29/1998PFAIL
DetailsJoe Tawney
05/29/98 406 - Scheduled by Hello!. Contact phone is [8692072]. FINAL FAIL SPKLR HYDRO TEST ELEVATOR SHUNT TRIP
INSP-Final Inspection5/26/19985/26/19985/26/1998PFAIL
DetailsJoe Tawney
05/26/98 406 - Scheduled by Hello!. Contact phone is [8692072]. FINAL FAIL ALARM SYSTEM BLDG ADDRESS HYDRO TEST
INSP - Framing/Rough-in5/19/19985/19/19985/19/1998PPART
Details
made ok to drop in tiles in the core area fire caulk ok emergency switch boxes are not rated to be in the corridor wall
INSP-Sprinkler Rough-in/Hydro5/13/19985/13/19985/13/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR HYDRO TEST
INSP-Supply line flush4/6/19984/7/19984/7/1998APART
DetailsJoe Tawney
8:30 AS PER 406-LONNIE ###-#### ok on underground flush
INSP - Framing/Rough-in3/13/19983/13/19983/13/1998PPART
Details
03/13/98 338 - made ok for corridor drywall.
INSP - Framing/Rough-in3/9/19983/10/19983/10/1998ANR
Details
03/10/98 338 - not ready , need ele signoff for the walls of the corrido
INSP - Foundation10/27/199710/28/199710/28/1997APASS
Details
lynx center\\late am MADE OK WITH SP INSP APPROVAL
INSP - Foundation10/21/199710/22/199710/22/1997APASS
Details
made ok with sp insp approval
INSP - Footings9/22/19979/22/19979/22/1997PPASS
Details
09/22/97 338 - interior footing pads out of time #1 tomorrow