Permanent Occupancy | | 12/23/1997 | 12/23/1997 | | DONE |
|
|
|
|
INSP - Final | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PASS |
Wes Worcester
|
|
|
12/22/97 342 - Hi, Parnelli! ì
|
INSP-Final Inspection | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PASS |
Rick Jackson
|
|
|
re-inspect of sprinkler head in conference room and verification of smoke evac modifications
|
INSP - Final | 10/31/1997 | 10/31/1997 | 10/31/1997 | P | PASS |
Wes Worcester
|
|
|
10/31/97 342 -
|
INSP-Final Inspection | 10/31/1997 | 10/31/1997 | 10/31/1997 | P | PART |
Rick Jackson
|
|
|
temp c/o approved. recheck smoke evac system dampers by 11/30.
|
INSP - Conference | 10/30/1997 | 10/30/1997 | 10/30/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - talked to Bob...called Dan 3 times
|
INSP - Final | 10/30/1997 | 10/30/1997 | 10/30/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - STAIRTOWER PENETRATIONS STILL NOT ALL FIRESTOPPED.....4-5 TR LEAST 1 FOR BOB
|
INSP - Final | 10/30/1997 | 10/30/1997 | 10/30/1997 | P | NR |
Wes Worcester
|
|
|
10/30/97 342 - have not rec'd smk exhaust exception
|
INSP - Conference | 10/29/1997 | 10/29/1997 | 10/29/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - met w/architect and vp of owner, need smoke evach system agr braced wall panels, fire dept approval as previously discussed
|
INSP - Final | 10/28/1997 | 10/29/1997 | 10/29/1997 | P | FAIL |
Wes Worcester
|
|
|
10/28/97 342 -
|
INSP-Final Inspection | 10/28/1997 | 10/29/1997 | 10/29/1997 | A | FAIL |
Rick Jackson
|
|
|
approved doors exiting BMC West to lobby area. smoke evacuation system not tested per building permit requirement.
|
INSP - Final | 10/23/1997 | 10/24/1997 | 10/24/1997 | P | NR |
Wes Worcester
|
|
|
10/24/97 342 -
|
INSP-Sprinkler Rough-in/Hydro | 10/23/1997 | 10/24/1997 | 10/24/1997 | A | FAIL |
Rick Jackson
|
|
|
alarm system not ready. c/n issued.
|
INSP - Framing/Rough-in | 9/15/1997 | 9/16/1997 | 9/16/1997 | P | PART |
Wes Worcester
|
|
|
09/16/97 342 - detail elevator shaft repair as necessary if required for
|
INSP - Conference | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | CANC |
Dave Lightfoot
|
|
|
09/10/97 337 - 1:30 pm w/arch, owner, drywall i have a meeting at the hotel at this time
|
INSP - Conference | 9/9/1997 | 9/10/1997 | 9/10/1997 | P | PART |
Wes Worcester
|
|
|
09/09/97 342 - AS PER WES 1:30
|
INSP - Conference | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | PASS |
Bob Archibald
|
|
|
Pre-con and clairification meeting w/ Wes, architect and maintence manager.
|
INSP - Conference | 9/9/1997 | 9/9/1997 | 9/9/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - schedule w/fire, mech, arch, owner, drywall/grid installer a
|
INSP - Framing/Rough-in | 9/8/1997 | 9/9/1997 | 9/9/1997 | P | NR |
Wes Worcester
|
|
|
09/09/97 342 - 3pm
|