INSP - Final | 6/4/1998 | 6/4/1998 | 6/4/1998 | P | PASS |
|
|
|
06/05/98 333 - FNL -OK FINAL
|
Permanent Occupancy | | 6/4/1998 | 6/4/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/26/1998 | 5/27/1998 | 5/27/1998 | A | PASS |
Rick Jackson
|
|
|
###-#### occ approved per approved plans
|
INSP - Final | 4/9/1998 | 4/10/1998 | 4/10/1998 | P | PART |
|
|
|
temp ok cn placed
|
INSP - Final | 4/10/1998 | 4/10/1998 | 4/10/1998 | | PART |
|
|
|
04/10/98 333 - card signed for temp cn placed
|
INSP - Framing/Rough-in | 4/7/1998 | 4/10/1998 | 4/10/1998 | P | PASS |
|
|
|
temp ok cn placed
|
INSP - Framing/Rough-in | 4/7/1998 | 4/8/1998 | 4/8/1998 | A | PART |
|
|
|
not ready
|
INSP - Framing/Rough-in | 4/8/1998 | 4/8/1998 | 4/8/1998 | | PASS |
|
|
|
04/08/98 333 - conference on temp occ
|
INSP-Sprinkler Rough-in/Hydro | 4/1/1998 | 4/1/1998 | 4/1/1998 | A | PASS |
Rick Jackson
|
|
|
completed attic area. old portion of building complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/26/1998 | 3/27/1998 | 3/27/1998 | A | FAIL |
Rick Jackson
|
|
|
9:00 ###-#### attic area not covered.
|
INSP-Sprinkler Rough-in/Hydro | 3/10/1998 | 3/11/1998 | 3/11/1998 | P | PART |
|
|
|
michael ###-#### hydro passed, need to install sprinkler in soffit, north end of west area.
|
INSP - Miscellaneous | 11/19/1997 | 11/19/1997 | 11/19/1997 | P | FAIL |
|
|
|
11/19/97 333 - ceeptage beb dont do pits
|
INSP - Carpentry | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | PASS |
|
|
|
11/18/97 333 - FIRE WALLS ok ì
|
INSP - Wall cover | 11/17/1997 | 11/18/1997 | 11/18/1997 | A | FAIL |
Wes Worcester
|
|
|
11/18/97 342 - FIRE WALL IN ROOM 250 fire wall not to plan, not to specs looked at first layer of two hour assembly's...detail and resubmittal re
|
INSP - Wall cover | 11/4/1997 | 11/5/1997 | 11/5/1997 | A | PART |
|
|
|
11/05/97 333 - FIRE WALL IN ATTIC..
|