INSP - Final | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PASS |
Jim Sly
|
|
|
01/15/98 316 - Perm Occ on shell (Health and Welfare).
|
INSP - Final | 12/26/1997 | 12/26/1997 | 12/26/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR CERT OF COMPLETION ON SHELL
|
INSP-Final Inspection | 12/10/1997 | 12/19/1997 | 12/19/1997 | P | FAIL |
Joe Tawney
|
|
|
12/19/97 406 - FINAL ON SHELL FAIL BLDG ADDRESS SPKLR SYSTEM NOT TURNE
|
INSP-Sprinkler Rough-in/Hydro | 12/12/1997 | 12/12/1997 | 12/12/1997 | P | PASS |
Rick Jackson
|
|
|
12/12/97 409 - 3:00 AS PER RICK hydro fo sprinkler system
|
INSP-Sprinkler Rough-in/Hydro | 11/10/1997 | 11/10/1997 | 11/10/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - SPKLR ROUGH IN FAIL OVERSPACING AT WALLS AUX DRAIN
|
INSP-Sprinkler Rough-in/Hydro | 11/5/1997 | 11/5/1997 | 11/5/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST FOR SHELL
|
INSP-Supply line flush | 10/30/1997 | 10/30/1997 | 10/30/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Roof | 10/24/1997 | 10/27/1997 | 10/27/1997 | A | PASS |
Jim Sly
|
|
|
10/24/97 316 -
|
INSP - Roof | 10/22/1997 | 10/22/1997 | 10/22/1997 | P | PART |
Jim Sly
|
|
|
10/22/97 316 - ROOF-NAIL...West 75'...Call for insp of remaining roof...
|
INSP - Framing/Rough-in | 10/17/1997 | 10/17/1997 | 10/17/1997 | P | NR |
Tom Arcoraci
|
|
|
10/17/97 408 -
|
INSP - Footings | 9/26/1997 | 9/26/1997 | 9/26/1997 | P | PART |
Jim Sly
|
|
|
09/26/97 316 - OK pending special inspection approval..
|
INSP - Wall cover | 9/23/1997 | 9/26/1997 | 9/26/1997 | A | PART |
Jim Sly
|
|
|
09/25/97 316 - OK Pending special inspection and approval.
|
INSP - Wall cover | 9/23/1997 | 9/24/1997 | 9/24/1997 | P | PART |
Jim Sly
|
|
|
09/23/97 316 - CONCRETE TILT UPS OK Pending special insp approval..
|
INSP - Wall cover | 9/17/1997 | 9/19/1997 | 9/19/1997 | A | PART |
Jim Sly
|
|
|
09/18/97 316 - 47 YARDS POURING SLAB, REBAR SPEC INSPECTOR ON JOB SITE A SATURDAY OK Pending spec insp approval...
|
INSP - Wall cover | 9/17/1997 | 9/18/1997 | 9/18/1997 | A | PART |
Jim Sly
|
|
|
/ / 316 - CONCRETE SLAB, POURING 41 YEARDS, REBAR. OK pending spec i SPEC. INSPECTOR ON SITE
|
INSP - Foundation | 9/10/1997 | 9/11/1997 | 9/11/1997 | A | PART |
Jim Sly
|
|
|
09/10/97 316 - CONCRETE SLAB OK pending special inspection and approval
|
INSP - Foundation | 9/8/1997 | 9/8/1997 | 9/9/1997 | P | PART |
Jim Sly
|
|
|
09/08/97 316 - CONCRETE SLAB- Tilt up...OK pending spec insp approval..
|
INSP - Miscellaneous | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | PART |
Jim Sly
|
|
|
09/03/97 316 - OK pending spec insp approval...
|
INSP - Footings | 8/28/1997 | 8/29/1997 | 8/29/1997 | A | PART |
Jim Sly
|
|
|
08/28/97 316 - 28 YARDS 10:00 flatwork...OK pending spec insp approv...
|
INSP - Flatwork | 8/27/1997 | 8/27/1997 | 8/27/1997 | P | PART |
Jim Sly
|
|
|
08/27/97 316 - slab work on floor OK pending special insp approval...
|
INSP - Footings | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | FAIL |
|
|
|
08/26/97 338 - re-bar pouring at 1 p.m. POURED W/O CITY INSP 3500 PSI 1 SP INSP. NO SP INSP LETTER ON SITE
|