Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD97-01876
StatusExpired
Name THE BON MARCHE
Site Address 370 N MILWAUKEE ST
Project NameBTS - THE BON MARCHE
Customer Number 
ePlanReviewNo
Description
BTS MALL BON MARCHE * PHASE I SHELL BUILDING ONLY, TO ADD APPROXIMATELY 28,862 SQ.FT. SINGLE STORY, CONCRETE MASONRY EXTERIOR WALL TYPE II ONE-HOUR FULLY FIRE SPRINKLER RETAIL SPACE TO THE EXISTING TWO STORY RETAIL FACILITY. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM WITH QUICK RESPONSE HEAD AND A SMOKE REMOVAL SYSTEM IS BEING USED FOR AREA INCREASE. THIS PERMIT IS FOR TH BUILDING SHELL AND CORE ONLY, THE CONSTRUCTION OF THE TEMPORARY PEDESTRIAN WALKWAY THROUGH THE CONSTRUCTION AREA TO MAINTAIN EGRESS FROM TNE EXISTING RETAIL AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. THE INTERIOR SHALL BE COMPLETED IN PHASE II ALONG WITH THE ENLARGEMENT OF AN EXISTING EXIT DOOR AND CORRIDOR AT THE SOUTH/WEST CORNER OF THE EXISTING BUILDING. LANDSCAPE DEVELOPMENT AND OTHER SITE WORK WITHIN THE AREA SHOWN IN THE CONTRACT DOCUMENTS SHALL BE PART OF THE WORK. THE BUILDING SITE PAD WILL BE CONSTRUCTED BY OTHERS. THIS PERMIT IS FOR A SHELL ONLY, THERE WILL NOT BE AN CERTIFICATE OF OCCUPANCY ISSUED FOR THIS PERMIT. SEPARATE PERMITS AND CERTIFICATE OF OCCUPANCY WILL BE REQUIRED FOR THE TENANT IMPROVEMNT PORTION OF THIS PROJECT. DR #36-97 PC#403-97 PARKING LOT EXPANSION BLD97-1168 * ADD INTERIOR SLAB TO SHELL AND CORE PERMIT. APPROVED 10/20/97.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final3/29/19983/29/19983/29/1998 PART
DetailsJoe Tawney
/ / 406 - OK FOR TEMP ON SHELL
INSP-Sprinkler Rough-in/Hydro3/16/19983/16/19983/16/1998PPASS
DetailsJoe Tawney
03/16/98 406 - MIKE WILL CALL TO SCHEDULE A TIME--###-#### OK ON HYDRO TEST
INSP-Sprinkler Rough-in/Hydro2/27/19982/27/19982/27/1998 PASS
DetailsJoe Tawney
/ / 406 - OK ON SPKLR ROUGH IN
INSP - Miscellaneous12/1/199712/1/199712/1/1997PPASS
Details
12/01/97 338 - madeok with the sp insp approval
INSP - Miscellaneous11/24/199711/25/199711/25/1997APASS
Details
11/25/97 338 - the Bon\mansonary made ok with sp insp approval
INSP - Miscellaneous11/17/199711/18/199711/18/1997APART
Details
11/18/97 333 - ok pending special insp report
INSP - Miscellaneous11/14/199711/14/199711/14/1997PPART
Details
MADE OK WITH SP INSP APPROVAL
INSP - Miscellaneous11/12/199711/13/199711/13/1997APASS
Details
MAD EOK WITH TH SP INSP APROVAL
INSP - Miscellaneous11/6/199711/7/199711/7/1997APART
DetailsTom Arcoraci
SPECIAL INSPECTOR ON SITE MASONARY\\BON
INSP - Miscellaneous11/4/199711/4/199711/4/1997PPART
Details
11/04/97 333 - ok pending special insp report
INSP - Miscellaneous10/28/199710/28/199710/28/1997PPASS
Details
made ok with sp insp approval
INSP - Miscellaneous10/27/199710/27/199710/27/1997PPASS
Details
MADE OK WITH THE SP INSP APPROVAL
INSP - Miscellaneous10/23/199710/24/199710/24/1997PPASS
Details
MASONARY AT THE BON mad eok with sp insp approval
INSP - Miscellaneous10/22/199710/23/199710/23/1997APASS
Details
MASONART/ THE BON made ok with the sp insp approval
INSP - Miscellaneous10/21/199710/21/199710/21/1997PPASS
Details
made ok with sp insp approval
INSP - Framing/Rough-in10/20/199710/20/199710/20/1997PPASS
Details
will pour at 1:00 MADE OK WITH SP INSP APPROVAL
INSP - Miscellaneous10/17/199710/17/199710/17/1997PPASS
Details
masonary made ok with the sp insp approval
INSP - Miscellaneous10/14/199710/14/199710/14/1997PPASS
Details
masonary made ok with sp insp approval
INSP - Miscellaneous10/13/199710/13/199710/13/1997PPASS
Details
MASONARY made ok with sp insp ok
INSP - Miscellaneous10/10/199710/10/199710/10/1997PPASS
Details
10/10/97 338 - MASONARY made ok with sp insp approval
INSP - Miscellaneous10/8/199710/8/199710/8/1997PPASS
Details
10/08/97 338 - MASONARY INSPECTION made ok with luthers ok
INSP - Footings10/7/199710/7/199710/7/1997PPASS
Details
10/07/97 333 - last 12 feet south wall
INSP - Footings10/6/199710/6/199710/6/1997PPASS
Details
10/06/97 338 - made ok with sp insp approval97 at 09:59:15.
INSP - Footings10/3/199710/3/199710/3/1997PPASS
Details
10/03/97 338 - made ok with the sp insp approvalt 09:51:52.
INSP - Footings10/1/199710/2/199710/2/1997APASS
Details
10/02/97 338 - made ok with sp insp blessing MASN-REBAR OK
INSP - Foundation9/24/19979/25/19979/25/1997PPASS
Details
09/26/97 338 - made ok with the sp insp approval for prisms and r-bar
INSP-Conference9/26/19979/25/19979/25/1997PPART
DetailsRick Jackson
conference about temp walkway through construction site
INSP - Foundation9/23/19979/24/19979/24/1997PPASS
Details
09/24/97 338 - special inspection made ok rebar placed MASN-REBAR OK
INSP - Footings9/22/19979/23/19979/23/1997PPASS
Details
09/23/97 338 - MADE OK WITH THE SP INSPECTION IS SIIGNED OFF
INSP - Conference9/22/19979/22/19979/22/1997 PASS
Details
/ / 338 - on the exiting and safetty of the public through the const a
INSP - Conference9/22/19979/22/19979/22/1997 PASS
Details
/ / 338 - on the exiting and safetty of the public through the const a
INSP - Footings9/19/19979/22/19979/22/1997PPASS
Details
09/22/97 338 - Scheduled by Hello! on 09/19/97 at 12:04:56. made ok with
INSP - Footings9/17/19979/18/19979/18/1997PPASS
Details
09/18/97 338 - made ok with the special inspectors approval
INSP - Footings9/17/19979/17/19979/17/1997 PART
Details
/ / 338 - c/n issued ubc 3306 must maintain exit ways through the cons
INSP - Footings9/16/19979/17/19979/17/1997PPASS
Details
09/17/97 338 - bon marche/100 ' with sp insp approval
INSP - Miscellaneous10/16/199710/16/19971/16/1997PPASS
Details
MADE OK WITH THE SP INSP APPROVAL
INSP - Foundation9/26/19979/29/19979/29/1907PCANC
Details
Scheduled by Hello! on 09/26/97 at 16:43:05.