INSP - Final | 5/3/1999 | 5/4/1999 | 5/4/1999 | A | PASS |
Jim Storey
|
|
|
05/04/99 301 - ###-#### DICK//FINAL @ QUIK LUBE
|
Permanent Occupancy | | 5/4/1999 | 5/4/1999 | | DONE |
|
|
|
|
INSP - Final | 11/23/1998 | 11/24/1998 | 11/23/1998 | A | PART |
|
|
|
11/24/98 338 - CLINT ###-#### MADEOK FOR TEMP PER CODE ENF. AND PLMG.
|
INSP-Final Inspection | 11/20/1998 | 11/23/1998 | 11/20/1998 | A | CANC |
Joe Tawney
|
|
|
CLINT ###-####
|
INSP - Final | 11/20/1998 | 11/20/1998 | 11/20/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 11/20/1998 | 11/20/1998 | 11/20/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 11/9/1998 | 11/10/1998 | 11/13/1998 | P | NR |
|
|
|
11/10/98 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 11/9/1998 | 11/10/1998 | 11/10/1998 | A | FAIL |
Joe Tawney
|
|
|
11/10/98 406 - PUT IN WRONG INSP SHOULD BE JOE FOR FIRE INSP FINAL FAIL EXIT DOOR HDWRE, ADDRESS, FIRE EXT,LIST OF F&C LIQUIDS
|
INSP - Framing/Rough-in | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | PASS |
|
|
|
10/19/98 338 - made ok to cover c/n removed
|
INSP - Framing/Rough-in | 10/1/1998 | 10/5/1998 | 10/5/1998 | A | NR |
|
|
|
10/05/98 338 - clint ###-#### c/n on site elec ok no plmg or htg need to seal horiz from vert
|
INSP - Foundation | 9/1/1998 | 9/2/1998 | 9/2/1998 | A | PART |
|
|
|
09/02/98 338 - suspended slab clint ###-#### made ok with sp insp approv
|
INSP - Framing/Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 | P | PART |
|
|
|
08/10/98 338 - MADE OK TO POUR THE BASEMENT WALLS AS THE R-BAR AND WELD
|
INSP - Framing/Rough-in | 7/30/1998 | 7/31/1998 | 7/31/1998 | A | PASS |
Jim Storey
|
|
|
07/31/98 301 - donnie ###-#### footing FTG -OK FOOTING
|