INSP - Final | 12/10/1997 | 12/11/1997 | 12/11/1997 | P | PASS |
Russ Owen
|
|
|
12/11/97 407 -
|
INSP - Letter of compliance | 12/11/1997 | 12/11/1997 | 12/11/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#12840,contractor ordered 2 temp windows,temporay boared w inspection when installed.
|
INSP - Letter of compliance | 12/11/1997 | 12/11/1997 | 12/11/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#12840,contractor ordered 2 temp windows,temporay boared w inspection when installed.
|
INSP - Final | 12/9/1997 | 12/10/1997 | 12/10/1997 | A | FAIL |
Russ Owen
|
|
|
12/10/97 407 - left corrections.
|
INSP - Wall cover | 9/30/1997 | 10/1/1997 | 10/1/1997 | A | PASS |
Russ Owen
|
|
|
10/01/97 407 - SHEER WALL IN THE BASEMENT. This wall completes foundatio engineer. also attached to enginering was rebar #4 ok at a tall section wall. This now completes foudation.
|
INSP - Energy code compliance | 9/25/1997 | 9/26/1997 | 9/26/1997 | A | PASS |
Russ Owen
|
|
|
09/26/97 407 -
|
INSP - Framing/Rough-in | 9/23/1997 | 9/24/1997 | 9/24/1997 | A | PASS |
Russ Owen
|
|
|
09/24/97 407 -
|
INSP - Framing/Rough-in | 9/19/1997 | 9/22/1997 | 9/22/1997 | A | FAIL |
Russ Owen
|
|
|
09/22/97 407 - left corrections.
|
INSP - Framing/Rough-in | 9/18/1997 | 9/19/1997 | 9/19/1997 | P | CANC |
Russ Owen
|
|
|
09/19/97 407 - will call in for monday am inspection.
|
INSP - Conference | 9/17/1997 | 9/17/1997 | 9/17/1997 | | PART |
Russ Owen
|
|
|
/ / 407 - talked with contractor about correction notice for straps le sheating,said he had a repair from engineer,told him not to cover the re wall where hold-down are untill inspection.
|
INSP - Conference | 9/17/1997 | 9/17/1997 | 9/17/1997 | | PART |
Russ Owen
|
|
|
/ / 407 - talked with contractor about correction notice for straps le sheating,said he had a repair from engineer,told him not to cover the re wall where hold-down are untill inspection.
|
INSP - Miscellaneous | 9/17/1997 | 9/15/1997 | 9/17/1997 | | PART |
Russ Owen
|
|
|
on mechanical insp,left a framing correction for stapHD,s let-into sheating. added this in 9/17/97.
|
INSP - Conference | 7/31/1997 | 7/31/1997 | 7/31/1997 | | PART |
Russ Owen
|
|
|
/ / 407 - foundation contractor called me,said the engineer has approv instead of #5 for horizontals, on the taller walls, said i would get a f asked to pour i said at your own risk.
|
INSP - Wall cover | 7/29/1997 | 7/29/1997 | 7/29/1997 | P | PART |
Russ Owen
|
|
|
07/29/97 407 - contractor has a revised detail for a butras on the far l will have detail from engineer. also the 8'to9' high walls call for #5 b horizontal have #4 bar need approval from engineer left correction and m number.
|
INSP - Footings | 7/24/1997 | 7/25/1997 | 7/25/1997 | P | PASS |
Russ Owen
|
|
|
07/25/97 407 - WILL BE READY AT 1 O'CLOCK footings ok.
|