INSP-Final Inspection | 9/4/1998 | 9/4/1998 | 9/4/1998 | P | PASS |
Rick Jackson
|
|
|
earl ###-#### occ approved
|
Permanent Occupancy | | 4/3/1998 | 4/3/1998 | | DONE |
|
|
|
|
INSP - Final | 3/31/1998 | 4/1/1998 | 4/1/1998 | P | PASS |
Wes Worcester
|
|
|
03/31/98 342 - JEFF ###-#### ì
|
INSP - Framing/Rough-in | 3/26/1998 | 3/27/1998 | 3/27/1998 | P | PASS |
Wes Worcester
|
|
|
03/27/98 342 - jeff ###-#### ì
|
INSP-Final Inspection | 3/23/1998 | 3/23/1998 | 3/23/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved.
|
INSP - Wall cover | 3/19/1998 | 3/19/1998 | 3/19/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Wall cover | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | NR |
Wes Worcester
|
|
|
03/19/98 342 - DRY WALL ON FIRE WALL--JEFF ###-####
|
INSP-Final Inspection | 3/13/1998 | 3/13/1998 | 3/13/1998 | P | FAIL |
Rick Jackson
|
|
|
alarm plans, draft curtains, electrical box in attic
|
INSP-Sprinkler Rough-in/Hydro | 3/11/1998 | 3/13/1998 | 3/13/1998 | A | PASS |
Rick Jackson
|
|
|
BRUCE ###-####--GOOD SAMARITAN HOME was scheduled for wed but cancelled to wait for rick hydro completed
|
INSP-Sprinkler Rough-in/Hydro | 3/10/1998 | 3/11/1998 | 3/11/1998 | P | CANC |
Joe Tawney
|
|
|
03/11/98 406 - INSP CANCELLED
|
INSP - Framing/Rough-in | 3/9/1998 | 3/10/1998 | 3/10/1998 | A | PART |
Tom Arcoraci
|
|
|
03/10/98 408 - jess ###-####-fire wall dry wall BOILER ROOM HAS 2 LAYERS 5/8 ON CEILING EXT WALL EAST SIDE HAS 2 LAYERS ON EAVE
|
INSP - Framing/Rough-in | 2/26/1998 | 2/27/1998 | 2/27/1998 | P | PART |
Wes Worcester
|
|
|
02/27/98 342 - PLEASE MEET AT 2:00--JEFF ###-####
|
INSP - Framing/Rough-in | 2/24/1998 | 2/25/1998 | 2/25/1998 | A | NR |
Wes Worcester
|
|
|
02/25/98 342 - jeff ###-#### dry wall insp
|
INSP - Framing/Rough-in | 2/17/1998 | 2/18/1998 | 2/18/1998 | P | PART |
Wes Worcester
|
|
|
02/18/98 342 - ###-####
|
INSP - Framing/Rough-in | 2/13/1998 | 2/17/1998 | 2/17/1998 | A | PASS |
Wes Worcester
|
|
|
02/17/98 342 - SHEETROCK NAILING ###-#### JEFF
|
INSP - Final | 2/9/1998 | 2/9/1998 | 2/9/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - need electrical insp, address #'s, grading and replace soils front of house and garage side,etc
|
INSP - Framing/Rough-in | 2/6/1998 | 2/9/1998 | 2/9/1998 | A | NR |
Wes Worcester
|
|
|
02/08/98 342 - WING A--SHEET ROCK NAILING--JEFF ###-####
|
INSP - Wall cover | 2/9/1998 | 2/9/1998 | 2/9/1998 | | NH |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Wall cover | 2/6/1998 | 2/6/1998 | 2/6/1998 | P | PASS |
Wes Worcester
|
|
|
02/06/98 342 - jeff ###-#### sheet rock nailing
|
INSP - Framing/Rough-in | 2/3/1998 | 2/3/1998 | 2/3/1998 | P | PASS |
Wes Worcester
|
|
|
02/03/98 342 - SHEET ROCK NAILING--JEFF ###-####
|
INSP - Framing/Rough-in | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | PART |
Wes Worcester
|
|
|
01/23/98 342 - jeff-###-#### ì
|
INSP - Conference | 1/15/1998 | 1/15/1998 | 1/15/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - submit changes in duplicate for corridor draft stops and mec
|
INSP - Framing/Rough-in | 1/14/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Wes Worcester
|
|
|
01/14/98 342 - conf. ###-#### Jeff
|
INSP-Sprinkler Rough-in/Hydro | 1/14/1998 | 1/14/1998 | 1/14/1998 | A | PASS |
Rick Jackson
|
|
|
underground flush and hydro.
|
INSP - Conference | 1/13/1998 | 1/13/1998 | 1/13/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - submit area separation wall change
|
INSP - Framing/Rough-in | 1/12/1998 | 1/13/1998 | 1/13/1998 | A | PART |
Wes Worcester
|
|
|
01/13/98 342 -
|
INSP - Wall cover | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PASS |
Wes Worcester
|
|
|
12/23/97 342 - Scheduled by Hello!.
|
INSP - Wall cover | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | CANC |
|
|
|
Scheduled by Hello!. Cancelled by Hello! (Last update by [HLO]).
|
INSP - Conference | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PART |
Wes Worcester
|
|
|
12/22/97 342 -
|
INSP - Miscellaneous | 12/18/1997 | 12/19/1997 | 12/19/1997 | A | PART |
Wes Worcester
|
|
|
12/18/97 342 - WOULD LIKE AT 9 firecaulking all penetratiopns and r/r se
|
INSP - Framing/Rough-in | 12/11/1997 | 12/11/1997 | 12/11/1997 | P | PART |
Wes Worcester
|
|
|
12/11/97 342 - sheet rock nailing
|
INSP - Wall cover | 12/1/1997 | 12/2/1997 | 12/2/1997 | A | PART |
Wes Worcester
|
|
|
/ / 342 - PLEASE MEET JEFF AT 11:00--DRY WALL NAILING
|
INSP - Carpentry | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | PASS |
Wes Worcester
|
|
|
2hr wall 1st layer....frame inspection sent to Kim
|
INSP - Framing/Rough-in | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | NR |
|
|
|
12/01/97 333 - given to wes
|
INSP - Wall cover | 11/28/1997 | 12/1/1997 | 12/1/1997 | A | NR |
Wes Worcester
|
|
|
12/01/97 342 - would like at 11:00/ drywall nailing
|
INSP - Conference | 11/25/1997 | 11/26/1997 | 11/26/1997 | A | PART |
Wes Worcester
|
|
|
11/25/97 342 - WOULD LIKE AROUNND 10:30 OR 11:00 IF POSSIBLE
|
INSP - Conference | 11/19/1997 | 11/19/1997 | 11/19/1997 | P | PART |
Wes Worcester
|
|
|
11/19/97 342 - 3:30 pm
|
INSP - Conference | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | FAIL |
Wes Worcester
|
|
|
11/18/97 342 - he called back and around 3:00 met w/arch, plan ck & contractor, 1 hr wall fix detail updated, arch submitting details for const in lieu of a parapet 5' protection, area sep overhang, wall detail fix, wall detail for self supporting 2 hr area separation and details for all changes from approved plan
|
INSP - Conference | 11/17/1997 | 11/17/1997 | 11/17/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - still do not have resubmittals....schedule conf w/arch, owne plan check
|
INSP - Framing/Rough-in | 11/17/1997 | 11/17/1997 | 11/17/1997 | P | NR |
Wes Worcester
|
|
|
/ / 342 - two hour walls
|
INSP - Framing/Rough-in | 11/12/1997 | 11/12/1997 | 11/12/1997 | P | FAIL |
|
|
|
11/12/97 333 - unable to find super
|
INSP - Conference | 11/6/1997 | 11/6/1997 | 11/6/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - no details to date requested on previous c/n ....do not proc submitted
|
INSP - Miscellaneous | 11/6/1997 | 11/6/1997 | 11/6/1997 | P | NR |
Wes Worcester
|
|
|
11/06/97 342 - NAILING FOR DRYWALL--WING A needs to finish seams and sti from architect....detail required before proceeding and if not received week, job will be stopped
|
INSP - Framing/Rough-in | 11/4/1997 | 11/4/1997 | 11/4/1997 | P | PART |
Tom Arcoraci
|
|
|
after 2:45 fire wall first layer ok
|
INSP - Wall cover | 10/30/1997 | 10/30/1997 | 10/30/1997 | P | FAIL |
Wes Worcester
|
|
|
10/30/97 342 - SHEETROCK NAILING 1:30 pm
|
INSP - Miscellaneous | 10/28/1997 | 10/28/1997 | 10/28/1997 | P | NR |
Wes Worcester
|
|
|
10/28/97 342 - MASONARY ON BACK WALL WING A.....no one there
|
INSP - Miscellaneous | 10/28/1997 | 10/28/1997 | 10/28/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - epoxy set and rebar for grout pour wall A
|
INSP - Miscellaneous | 10/27/1997 | 10/27/1997 | 10/28/1997 | P | PART |
Wes Worcester
|
|
|
10/28/97 342 - MASONARY....met contractor and architect on site....doing
|
INSP - Foundation | 10/10/1997 | 10/13/1997 | 10/13/1997 | A | NR |
Wes Worcester
|
|
|
steel support for brick/ as early as possible please
|
INSP - Footings | 10/8/1997 | 10/9/1997 | 10/9/1997 | A | NR |
Wes Worcester
|
|
|
no rebar on site yet
|
INSP - Footings | 10/7/1997 | 10/8/1997 | 10/8/1997 | P | NR |
Wes Worcester
|
|
|
GOOD SAMARITAN....will look at in am Thurs
|
INSP - Conference | 1/28/1998 | 1/29/1998 | 1/29/1997 | P | PART |
Wes Worcester
|
|
|
###-#### 2418 REDWAY IS WERE THE CONFERENCE IS at 3:30 pm
|