Permit Information
Permit NumberBLD97-01943
StatusFinaled
Name GEM STATE PAPER
Site Address 10189 W EMERALD ST
Project NameGEM STATE PAPER
Customer Number 
ePlanReviewNo
Description
GEM STATE PAPER & SUPPLY COMPANY * TO CONSTRUCT A NEW 11920 SQ. FT. SINGLE STORY, CONCRETE MASONRY EXTERIOR WALL / MANUFACTURED METAL BUILDING, TYPE V NONRATED, RETAIL STORE WITH WAREHOUSE SPACE, FULLY FIRE SPRINKLERED. FIRE SPRINKLERS ARE BEING USED FOR AREA INCREASE. THE RETAIL AREA IS APPROXIMATELY 7763 SQ.FT. IN AREA, THE WAREHOUSE AREA IS APPROXIMATELY 2569 SQ.FT. IN AREA, THE REMAINING IS ACCESSORY USE AREA SUCH AS CONFERENCE ROOM OFFICE SPACE. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. PERMIT TO INCLUDE ON SITE IMPROVEMENTS, PARKING LOT AND LANDSCAPING. GRADING PERMIT ISSUED #BLD97-2768. MJP (PC#419-97) DR#52-97 FOUNDATION PERMIT ISSUED ON 11/07/97 NUMBER MIS97-0231.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/29/19989/29/19989/29/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC
INSP-Conference9/22/19989/22/19989/22/1998 PART
DetailsJoe Tawney
/ / 406 - CONF LEFT COPY OF C/N WITH BIRDIE MGR WITH REMAINING ITEM FO
INSP - Final6/11/19986/11/19986/11/1998 FAIL
DetailsJoe Tawney
/ / 406 - REINSP FAIL STILL NEED COPY OF NFPA 72 RECORD OF COMPLETION
INSP - Final4/21/19984/22/19984/22/1998APART
Details
still in fire testing mode ok for jtawney to initial card for me
INSP-Final Inspection4/21/19984/22/19984/22/1998APART
DetailsJoe Tawney
04/22/98 406 - OK FOR TEMP OCC
INSP - Final4/14/19984/15/19984/15/1998ANR
Details
04/15/98 338 - other agencies not approved correction issued with phone
INSP-Final Inspection4/15/19984/15/19984/15/1998 FAIL
FINAL FAIL ALARM SYST NOT READY EMERG LIGHTS EXIT LIGHTS BLDG ADDRESS PAINT AND LETTER CURBS
INSP-Sprinkler Rough-in/Hydro3/12/19983/12/19983/12/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND & ABOVE HYDRO TESTS OK ON REFLUSH OF UNDER
INSP - Energy code compliance3/5/19983/6/19983/6/1998APASS
Details
03/06/98 338 - made ok to cover insulation okken ###-####
INSP-Sprinkler Rough-in/Hydro3/4/19983/5/19983/5/1998PPART
DetailsJoe Tawney
03/05/98 406 - PLEASE MEET TROY AT 2:00--PAGER ###-#### OR OFFICE IS 887 OK ABOVE GRND HYDRO & ROUGH IN. UNDRGRND FAILED MUST REDO FLUSH WHEN RE
INSP-Supply line flush3/5/19983/5/19983/5/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH GEM STATE PAPER
INSP - Framing/Rough-in2/6/19982/9/19982/9/1998APASS
Details
02/09/98 338 - ###-#### ken framing rough in--AFTER 9:00 made ok need to insulation prior to cover to check for draft stopping . contr. to reque final for the mis permit on theis project asap need sp insp reports asap
INSP - Framing/Rough-in12/20/199712/19/199712/19/1997 PART
Details
12/19/97 338 - this is to be a masonry inspection should be sp inspectio
INSP - Framing/Rough-in12/20/199712/19/199712/19/1997 PART
Details
12/19/97 338 - this is to be a masonry inspection should be sp inspectio